← Back
Two family frame
1670 50 STREET
BROOKLYN · BIN 3129398
💬 Discuss this project
1930Year Built
3Stories
B2Building Class
R5Zoning
4,152 sfGross Floor Area
2Units
Rent Stabilized20 Open Violations ▸FDNY Report ↗
Two family frame · 3,756 sf lot · 1.11 FAR built · Flood zone X
Locations of Work
Structural
Permit Issued — active, not yet Signed-off
Floor 3Under Construction4p · 1 filing · 20 docs
Floor 2Under Construction4p · 1 filing · 20 docs
Floor 1Under Construction4p · 1 filing · 20 docs
CellarUnder Construction4p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GARFINKEL ARCHITECT, PLLC204/16/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UPPERLEVEL CONSTRUCTIONGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CITY-WIDE TESTING INC416204/16/2026
Building Lifecycle
All (54)Filed (2)Permit Issued (1)Violation (21)Special Inspection (30)
05/01/2026
Violation issued (HPD, open)
A
04/28/2026
Special inspection requirement — Insulation placement and R values
ELIAS RASABI
04/28/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
ELIAS RASABI
04/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
04/28/2026
Special inspection requirement — Subgrade Inspections
ELIAS RASABI
04/28/2026
Special inspection requirement — Structural Steel - Details
ELIAS RASABI
04/28/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ELIAS RASABI
04/28/2026
Special inspection requirement — Concrete - Cast-In-Place
ELIAS RASABI
04/28/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Bin Li
04/28/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
ELIAS RASABI
04/28/2026
Special inspection requirement — Footing and Foundation
ELIAS RASABI
04/28/2026
Special inspection requirement — Final
ELIAS RASABI
04/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
ELIAS RASABI
04/28/2026
Special inspection requirement — Structural Wood Frame
ELIAS RASABI
04/28/2026
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
04/28/2026
Special inspection requirement — Protection of exposed foundation insulation
ELIAS RASABI
04/16/2026
Filed — Alteration
Enlarge building at all floors to accommodate new elevator.
B00927575-P1
04/15/2026
Special inspection requirement — Structural Wood Frame
ELIAS RASABI
04/15/2026
Special inspection requirement — Concrete - Cast-In-Place
ELIAS RASABI
04/15/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
ELIAS RASABI
04/15/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
ELIAS RASABI
04/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
04/15/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ELIAS RASABI
04/15/2026
Special inspection requirement — Structural Steel - Details
ELIAS RASABI
04/15/2026
Special inspection requirement — Subgrade Inspections
ELIAS RASABI
04/15/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Bin Li
04/15/2026
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
04/15/2026
Special inspection requirement — Final
ELIAS RASABI
04/15/2026
Special inspection requirement — Fire-Resistance Rated Construction
ELIAS RASABI
04/15/2026
Special inspection requirement — Footing and Foundation
ELIAS RASABI
04/15/2026
Special inspection requirement — Protection of exposed foundation insulation
ELIAS RASABI
04/15/2026
Special inspection requirement — Insulation placement and R values
ELIAS RASABI
11/18/2025
Violation issued (HPD, open)
I
11/10/2025
Permit issued — Structural
B00927575-I1-GC-CX
06/06/2025
Violation issued (HPD, open)
A
11/25/2024
Violation issued (HPD, open)
I
04/08/2024
Violation issued (HPD, open)
A
12/22/2023
Filed — Alteration
Enlarge building at all floors to accommodate new elevator.
