← Back
Walk-up apt, over six families with stores
167 EAST BROADWAY
MANHATTAN · Chinatown-Two Bridges · BIN 1003626
💬 Discuss this project
1910Year Built
5Stories
C7Building Class
R7-2Zoning
11,063 sfGross Floor Area
17Units
Rent Stabilized4 Open Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: MILLENNIUM DRAGON REALTY INC. · 2,612 sf lot · 4.24 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Floor 13p · 1 filing · 5 docs
Cellar2p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MILLENNIUM DRAGON REALTY INC2207/08/2026
DRAGON RLTY PMB 568 MILLE103/22/2026
OWNER OF 167 E BROADWAY103/22/2026
EXCEL REALTY GROUP203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEON SKVIRSKY PE107/15/2025
FANG ARCHITECT602/23/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BUILDING BROTHERS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GREAT ONE CONSTRUCTION LLGeneral Contractor207/08/2026
K & BH PLUMBING & HTG INCPlumbing207/08/2026
AMERICAN POWER ELECT CONSElectrical103/22/2026
FM95 NYScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FANG ARCHITECT5513602/23/2024
Building Lifecycle
All (65)Filed (7)Permit Issued (5)Signed Off (3)Violation (27)Inspection (5)Special Inspection (18)
04/29/2026
Violation issued (HPD, closed)
A
08/14/2025
Permit issued — Sign
M01244273-I1-SG
07/15/2025
Filed — Alteration
INSTALL NON-ILLUMINATED SIGN ON EXTERIOR WALL (REIGN 167)
M01244273-I1
06/20/2025
Special inspection requirement — Final
LEON SKVIRSKY
06/04/2025
Violation issued (HPD, closed)
A
03/04/2024
Permit issued — General Construction
M01009672-I1-GC
02/23/2024
Filed — Alteration
INTERIOR RENOVATION OF EXISTING RETAIL STORE ON 1ST FLOOR AND CELLAR. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
M01009672-I1
02/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
02/23/2024
Special inspection requirement — Concrete - Cast-In-Place
DEZHANG FANG
02/22/2024
Special inspection requirement — Tenant Protection Plan Compliance
DEZHANG FANG
02/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
01/29/2024
Signed off — Alteration
TO INSTALL A NEW INTERIOR PARTITION IN APT #4 ON 2ND FLOOR. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
M00950820-I1
01/19/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
01/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
DEZHANG FANG
12/29/2023
Signed off — Alteration
INSTALL HOT WATER BOILER AT CELLAR FOR AN EXIST. 5-STORY MIXED-USE BUILDING. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
M00948066-I1
12/29/2023
Signed off — Alteration
INSTALL HOT WATER BOILER AT CELLAR FOR AN EXIST. 5-STORY MIXED-USE BUILDING. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
M00948066-S1
12/29/2023
Filed — Alteration
TO INSTALL A NEW INTERIOR PARTITION IN APT #4 ON 2ND FLOOR. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
M00950820-P1
12/26/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
12/21/2023
Special inspection requirement — Tenant Protection Plan Compliance
DEZHANG FANG
12/19/2023
Filed — Alteration
INSTALL HOT WATER BOILER AT CELLAR FOR AN EXIST. 5-STORY MIXED-USE BUILDING. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
M00948066-P1
12/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
12/19/2023
Special inspection requirement — Tenant Protection Plan Compliance
12/18/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/07/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/05/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/21/2023
Permit issued — Plumbing
M00948066-S1-PL
11/20/2023
Permit issued — General Construction
M00950820-I1-GC
11/08/2023
Permit issued — Boiler Equipment
M00948066-I1-BE
10/19/2023
Filed — Alteration
TO INSTALL A NEW INTERIOR PARTITION IN APT #4 ON 2ND FLOOR. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
M00950820-I1
10/13/2023
Filed — Alteration
INSTALL HOT WATER BOILER AT CELLAR FOR AN EXIST. 5-STORY MIXED-USE BUILDING. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
M00948066-I1
10/13/2023
Filed — Alteration
INSTALL HOT WATER BOILER AT CELLAR FOR AN EXIST. 5-STORY MIXED-USE BUILDING. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
M00948066-S1
10/13/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
10/13/2023
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
10/13/2023
