← Back
BuildNYC
Cape Cod
167 NIXON AVENUE
STATEN ISLAND · BIN 5014651
💬 Discuss this project
1955Year Built
1.67Stories
A0Building Class
R1-2Zoning
2,300 sfGross Floor Area
1Units
Cape Cod · 11,820 sf lot · 0.19 FAR built · Flood zone X
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRoof mounted solar energy photovoltaic electrical system ins1p · 1 filing · 10 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
James A Clancy212/29/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Arc Design and Consulting403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Ficazzola ConsultingGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
James A Clancy9176212/29/2025
Building Lifecycle
01/02/2026
Signed off — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01322553-I1
12/29/2025
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01322553-P1
12/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Clancy
12/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
James Clancy
12/29/2025
Special inspection requirement — Energy Code Compliance Inspections
James Clancy
9 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offFicazzola Consulting12/02/2025
1 project · most recent 11/19/2025
FiledStatusContractorScope
11/19/2025CompleteAmber Electl Contng—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/29/2025Fire-Resistant Penetrations and JointsJames Clancyspecial
12/29/2025Structural Stability – Alterations of existing buildingsJames Clancyspecial
12/29/2025Energy Code Compliance InspectionsJames Clancyprogress
12/29/2025FinalJames Clancyprogress
12/29/2025Air barrier - visual inspectionJames Clancyenergy_progress
10 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account