B00927575-I1
11/17/2023
Violation issued (HPD, open)
I
03/20/2023
Violation issued (HPD, open)
A
11/04/2022
Violation issued (HPD, open)
I
02/22/2022
Violation issued (HPD, open)
I
02/22/2022
Violation issued (HPD, open)
A
04/06/2021
Violation issued (HPD, open)
A
04/06/2021
Violation issued (HPD, open)
I
10/29/2019
Violation issued (HPD, open)
I
10/15/2018
Violation issued (HPD, open)
I
11/16/2017
Violation issued (HPD, open)
I
11/02/2016
Violation issued (HPD, open)
I
10/06/2015
Violation issued (HPD, open)
I
02/06/2015
Violation issued (HPD, open)
I
04/11/1997
Violation issued (HPD, closed)
A
05/28/1986
Violation issued (HPD, open)
B
05/28/1986
Violation issued (HPD, open)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedUPPERLEVEL CONSTRUCTION11/10/2025
BIS—ISSUEDPRESCO INDUSTRY INC06/28/2005
1 project · most recent 10/22/2025
General Wiring
FiledStatusContractorScope
10/22/2025Permit IssuedSELECT ELECTRICAL GROUP IGeneral Wiring
1 project · most recent 04/16/2026
Steel Wood
FiledStatusContractorScope
04/16/2026Permit IssuedUPPERLEVEL CONSTRUCTIONSteel, Wood
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
04/28/2026Insulation placement and R valuesELIAS RASABIenergy_progress
04/28/2026Excavations - Sheeting, Shoring, and BracingELIAS RASABIspecial
04/28/2026Fire-Resistant Penetrations and JointsELIAS RASABIspecial
04/28/2026Subgrade InspectionsELIAS RASABIspecial
04/28/2026Structural Steel - DetailsELIAS RASABIspecial
04/28/2026Structural Stability – Alterations of existing buildingsELIAS RASABIspecial
04/28/2026Concrete - Cast-In-PlaceELIAS RASABIspecial
04/28/2026Subsurface Investigations (Borings/Test Pits)Bin Lispecial
04/28/2026Exterior Insulation and Finish Systems (EIFS)ELIAS RASABIspecial
04/28/2026Footing and FoundationELIAS RASABIprogress
04/28/2026FinalELIAS RASABIprogress
04/28/2026Fire-Resistance Rated ConstructionELIAS RASABIprogress
04/28/2026Structural Wood FrameELIAS RASABIprogress
04/28/2026Energy Code Compliance InspectionsELIAS RASABIprogress
04/28/2026Protection of exposed foundation insulationELIAS RASABIenergy_progress
04/15/2026Structural Wood FrameELIAS RASABIprogress
04/15/2026Concrete - Cast-In-PlaceELIAS RASABIspecial
04/15/2026Excavations - Sheeting, Shoring, and BracingELIAS RASABIspecial
04/15/2026Exterior Insulation and Finish Systems (EIFS)ELIAS RASABIspecial
04/15/2026Fire-Resistant Penetrations and JointsELIAS RASABIspecial
04/15/2026Structural Stability – Alterations of existing buildingsELIAS RASABIspecial
04/15/2026Structural Steel - DetailsELIAS RASABIspecial
04/15/2026Subgrade InspectionsELIAS RASABIspecial
04/15/2026Subsurface Investigations (Borings/Test Pits)Bin Lispecial
04/15/2026Energy Code Compliance InspectionsELIAS RASABIprogress
Latest 25 of 30.
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/17/2026B00927575-P1Request digital key ↗
08/17/2026B00927575-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZoning Exhibit form (1-5)2
08/17/2026B00927575-P1Open ↗
08/13/2026B00927575-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/17/2026B00927575-P1Open ↗
08/13/2026B00927575-I1Open ↗
▸Seals & Professional Certifications12
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B00927575-P1Open ↗
09/01/2026B00927575-P1Open ↗
09/01/2026B00927575-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B00927575-P1Open ↗
09/01/2026B00927575-P1Open ↗
08/26/2026B00927575-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/17/2026B00927575-P1Open ↗
08/13/2026B00927575-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026B00927575-P1Open ↗
08/13/2026B00927575-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/17/2026B00927575-P1Open ↗
08/13/2026B00927575-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026B00927575-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00927575-I1Open ↗
▸Other Documents7
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/17/2026B00927575-P1Open ↗
08/13/2026B00927575-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/17/2026B00927575-P1Open ↗
08/13/2026B00927575-I1Open ↗
▸DOB NOWPlot Diagram2
08/17/2026B00927575-P1Open ↗
08/13/2026B00927575-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00927575-I1Open ↗