← Back
BuildNYC
Office with commercial, 1-6 stories
1670 EAST 17TH STREET
BROOKLYN · Madison · BIN 3253746
💬 Discuss this project
1925Year Built
3Stories
O5Building Class
R7AZoning
—Gross Floor Area
6Units
0 Active Violations 4 likely answered 3 old, status unconfirmed ▸FDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: Interborough Development and Consultatio N Center · 2.79 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofInterborough DevelopmentalUnder Construction2p · 2 filings · 20 docs
Floor 3Replacement of gas fired boilerUnder Construction20p · 1 filing · 20 docs
Floor 2Replacement of gas fired boilerUnder Construction15p · 1 filing · 20 docs
Floor 1Interborough DevelopmentalUnder Construction7p · 1 filing · 11 docs
CellarInterborough DevelopmentalUnder Construction1p · 2 filings · 20 docs
BasementReplacement of gas fired boilerUnder Construction1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Interborough Developmental Cons1109/01/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Buve Group308/18/2026
A&B World Consulting505/15/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Revit GroupGeneral Contractor207/29/2026
A. Heating and Plumbing WorksPlumbing107/23/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A&B World Consulting5704808/18/2026
Building Lifecycle
All (86)Filed (8)Permit Issued (3)Violation (24)Objection (39)Special Inspection (12)
08/27/2026
Objection raised — Other
08/18/2026
Filed — Alteration
AN APPLICATION IS FILED FOR THE HVAC FIT-OUT OF AN EXISTING COMMERCIAL SPACE ON THE SECOND AND THIRD FLOORS, PER THE PLANS FILED HEREWITH, NO CHANGE TO USE, EGRESS, OCCUPANCY, OR BULK PROPOSED UNDER THIS APPLICATION.
B01322011-P1
08/14/2026
Special inspection requirement — Energy Code Compliance Inspections
Alexander Bomstein
08/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Bomstein
08/14/2026
Special inspection requirement — Interior lighting power
Alexander Bomstein
08/14/2026
Special inspection requirement — Lighting controls
Alexander Bomstein
08/14/2026
Special inspection requirement — Final
Alexander Bomstein
07/28/2026
Permit issued — General Construction
B01353378-I1-GC
07/22/2026
Permit issued — Plumbing
B01322011-S2-PL
07/15/2026
Objection resolved — Addressed
07/15/2026
Objection resolved — Addressed
06/09/2026
Objection resolved — Addressed
06/09/2026
Objection resolved — Addressed
06/09/2026
Objection resolved — Addressed
06/09/2026
Objection resolved — Addressed
06/09/2026
Objection resolved — Addressed
06/09/2026
Objection resolved — Addressed
06/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Bomstein
06/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Bomstein
06/05/2026
Objection raised — Other
06/05/2026
Objection raised — Other
06/05/2026
Objection raised — Other
06/05/2026
Objection raised — Other
06/05/2026
Objection raised — Other
06/05/2026
Objection raised — Other
06/05/2026
Objection raised — Other
06/05/2026
Objection raised — Other
06/04/2026
Objection resolved — Addressed
06/03/2026
Objection raised — Other
05/29/2026
Objection raised — Cost
05/29/2026
Objection resolved — Addressed
05/29/2026
Objection raised — Other
05/29/2026
Objection resolved — Addressed
05/29/2026
Objection raised — Cost
05/29/2026
Objection resolved — Addressed
05/29/2026
Objection raised — Other
05/29/2026
Objection resolved — Addressed
05/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Bomstein
05/15/2026
Filed — Alteration
APPLICATION IS FILED FOR THE INTERIOR FIT-OUT OF AN EXISTING COMMERCIAL SPACE ON THE GROUND FLOOR PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OCCUPANCY, OR BULK PROPOSED UNDER THIS APPLICATION.
B01353378-S1
05/15/2026
Filed — Alteration
AN APPLICATION IS FILED FOR THE HVAC FIT-OUT OF AN EXISTING COMMERCIAL SPACE ON THE SECOND AND THIRD FLOORS, PER THE PLANS FILED HEREWITH, NO CHANGE TO USE, EGRESS, OCCUPANCY, OR BULK PROPOSED UNDER THIS APPLICATION.
B01322011-S3
05/15/2026
Filed — Alteration
AN APPLICATION IS FILED FOR THE HVAC FIT-OUT OF AN EXISTING COMMERCIAL SPACE ON THE SECOND AND THIRD FLOORS, PER THE PLANS FILED HEREWITH, NO CHANGE TO USE, EGRESS, OCCUPANCY, OR BULK PROPOSED UNDER THIS APPLICATION.
