← Back
Walk-up apt, over six families with stores
333 EAST HOUSTON STREET
MANHATTAN · BIN 1004140
💬 Discuss this project
1920Year Built
6Stories
C7Building Class
R8AZoning
10,239 sfGross Floor Area
10Units
Rent Stabilized25 Open Violations 24 unresolved · 1 paperwork only ▸FDNY Report ↗
Walk-up apt, over six families with stores · 2,000 sf lot · 5.12 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof6p · 2 filings · 15 docs
Floor 58p · 3 filings · 20 docs
Floor 4
Floor 3
Floor 2
Floor 1
1 job · most recent 09/09/2021
Gas Water/Sanitary
FiledStatusContractorScope
09/09/2021Permit IssuedA P PLUMBING&HEATING INCGas, Water/Sanitary
3 jobs · most recent 01/26/2024
General Wiring
FiledStatusContractorScope
01/26/2024CompletePRINCIPAL ELECTRIC CORPGeneral Wiring
07/17/2023Permit IssuedRICHARD NEU—
04/19/2021Permit IssuedTOP SHELF ELECTRIC CORP—
Building Lifecycle
All (82)Filed (7)Permit Issued (5)Signed Off (2)Violation (41)Inspection (3)Objection (1)Special Inspection (23)
11/17/2025
Violation issued (HPD, closed)
I
12/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
07/16/2024
Objection raised — Energy
06/04/2024
Filed — Alteration CO
M08020416-S1
06/04/2024
Special inspection requirement — Tenant Protection Plan Compliance
12/15/2023
Signed off — Alteration
M00903459-I1
12/15/2023
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00903457-I1
11/28/2023
Violation issued (ECB, open)
Construction
07/14/2023
Filed — Alteration
M00903459-I1
07/14/2023
Permit issued — Supported Scaffold
M00903459-I1-SF
07/13/2023
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00903457-I1
07/13/2023
Permit issued — Sidewalk Shed
M00903457-I1-SH
07/13/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/30/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/18/2023
Permit issued — Plumbing
M00503234-I1-PL
11/02/2022
Violation issued (HPD, closed)
I
10/14/2022
Filed — Alteration CO
M08020416-I1
10/14/2022
Special inspection requirement — Interior lighting power
10/14/2022
Special inspection requirement — Fire-Resistance Rated Construction
10/14/2022
Special inspection requirement — Air barrier - visual inspection
10/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/14/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/13/2021
Special inspection requirement — HVAC-R and service water heating equipment
DOYUN KIM
09/13/2021
Special inspection requirement — HVAC-R and service water heating system controls
DOYUN KIM
09/13/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
DOYUN KIM
09/10/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/09/2021
Filed — Alteration
FILING TO INSTALL NEW FIXTURES AND REPLACE OLD FIXTURES IN EXISTING
M00503234-P1
07/02/2021
Permit issued — Plumbing
M00503234-I1-PL
05/12/2021
Permit issued — General Construction
M00503226-I1-GC
04/14/2021
Filed — Alteration
FILING TO INSTALL NEW FIXTURES AND REPLACE OLD FIXTURES IN EXISTING
M00503234-I1
04/14/2021
Filed — Alteration
FILING TO DO AN INTERIOR RENOVATION AND TO CREATE A BULKHEAD LEADING TO THE ROOF. NO CHANGE IN USE, EGRESS, AND/OR OCCUPANCY
M00503226-I1
04/13/2021
Special inspection requirement — Fenestration air leakage
DOYUN KIM
04/13/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
DOYUN KIM
04/13/2021
Special inspection requirement — Lighting controls
DOYUN KIM
04/13/2021
Special inspection requirement — Lighting in dwelling units
DOYUN KIM
04/13/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
04/13/2021
Special inspection requirement — Masonry
DOYUN KIM
04/13/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
DOYUN KIM
04/13/2021
Special inspection requirement — Final
DOYUN KIM
04/13/2021
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
04/13/2021
Special inspection requirement — Fire-Resistance Rated Construction
DOYUN KIM
04/13/2021
Special inspection requirement — Exterior lighting power
DOYUN KIM
04/13/2021
Special inspection requirement — Interior lighting power
DOYUN KIM
04/13/2021
Special inspection requirement — Fenestration areas
DOYUN KIM
06/11/2019
Violation issued (HPD, open)
B
06/11/2019
Violation issued (HPD, open)
B
06/04/2019
Violation issued (HPD, open)
A
10/09/2018
Violation issued (HPD, closed)
I
11/06/2017
Violation issued (HPD, closed)
I
10/01/2015
Violation issued (HPD, closed)
I
02/02/2015
Violation issued (HPD, closed)
I
12/31/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/03/2008
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/1999
Violation issued (HPD, closed)
B
04/25/1999
Violation issued (HPD, closed)
C
12/01/1992
Violation issued (HPD, open)
C
Latest 60 of 82 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BILLY ENTERPRISES INC903/22/2026
SKYLINE SCAFFOLDING GROUP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DOYUN KIM; RA506/04/2024
MJE PROFESSIONAL SERVICES207/14/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KC EXPEDITING1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BILLY ENTERPRISES INCGeneral Contractor603/21/2026
A P PLUMBING&HEATING INCPlumbing207/08/2026
CEA, BRIANElectrical103/21/2026
FAIELLA, STEFENElectrical103/21/2026
KING, MYRONElectrical103/21/2026
