← Back
Two stories - detached, small or mid-size
167-40 118 AVENUE
QUEENS · Baisley Park · BIN 4268007
💬 Discuss this project
1930Year Built
2.5Stories
A1Building Class
R3AZoning
1,184 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,700 sf lot · 0.44 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/09/2021$698K—EZ EMPTY, LLC → Private party$590/sf building
10/26/2020$370K—Private party → EZ EMPTY, LLC$312/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR110/09/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281110/09/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
02/09/2026
Signed off — Alteration
installation of solar panels, rooftop, railed, grid-tied, 22 modules, 9.46 KWYSTEM SIZE (DC ): 9.46 KW SYSTEM SIZE (AC ): 7.92 KVA 22 MODULES: HANWHA Q.TRON BLK M-G2+ 430(MS) (SAFE HARBOR MODULE: 0) 22 INVERTERS: ENPHASE IQ8HC-72-M-DOM-US-208V
Q01300374-I1
10/23/2025
Permit issued — Solar
Q01300374-I1-SL
10/09/2025
Filed — Alteration
installation of solar panels, rooftop, railed, grid-tied, 22 modules, 9.46 KWYSTEM SIZE (DC ): 9.46 KW SYSTEM SIZE (AC ): 7.92 KVA 22 MODULES: HANWHA Q.TRON BLK M-G2+ 430(MS) (SAFE HARBOR MODULE: 0) 22 INVERTERS: ENPHASE IQ8HC-72-M-DOM-US-208V
Q01300374-I1
10/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
10/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
10/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
10/09/2025
Special inspection requirement — Final
Mina Makar
10/09/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR10/23/2025
2 projects · most recent 11/19/2025
FiledStatusContractorScope
11/19/2025CompleteISLAND ELECTRIC CORP—
11/15/2022CompleteC.L. ELECTRIC CORP1 meters, 1 new_meters
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/09/2025Fire-Resistant Penetrations and JointsMina Makarspecial
10/09/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
10/09/2025Energy Code Compliance InspectionsMina Makarprogress
10/09/2025FinalMina Makarprogress
10/09/2025Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/18/2026Q01300374-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026Q01300374-I1Open ↗
08/24/2026Q01300374-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/18/2026Q01300374-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026Q01300374-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/18/2026Q01300374-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01300374-I1Open ↗