167 HAGAMAN PLACE
STATEN ISLAND · Port Richmond · BIN 5149234
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
Electrical
Roof1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR106/28/2024
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281106/28/2024
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
05/22/2025
Signed off — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 22 Panels, 9.02 kW
S01072873-I1
07/02/2024
Permit issued — Solar
S01072873-I1-SL
06/28/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 22 Panels, 9.02 kW
S01072873-I1
06/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
06/26/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
06/26/2024
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
06/26/2024
Special inspection requirement — Final
Mina Makar
06/26/2024
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR07/02/2024
BIS—ISSUEDR & S PRECISION CONSTRUCTION05/01/2007
BISEQISSUEDR & S PRECISION CONSTRUCTION05/01/2007
BISPLISSUEDPLUMBING CONSULTANT CO12/08/2006
BISEQISSUEDC.PAPAS CONSTRUCTION CORP11/17/2006
BIS—ISSUEDC.PAPAS CONSTRUCTION CORP11/17/2006
BISEQISSUEDMIRANCO CONTRACTING, INC08/18/2006
BIS—ISSUEDMIRANCO CONTRACTING, INC08/18/2006
1 project · most recent 06/28/2024
FiledStatusContractorScope
06/28/2024CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/26/2024Fire-Resistant Penetrations and JointsMina Makarspecial
06/26/2024Structural Stability – Alterations of existing buildingsMina Makarspecial
06/26/2024Energy Code Compliance InspectionsMina Makarprogress
06/26/2024FinalMina Makarprogress
06/26/2024Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026S01072873-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026S01072873-I1Open ↗
08/27/2026S01072873-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01072873-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026S01072873-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01072873-I1Open ↗