← Back
Two family brick
167 KINGSTON AVENUE
BROOKLYN · Crown Heights (North) · BIN 3031056
💬 Discuss this project
1901Year Built
2Stories
B1Building Class
R6Zoning
2,451 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two family brick · 2,042 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/16/2018$1.2M—C & J ACQUISITION LLC → Private party$510/sf building
10/24/2017$925K—Private party → C&J ACQUISITIONS LLC$377/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JON PAUL DESIGN & CONSULTING110/22/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JON PAUL DESIGN & CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BLUE CHIP PAINTING AND COGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASE ENGINEERING PLLC5785110/22/2021
Building Lifecycle
All (27)Filed (1)Permit Issued (1)Signed Off (1)Violation (2)Inspection (4)Objection (4)Special Inspection (14)
05/04/2023
Signed off — Alteration
General construction work to erect new exterior steel deck & stair down to rear yard from 1st floor & convert existing window to door for access to proposed deck. No change to egress, use or occupancy
B00577521-I1
11/03/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/28/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/24/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/18/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/26/2022
Permit issued — General Construction
B00577521-I1-GC-CX
01/03/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Soorjbally Harilall
01/03/2022
Special inspection requirement — Insulation placement and R values
alon egozi
10/25/2021
Objection raised — Structural
10/25/2021
Objection resolved — Addressed
10/25/2021
Objection raised — Admin
10/25/2021
Objection resolved — Addressed
10/22/2021
Filed — Alteration
General construction work to erect new exterior steel deck & stair down to rear yard from 1st floor & convert existing window to door for access to proposed deck. No change to egress, use or occupancy
B00577521-I1
08/16/2021
Special inspection requirement — Concrete - Cast-In-Place
alon egozi
08/16/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
alon egozi
08/16/2021
Special inspection requirement — Masonry
alon egozi
08/16/2021
Special inspection requirement — Post-installed Anchors
alon egozi
08/16/2021
Special inspection requirement — Structural Steel - Details
alon egozi
08/16/2021
Special inspection requirement — Final
alon egozi
08/16/2021
Special inspection requirement — Air barrier - visual inspection
alon egozi
08/16/2021
Special inspection requirement — Fenestration areas
alon egozi
08/16/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
alon egozi
08/16/2021
Special inspection requirement — Fenestration air leakage
alon egozi
08/16/2021
Special inspection requirement — Energy Code Compliance Inspections
alon egozi
08/16/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
alon egozi
11/08/2019
Violation issued (HPD, closed)
I
11/01/2018
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBLUE CHIP PAINTING AND CO04/26/2022
1 project · most recent 07/15/2020
General Wiring
FiledStatusContractorScope
07/15/2020CompleteSUPER CHARGED ELEC. INC.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/03/2022Pass-Final General Construction Non-Directive 14PassView ↗
10/28/2022Fail-Final General Construction Non-Directive 14FailView ↗
10/24/2022Fail-Final General Construction Non-Directive 14FailView ↗
10/18/2022Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
01/03/2022Subsurface Investigations (Borings/Test Pits)Soorjbally Harilallspecial
01/03/2022Insulation placement and R valuesalon egozienergy_progress
08/16/2021Concrete - Cast-In-Placealon egozispecial
08/16/2021Fire-Resistant Penetrations and Jointsalon egozispecial
08/16/2021Masonryalon egozispecial
08/16/2021Post-installed Anchorsalon egozispecial
08/16/2021Structural Steel - Detailsalon egozispecial
08/16/2021Finalalon egoziprogress
08/16/2021Air barrier - visual inspectionalon egozienergy_progress
08/16/2021Fenestration areasalon egozienergy_progress
08/16/2021Fenestration and door U-factor and product ratingsalon egozienergy_progress
08/16/2021Fenestration air leakagealon egozienergy_progress
08/16/2021Energy Code Compliance Inspectionsalon egoziprogress
08/16/2021Structural Stability – Alterations of existing buildingsalon egozispecial
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/14/2026B00577521-I1Request digital key ↗
▸Applications & Permits1
▸DOB NOWLPC Approval/Permit1
08/14/2026B00577521-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026B00577521-I1Open ↗
08/25/2026B00577521-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026B00577521-I1Open ↗
08/25/2026B00577521-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/31/2026B00577521-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/14/2026B00577521-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/14/2026B00577521-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWTR4 Plot Diagram1
08/14/2026B00577521-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/14/2026B00577521-I1Open ↗
▸DOB NOWSOIL REPORT1
08/14/2026B00577521-I1Open ↗