Public elementary, junior or senior high
167 UNION AVENUE
STATEN ISLAND · Mariner's Harbor-Arlington-Graniteville · BIN 5027609
💬 Discuss this project
1927Year Built
4Stories
W1Building Class
R3AZoning
97,700 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 118,850 sf lot · 0.82 FAR built
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC106/26/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOSEPH MARONEElectrical103/21/2026
SUNRUN INSTALLATION SVCGeneral Contractor107/04/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272106/26/2026
Building Lifecycle
All (10)Filed (1)Permit Issued (1)Signed Off (1)Violation (2)Special Inspection (5)
09/14/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S01421539-I1
07/02/2026
Permit issued — Solar
S01421539-I1-SL
06/26/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S01421539-I1
06/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
06/26/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
06/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
06/24/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
06/24/2026
Special inspection requirement — Final
Walid Abdulla
12/12/2001
Violation issued (ECB, closed)
HPD
07/25/2001
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC07/02/2026
2 projects · most recent 06/26/2026
General Wiring
FiledStatusContractorScope
06/26/2026CompleteSUNRUN SOLAR ELECTL CORP—
06/26/2022CompleteELECTRIC FIXX INCGeneral Wiring
1 project · most recent 06/26/2026
FiledStatusContractorScope
06/26/2026Signed-offSUNRUN INSTALLATION SVC12 panels, 5.4 kw, 252.27 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/26/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
06/26/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
06/24/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
06/24/2026Energy Code Compliance InspectionsWalid Abdullaprogress
06/24/2026FinalWalid Abdullaprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026S01421539-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026S01421539-I1Open ↗
08/28/2026S01421539-I1Open ↗
08/28/2026S01421539-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026S01421539-I1Open ↗
08/28/2026S01421539-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026S01421539-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026S01421539-I1Open ↗