B01322011-S2
05/15/2026
Filed — Alteration
APPLICATION IS FILED FOR THE INTERIOR FIT-OUT OF AN EXISTING COMMERCIAL SPACE ON THE GROUND FLOOR PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OCCUPANCY, OR BULK PROPOSED UNDER THIS APPLICATION.
B01353378-S2
05/15/2026
Filed — Alteration
AN APPLICATION IS FILED FOR THE HVAC FIT-OUT OF AN EXISTING COMMERCIAL SPACE ON THE SECOND AND THIRD FLOORS, PER THE PLANS FILED HEREWITH, NO CHANGE TO USE, EGRESS, OCCUPANCY, OR BULK PROPOSED UNDER THIS APPLICATION.
B01322011-S1
04/30/2026
Special inspection requirement — Mechanical Systems
Alexander Bomstein
04/30/2026
Special inspection requirement — Final
04/30/2026
Special inspection requirement — Mechanical Systems
Alexander Bomstein
04/30/2026
Special inspection requirement — Final
04/05/2026
Objection resolved — Resolved
04/05/2026
Objection resolved — Resolved
04/05/2026
Objection resolved — Resolved
03/27/2026
Objection raised — Fire_Protection
03/27/2026
Objection raised — Cost
03/27/2026
Objection raised — Admin
03/10/2026
Filed — Alteration
APPLICATION IS FILED FOR THE INTERIOR FIT-OUT OF AN EXISTING COMMERCIAL SPACE ON THE GROUND FLOOR PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OCCUPANCY, OR BULK PROPOSED UNDER THIS APPLICATION.
B01353378-I1
12/29/2025
Permit issued — General Construction
B01322011-I1-GC
12/22/2025
Objection resolved — Addressed
12/22/2025
Objection resolved — Addressed
12/22/2025
Objection resolved — Addressed
12/16/2025
Objection raised — Other
12/16/2025
Objection raised — Other
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedRevit Group07/28/2026
DOB NOWPlumbingPermit IssuedA. Heating and Plumbing Works07/22/2026
DOB NOWGeneral ConstructionPermit IssuedRevit Group12/29/2025
BISPLISSUEDBridgewater Plumbing & Heating01/21/2003
BISOTISSUEDHaboneh Construction01/17/2003
BISOTISSUEDSolomon Construction07/27/1995
2 projects · most recent 08/18/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/18/2026Permit IssuedRevit GroupHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PUHY-EP288TSNU-A1 288,000 BTU · Vrf Outdoor ×1
05/15/2026Permit IssuedRevit GroupHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PLFY-P08NFMU-ER1.TH 8,000 BTU · Vrf Indoor ×12
2 projects · most recent 08/18/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/18/2026Permit IssuedD.H. Eagle PlumbingGas, Water/Sanitary
05/15/2026——Water/Sanitary
3 projects · most recent 07/21/2026
General Wiring
FiledStatusContractorScope
07/21/2026Permit IssuedCharles Leo ElectricalGeneral Wiring
02/05/2026Permit IssuedDenali Electric—
12/20/2025Permit IssuedElectrician NYCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
08/14/2026Energy Code Compliance InspectionsAlexander Bomsteinprogress
08/14/2026Fire-Resistant Penetrations and JointsAlexander Bomsteinspecial
08/14/2026Interior lighting powerAlexander Bomsteinenergy_progress
08/14/2026Lighting controlsAlexander Bomsteinenergy_progress
08/14/2026FinalAlexander Bomsteinprogress
06/09/2026Fire-Resistant Penetrations and JointsAlexander Bomsteinspecial
06/09/2026Fire-Resistant Penetrations and JointsAlexander Bomsteinspecial
05/29/2026Fire-Resistant Penetrations and JointsAlexander Bomsteinspecial
04/30/2026Mechanical SystemsAlexander Bomsteinspecial
04/30/2026Final—progress
04/30/2026Mechanical SystemsAlexander Bomsteinspecial
04/30/2026Final—progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Interborough DevelopmentalMedical / HealthcareFloor 1
Project B01353378 Alteration · Permit Entire · 03/10/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/19/2026B01322011-P1Request digital key ↗
08/17/2026B01322011-P1Request digital key ↗
08/17/2026B01353378-S2Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/17/2026B01322011-S2Open ↗
08/17/2026B01322011-P1Open ↗
08/17/2026B01322011-S3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B01353378-S1Open ↗
08/28/2026B01322011-S1Open ↗
08/28/2026B01322011-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026B01322011-P1Open ↗
08/25/2026B01322011-P1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/17/2026B01322011-P1Open ↗
08/17/2026B01353378-S2Open ↗
08/15/2026B01353378-S1Open ↗
Showing 3 of 8 on file for this type