← Back
Over six families without stores
1670 TOWNSEND AVENUE
BRONX · BIN 2008160
💬 Discuss this project
1920Year Built
2Stories
C1Building Class
R8Zoning
11,192 sfGross Floor Area
25Units
Rent Stabilized2 Open Violations ▸
Over six families without stores · Owner of record: 1670 TOWNSEND 22 LLC · 2,500 sf lot · 4.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof2p · 1 filing · 11 docs
Penthouse35p · 2 filings · 20 docs
Floor 435p · 2 filings · 20 docs
Floor 334p · 2 filings · 20 docs
Floor 236p · 2 filings · 20 docs
Floor 135p · 2 filings · 20 docs
Cellar37p · 2 filings · 20 docs
Basement1p · 1 filing · 11 docs
1 job · most recent 05/22/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/22/2024Signed-offBUILDERS GROUP USA INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RX12BXVJU 12,000 BTU · Split System ×64
RX18AXVJU 18,000 BTU · Split System ×12
3MXS24WMVJU9 24,000 BTU · Split System ×3
Ventilation
Whisper Warm FV-11VH1 50 CFM · Exhaust Fan ×75
Zephyr Z5H 50 CFM · Exhaust Fan ×75
Greenheck G-071-VG 850 CFM · Exhaust Fan ×9
G-069-VG 200 CFM · Exhaust Fan ×5
G-1/80 400 CFM · Exhaust Fan ×3
1 job · most recent 05/22/2024
Sprinkler System
FiledStatusContractorScope
05/22/2024Signed-offPRIME PIPING & HEATING INSprinkler System
1 job · most recent 05/22/2024
Storm Water/Sanitary
FiledStatusContractorScope
05/22/2024Signed-offYG SERVICES INCStorm, Water/Sanitary
3 jobs · most recent 12/28/2022
General Wiring
FiledStatusContractorScope
12/28/2022CompleteHIGH QUALITY ELECTRIC OF—
10/26/2022CompletePLATINUM PWR ELECTL CONT—
10/07/2022CompletePLATINUM PWR ELECTL CONTGeneral Wiring
1 job · most recent 05/22/2024
FiledStatusContractorScope
05/22/2024Signed-offA M B MECHANICAL INC1 scope_items
1 job · most recent 05/22/2024
Fence
FiledStatusContractorScope
05/22/2024Signed-offA M B MECHANICAL INCFence
Building Lifecycle
All (146)Filed (14)Permit Issued (13)Signed Off (7)Violation (9)Inspection (15)Objection (58)Special Inspection (30)
05/23/2026
Violation issued (HPD, closed)
C
05/23/2026
Violation issued (HPD, open)
B
05/08/2026
Violation issued (HPD, closed)
B
04/30/2026
Violation issued (HPD, closed)
B
04/30/2026
Violation issued (HPD, closed)
C
09/27/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
CONSTRUCTION OF THE CAST-IN-PLACE REINFORCED CONCRETE RETAINING WALL
X00527768-S6
05/22/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
CONSTRUCTION OF THE CAST-IN-PLACE REINFORCED CONCRETE RETAINING WALL
X00527768-S6
05/16/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
CONSTRUCTION OF THE CAST-IN-PLACE REINFORCED CONCRETE RETAINING WALL
X00527768-S2
05/15/2024
Special inspection requirement — Footing and Foundation
FAHAD FATEH
05/15/2024
Special inspection requirement — Final
FAHAD FATEH
11/27/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/16/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/13/2023
Signed off — Alteration
STRUCTURAL, FO, & EARTH WORK SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATON #X00527768-I1
X00565690-I1
11/07/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
CONSTRUCTION OF THE CAST-IN-PLACE REINFORCED CONCRETE RETAINING WALL
X00527768-P6
11/02/2023
Signed off — ALT-CO - New Building with Existing Elements to Remain
CONSTRUCTION OF THE CAST-IN-PLACE REINFORCED CONCRETE RETAINING WALL
X00527768-S1
11/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/02/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
11/02/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
11/02/2023
Special inspection requirement — Seismic Isolation Systems
FAHAD FATEH
11/02/2023
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
11/01/2023
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
10/31/2023
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
10/27/2023
Inspection — Fail-Final SP - Up to 9 Requested Floors
Fail
View inspection ↗
10/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
10/26/2023
Special inspection requirement — Shutoff dampers
FAHAD FATEH
10/26/2023
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
10/26/2023
Special inspection requirement — Mechanical Systems
FAHAD FATEH
10/26/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
10/26/2023
Special inspection requirement — Final
FAHAD FATEH
10/26/2023
Special inspection requirement — Heating Systems
FAHAD FATEH
10/26/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
10/26/2023
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
10/26/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
10/26/2023
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
10/25/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
