ECB05/05/2009SEC. 28.201.1 FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER TO OBTAIN PERMIT. FOR AT CELLAR INSTALLED WATER & WASTE LINE FOR 3PC BATH PLUS GAS LINE. AS PER #34715716-X. REMEDY: OBTAIN D.O.B. WORK PERMITS.Nothing owed — awaiting certificate of correction
ECB10/10/2008WORK W/O A PERMIT WORK NOTED: AT CELLAR LEVEL INSTALLED WATER AND WASTE LINES FOR 3PCS BATH (TOILET,SINK,SHOWER) A RESIDENTIAL SINK AND GAS LINE WITH STOVE AT KITCHEN. REMEDY: OBTAIN PERMIT OR RESTORE TO PRIORNothing owed — awaiting certificate of correction
ECB10/10/2008WORK W/O A PERMIT. WORK NOTED: AT 1ST FLR LEVEL ERECTED FULL HEIGHT PARTITIONS TO CREATE 1 ROOM. INSTALLED WATER AND WASTE LINES FOR 2PC BATHROOM(TOILET,SINK). REMEDY: OBTAIN PERMIT OR RESTORE TO PRIOR LEGAL CONothing owed — awaiting certificate of correction
ECB10/10/2008RESIDENCE ALTERED FOR OCCUPANCY AS A DWELLING FOR MORE THAN THE LEGALLY APPROVED NUMBER OF FAMILIES. DEPARTMENT OF BUILDING RECORDS INDICATES PREMISES TO BE LEGALLY APPROVED FOR A 1 FAMILY. NOW PREMISES CONVERTNothing owed — awaiting certificate of correction
Two family converted from one family · 0.54 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.