Special inspection requirement — Maintenance information
DEZHANG FANG
10/13/2023
Special inspection requirement — Tenant Protection Plan Compliance
DEZHANG FANG
10/13/2023
Special inspection requirement — Heating Systems
DEZHANG FANG
10/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
10/13/2023
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
09/21/2023
Violation issued (ECB, closed)
Construction
09/21/2023
Violation issued (ECB, closed)
Boilers
04/01/2021
Violation issued (HPD, closed)
A
10/25/2016
Violation issued (HPD, closed)
I
08/11/2014
Violation issued (HPD, closed)
C
08/11/2014
Violation issued (HPD, closed)
B
08/11/2014
Violation issued (HPD, closed)
B
08/11/2014
Violation issued (HPD, closed)
B
08/11/2014
Violation issued (HPD, closed)
B
08/11/2014
Violation issued (HPD, closed)
B
08/11/2014
Violation issued (HPD, closed)
A
08/11/2014
Violation issued (HPD, closed)
C
08/11/2014
Violation issued (HPD, closed)
B
08/11/2014
Violation issued (HPD, closed)
C
08/11/2014
Violation issued (HPD, closed)
B
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/13/2005
Violation issued (ECB, closed)
Construction
09/13/2005
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/20/2004
Violation issued (HPD, open)
C
12/20/2004
Violation issued (HPD, open)
C
Latest 60 of 65 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignPermit IssuedRED HOOK SIGN AND ELECT08/14/2025
DOB NOWGeneral ConstructionPermit IssuedGREAT ONE CONSTRUCTION LL03/04/2024
DOB NOWPlumbingSigned-offK & BH PLUMBING & HTG INC11/21/2023
DOB NOWGeneral ConstructionSigned-offGREAT ONE CONSTRUCTION LL11/20/2023
DOB NOWBoiler EquipmentSigned-offK & BH PLUMBING & HTG INC11/08/2023
BISOTISSUEDLAKHI GENERAL CONTRACTOR03/22/2006
BISEQISSUEDLAKHI GENERAL CONTRACTOR03/22/2006
BISPLISSUEDDEMAR PLUMBING CORP07/15/2004
BISBLISSUEDDEMAR PLUMBING CORP07/15/2004
BISOTISSUEDKBU CONST INC.06/19/2001
BISPLISSUEDSAFEPIPE PLUMBING INC09/14/1994
BISFPISSUEDILG MECH SERVICES, INC12/29/1993
BISOTISSUEDMEN KEE CO.,INC.12/03/1993
BISEQISSUEDMAN KEE CONST.,INC.03/25/1991
BISOTISSUEDMAN KEE CONST.,INC.03/25/1991
1 project · most recent 11/21/2024
General Wiring
FiledStatusContractorScope
11/21/2024Permit IssuedAMERICAN POWER ELECT CONSGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/19/2024Pass-Final General Construction Non-Directive 14PassView ↗
12/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/18/2023Fail-Final General Construction Non-Directive 14FailView ↗
12/07/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/05/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
06/20/2025FinalLEON SKVIRSKYprogress
02/23/2024Fire-Resistance Rated ConstructionDEZHANG FANGprogress
02/23/2024Concrete - Cast-In-PlaceDEZHANG FANGspecial
02/22/2024Tenant Protection Plan ComplianceDEZHANG FANGspecial
02/22/2024Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
01/16/2024Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
01/16/2024Tenant Protection Plan ComplianceDEZHANG FANGspecial
12/21/2023Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
12/21/2023Tenant Protection Plan ComplianceDEZHANG FANGspecial
12/19/2023Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
12/19/2023Tenant Protection Plan Compliance—special
10/13/2023HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
10/13/2023HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
10/13/2023Maintenance informationDEZHANG FANGenergy_progress
10/13/2023Tenant Protection Plan ComplianceDEZHANG FANGspecial
10/13/2023Heating SystemsDEZHANG FANGspecial
10/13/2023Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
10/13/2023HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/29/2026M00948066-P1Request digital key ↗
08/29/2026M00948066-I1Request digital key ↗
08/29/2026M00948066-S1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/29/2026M00948066-S1Open ↗
08/28/2026M00950820-I1Open ↗
08/27/2026M01009672-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026M00948066-I1Open ↗
09/01/2026M00948066-P1Open ↗
08/28/2026M00950820-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/23/2026M00948066-I1Open ↗
08/28/2026M01244273-I1Open ↗
08/23/2026M01009672-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/28/2026M00950820-I1Open ↗
08/27/2026M01009672-I1Open ↗
08/13/2026M00950820-P1Open ↗