CONSTRUCTION OF THE CAST-IN-PLACE REINFORCED CONCRETE RETAINING WALL
X00527768-P5
10/18/2023
Special inspection requirement — Shutoff dampers
FAHAD FATEH
10/18/2023
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
10/18/2023
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
10/18/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
10/18/2023
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
10/18/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
10/18/2023
Special inspection requirement — Heating Systems
FAHAD FATEH
10/18/2023
Special inspection requirement — Mechanical Systems
FAHAD FATEH
10/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
10/18/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
10/18/2023
Special inspection requirement — Final
FAHAD FATEH
10/02/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/22/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/13/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/07/2023
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
09/04/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/31/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
CONSTRUCTION OF THE CAST-IN-PLACE REINFORCED CONCRETE RETAINING WALL
X00527768-P3
08/30/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/28/2023
Signed off — ALT-CO - New Building with Existing Elements to Remain
CONSTRUCTION OF THE CAST-IN-PLACE REINFORCED CONCRETE RETAINING WALL
X00527768-S4
08/09/2023
Objection resolved — Addressed
08/09/2023
Objection resolved — Addressed
07/27/2023
Objection raised — Fire_Protection
07/27/2023
Objection raised — Accessibility
07/25/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
CONSTRUCTION OF THE CAST-IN-PLACE REINFORCED CONCRETE RETAINING WALL
X00527768-P2
06/19/2023
Signed off — Alteration
X00803779-I1
Latest 60 of 146 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JB CONSTRUCTION DESIGN5207/08/2026
1670 TOWNSEND 22 LLC203/22/2026
BUILDERS GROUP USA303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/17/2022$890K—Private party → 1670 TOWNSEND 22 LLC$80/sf building
02/03/2017$565K—Private party → Private party$50/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TITAN ENGINEERS PC105/22/2024
CHOSEN MEP, CORP.511/07/2023
ADB ASSOCIATES407/25/2023
KCE CONSULTING ENGINEERING PLLC303/10/2023
MOHAMMAD AHEAD, PE112/23/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC2603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILDERS GROUP USA INCGeneral Contractor1107/08/2026
SKYWARD DEVELOPERS INCGeneral Contractor707/08/2026
YELLOW HAT CONSTRUCTION IGeneral Contractor407/08/2026
MPI PLUMBING CORPPlumbing107/08/2026
DYNAMIX SCAFFOLD GROUP LLGeneral Contractor107/08/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
PLATINUM PWR ELECTL CONTElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161011/07/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBUILDERS GROUP USA04/04/2023
DOB NOWPlumbingSigned-offA M B MECHANICAL INC03/27/2023
DOB NOWConstruction FenceSigned-offBUILDERS GROUP USA02/22/2023
DOB NOWEarth WorkSigned-offBUILDERS GROUP USA02/14/2023
DOB NOWGeneral ConstructionPermit IssuedBUILDERS GROUP USA02/07/2023
DOB NOWMechanical SystemsSigned-offBUILDERS GROUP USA02/02/2023
DOB NOWSidewalk ShedSigned-offDYNAMIX SCAFFOLD GROUP LL12/26/2022
DOB NOWSprinklersSigned-offYG SERVICES INC12/21/2022
DOB NOWGeneral ConstructionSigned-offYELLOW HAT CONSTRUCTION I12/08/2022
DOB NOWFoundationSigned-offSKYWARD DEVELOPERS INC11/23/2022
DOB NOWConstruction FenceSigned-offYELLOW HAT CONSTRUCTION I11/04/2022
DOB NOWConstruction FenceSigned-offSKYWARD DEVELOPERS INC06/30/2022
DOB NOWEarth WorkSigned-offSKYWARD DEVELOPERS INC05/20/2022
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
11/27/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/16/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/01/2023Pass-Final SP - Up to 9 Requested FloorsPassView ↗
10/31/2023Pass-Final SP - Up to 9 Requested FloorsPassView ↗
10/27/2023Fail-Final SP - Up to 9 Requested FloorsFailView ↗
10/02/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/22/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/13/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/07/2023Pass-Final SP - Up to 9 Requested FloorsPassView ↗
09/04/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/22/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/05/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/13/2023Pass-Final PL - UndergroundPassView ↗
01/09/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 113
DateRequirementInspectorRole
05/15/2024Footing and FoundationFAHAD FATEHprogress
