| Owner | Filings | Most Recent |
|---|---|---|
| 2D CONSTRUCTION | 4 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 08/08/2025 | $167K | — | Private party → 145 REALTY CONSTRUCTION LLC | — not available |
| 09/03/2019 | $57K | — | — → — | — not available |
| 05/17/2019 | $52K | — | — → — | — not available |
| Firm | Filings | Most Recent |
|---|---|---|
| THINK DESIGN ARCHITECTURE | 7 | 04/15/2026 |
| A TECH ENGINEERING NYC, PLLC. | 1 | 04/28/2025 |
| Representative | Filings | Most Recent |
|---|---|---|
| THINK DESIGN ARCHITECTURE | 6 | 03/21/2026 |
| A TECH ENGINEERING NYC | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| 2D CONSTRUCTION CORP | General Contractor | 4 | 03/21/2026 |
| RITE-FLO P.H.& COOLING IN | Plumbing | 2 | 07/08/2026 |
| MAXIMUM CONTRACTING INC | General Contractor | 1 | 04/09/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| A TECH ENGINEERING NYC, P | 6738 | 5 | 04/15/2026 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Curb Cut | Signed-off | MAXIMUM CONTRACTING INC | 02/27/2026 |
| DOB NOW | Plumbing | Signed-off | DJ PLUMBING & HEATING COR | 12/23/2025 |
| DOB NOW | Plumbing | Signed-off | DJ PLUMBING & HEATING COR | 09/18/2025 |
| DOB NOW | General Construction | Permit Issued | 2D CONSTRUCTION CORP | 07/23/2025 |
| DOB NOW | Construction Fence | Signed-off | 2D CONSTRUCTION CORP | 07/11/2025 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/15/2026 | Signed-off | DJ PLUMBING & HEATING COR | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/07/2025 | Complete | CNB ELECTRICAL INC | General Wiring |
| Date | Type | Result | Report |
|---|---|---|---|
| 03/16/2026 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 03/05/2026 | Fail-Final Curb Cut Non-Directive 14 | Fail | View ↗ |
| 01/23/2026 | Certified Sprinkler (PL)-Sprinkler-Hydro | Certified | View ↗ |
| 01/16/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/09/2026 | Certified Sprinkler (PL)-Sprinkler-Hydro | Certified | View ↗ |
| 01/09/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/15/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 10/17/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/30/2025 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 09/30/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 09/25/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/17/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 05/06/2026 | Insulation placement and R values | anthony santoro | energy_progress |
| 05/06/2026 | Permanent certificate | anthony santoro | energy_progress |
| 05/06/2026 | Air barrier - visual inspection | anthony santoro | energy_progress |
| 05/06/2026 | Fenestration and door U-factor and product ratings | anthony santoro | energy_progress |
| 05/06/2026 | Duct leakage testing, insulation and design | anthony santoro | energy_progress |
| 05/06/2026 | Interior lighting power | anthony santoro | energy_progress |
| 05/06/2026 | Ventilation and air distribution system | anthony santoro | energy_progress |
| 05/06/2026 | Metering | anthony santoro | energy_progress |
| 05/06/2026 | Fenestration areas | anthony santoro | energy_progress |
| 05/06/2026 | HVAC-R and service water heating system controls | anthony santoro | energy_progress |
| 05/06/2026 | Maintenance information | anthony santoro | energy_progress |
| 05/06/2026 | Electric vehicle service equipment requirements | anthony santoro | energy_progress |
| 05/06/2026 | Subsurface Conditions – Fill Placement & In-Place Density | anthony santoro | special |
| 05/06/2026 | Subgrade Inspections | anthony santoro | special |
| 05/06/2026 | Fire-Resistant Penetrations and Joints | anthony santoro | special |
| 05/06/2026 | Masonry | anthony santoro | special |
| 05/06/2026 | Mechanical Systems | anthony santoro | special |
| 05/06/2026 | Structural Wood Frame | anthony santoro | progress |
| 05/06/2026 | Final | anthony santoro | progress |
| 05/06/2026 | Footing and Foundation | anthony santoro | progress |
| 05/06/2026 | Air barrier — testing | anthony santoro | energy_progress |
| 05/06/2026 | HVAC-R and service water heating equipment | anthony santoro | energy_progress |
| 05/06/2026 | Fenestration air leakage | anthony santoro | energy_progress |
| 05/06/2026 | Protection of exposed foundation insulation | anthony santoro | energy_progress |
| 05/06/2026 | Subsurface Investigations (Borings/Test Pits) | anthony santoro | special |