EMPIRE GROUP NYC LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOYUN KIM; RA7415104/14/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offBILLY ENTERPRISES INC07/14/2023
DOB NOWSidewalk ShedSigned-offBILLY ENTERPRISES INC07/13/2023
DOB NOWPlumbingPermit IssuedA P PLUMBING&HEATING INC05/18/2023
DOB NOWPlumbingPermit IssuedA P PLUMBING&HEATING INC07/02/2021
DOB NOWGeneral ConstructionPermit IssuedEMPIRE GROUP NYC LLC05/12/2021
BISOTISSUEDM CONSTRUCTION GROUP INC02/26/2016
BISPLISSUEDBELL FUEL OIL, LLC08/07/2013
BISOTISSUEDAPPROVED OIL CO BROOKLYN08/07/2013
BISFPISSUEDIDEAL FIRE SYSTEMS INC06/16/2005
BISPLISSUEDKORDUN CONSTRUCTION CORP07/12/2000
BISFPISSUEDIDEAL FIRE CONTROL,INC.06/02/2000
BISPLISSUEDKORDUN CONSTRUCTION CORP03/29/2000
BISOTISSUEDKORDUN CONSTRUCTION CORP03/29/2000
BISBLISSUEDEMPIRE STATE FUEL CORP11/21/1995
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/13/2023Fail-Final General Construction Non-Directive 14FailView ↗
05/30/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/10/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
12/16/2024HVAC-R and service water piping design and insulation—energy_progress
06/04/2024Tenant Protection Plan Compliance—special
10/14/2022Interior lighting power—energy_progress
10/14/2022Fire-Resistance Rated Construction—progress
10/14/2022Air barrier - visual inspection—energy_progress
10/14/2022Fire-Resistant Penetrations and Joints—special
10/14/2022Structural Stability – Alterations of existing buildings—special
09/13/2021HVAC-R and service water heating equipmentDOYUN KIMenergy_progress
09/13/2021HVAC-R and service water heating system controlsDOYUN KIMenergy_progress
09/13/2021HVAC-R and service water piping design and insulationDOYUN KIMenergy_progress
04/13/2021Fenestration air leakageDOYUN KIMenergy_progress
04/13/2021Fenestration and door U-factor and product ratingsDOYUN KIMenergy_progress
04/13/2021Lighting controlsDOYUN KIMenergy_progress
04/13/2021Lighting in dwelling unitsDOYUN KIMenergy_progress
04/13/2021Fire-Resistant Penetrations and JointsDOYUN KIMspecial
04/13/2021MasonryDOYUN KIMspecial
04/13/2021Structural Stability – Alterations of existing buildingsDOYUN KIMspecial
04/13/2021FinalDOYUN KIMprogress
04/13/2021Energy Code Compliance InspectionsDOYUN KIMprogress
04/13/2021Fire-Resistance Rated ConstructionDOYUN KIMprogress
04/13/2021Exterior lighting powerDOYUN KIMenergy_progress
04/13/2021Interior lighting powerDOYUN KIMenergy_progress
04/13/2021Fenestration areasDOYUN KIMenergy_progress
▾Documents — 63 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/03/2026M00503226-I1Request digital key ↗
09/03/2026M00503234-P1Request digital key ↗
09/03/2026M00503234-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION4
03/09/2016122678245Open ↗
08/14/2013121740045Open ↗
08/14/2013121740045Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
02/11/2016122678245Open ↗
09/05/2013121740045Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026M08020416-I1Open ↗
▸Seals & Professional Certifications23
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
03/09/2016122678245Open ↗
03/04/2016122678245Open ↗
03/04/2016122678245Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/03/2026M00503226-I1Open ↗
08/29/2026M00903457-I1Open ↗
08/29/2026M00903459-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026M00503234-I1Open ↗
08/30/2026M00503226-I1Open ↗
08/30/2026M00503226-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
02/11/2016122678245Open ↗
08/14/2013121740045Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/14/2013121740045Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/11/2016122678245Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/30/2026M00503226-I1Open ↗
▸Trade Schedules & Equipment5
▸BISSELF-CERT PLUMBING NOTICE2
01/02/2014121740045Open ↗
10/04/2013121740045Open ↗
▸BISSCHEDULE B - PLUMBING1
08/14/2013121740045Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
08/14/2013121740045Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
10/04/2013121740045Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026M08020416-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/03/2026M00503226-I1Open ↗
08/13/2026M00503234-I1Open ↗
08/13/2026M00503234-P1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/14/2013121740045Open ↗
▸BISTR8: Energy Code Progress Inspections1
08/14/2013121740045Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/08/2021122678245Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
03/04/2016122678245Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/09/2021122678245Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
03/09/2021122678245Open ↗
02/11/2016122678245Open ↗
08/14/2013121740045Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
02/11/2016122678245Open ↗
08/14/2013121740045Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification1
08/13/2026M08020416-I1Open ↗
▸DOB NOWWaiver Document1
08/13/2026M00503234-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026M08020416-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026M08020416-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026M08020416-I1Open ↗