05/15/2024FinalFAHAD FATEHprogress
11/02/2023Seismic Isolation SystemsFAHAD FATEHspecial
11/02/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
11/02/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
11/02/2023Sprinkler SystemsFAHAD FATEHspecial
11/02/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
10/26/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
10/26/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
10/26/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
10/26/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
10/26/2023Shutoff dampersFAHAD FATEHenergy_progress
10/26/2023Electrical motors and elevatorsFAHAD FATEHenergy_progress
10/26/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
10/26/2023FinalFAHAD FATEHprogress
10/26/2023Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
10/26/2023Heating SystemsFAHAD FATEHspecial
10/26/2023Mechanical SystemsFAHAD FATEHspecial
10/18/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
10/18/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
10/18/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
10/18/2023FinalFAHAD FATEHprogress
10/18/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
10/18/2023Structural Stability – Alterations of existing buildings—special
10/18/2023Mechanical SystemsFAHAD FATEHspecial
Latest 25 of 113.
▾Documents — 110 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/24/2026X00732720-I1Request digital key ↗
08/23/2026X00803779-I1Request digital key ↗
08/23/2026X00565690-P1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits4
▸DOB NOWHPD - Permit Notice2
08/13/2026X00732720-I1Open ↗
08/13/2026X00527768-I1Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
03/14/2022240315921Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
09/20/2022240315921Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026X00527768-P1Open ↗
08/13/2026X00527768-P2Open ↗
08/13/2026X00527768-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026X00527768-P2Open ↗
08/13/2026X00527768-P1Open ↗
08/13/2026X00527768-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00527768-I1Open ↗
▸Seals & Professional Certifications41
▸DOB NOWProgress Inspector Seal & Signature15
09/28/2026X00565690-P1Open ↗
09/19/2026X00565690-I1Open ↗
09/02/2026X00527768-P6Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/24/2026X00732720-I1Open ↗
08/23/2026X00803779-I1Open ↗
08/21/2026X00527768-S6Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/28/2026X00565690-P1Open ↗
09/19/2026X00565690-I1Open ↗
09/19/2026X00565690-I1Open ↗
Showing 3 of 11 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
03/08/2022240315921Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026X00527768-P2Open ↗
08/13/2026X00527768-P1Open ↗
08/13/2026X00527768-I1Open ↗
▸Safety & Tenant Protection6
▸BISBPP: STREET TREES SITE PLAN1
09/20/2022240315921Open ↗
▸BISSTREET TREE CHECKLIST1
09/20/2022240315921Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
09/20/2022240315921Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00527768-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00527768-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00527768-I1Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/21/2026X00527768-S6Open ↗
08/21/2026X00527768-P6Open ↗
08/21/2026X00527768-P5Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/15/2026X00527768-S2Open ↗
08/14/2026X00527768-S1Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026X00527768-S1Open ↗
08/13/2026X00527768-S2Open ↗
08/13/2026X00527768-I1Open ↗
▸Cost, Insurance & Ownership3
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
11/22/2024240315921Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026X00527768-I1Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026X00527768-I1Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
03/08/2022240315921Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
09/20/2022240315921Open ↗
▸Other Documents16
▸BISBPP - SUPPORTING DOCUMENTATION5
11/20/2024240315921Open ↗
11/20/2024240315921Open ↗
11/20/2024240315921Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026X00527768-I1Open ↗
08/13/2026X00527768-P1Open ↗
08/13/2026X00527768-P2Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026X00527768-I1Open ↗
08/13/2026X00527768-P1Open ↗
08/13/2026X00527768-P2Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026X00565690-I1Open ↗
08/13/2026X00732720-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026X00565690-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00527768-I1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026X00527768-I1Open ↗