← Back
Walk-up apt, over six families with stores
1671 AMSTERDAM AVENUE
MANHATTAN · Hamilton Heights-Sugar Hill · BIN 1061258
💬 Discuss this project
1897Year Built
5Stories
C7Building Class
R6AZoning
13,811 sfGross Floor Area
13Units
Rent Stabilized29 Open Violations 28 unresolved · 1 paperwork only ▸
Walk-up apt, over six families with stores · Owner of record: AMSTERDAM GARVEY HOUSING DEVELOPMENT FUN D CORP. · 2,998 sf lot · 4.61 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof9p · 1 filing · 18 docs
Floor 510p · 1 filing · 18 docs
Floor 410p · 1 filing · 18 docs
Floor 310p · 1 filing · 18 docs
Floor 210p · 1 filing · 18 docs
Floor 19p · 1 filing · 18 docs
Cellar16p · 2 filings · 20 docs
Site & exterior3p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WEST HARLEM GROUP ASSISTANCE2507/08/2026
AMSTERDAM GARVEY HOUSING DEVELOPMENT FUN D CORP.203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
P. M. ARCHITECTURE, PC802/18/2026
JOEL PHAGOO P.E. PLLC111/20/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PM ARCHITECTURE PC1603/21/2026
A1 EXPEDITING SERVICE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J-J PLUMBING CORPPlumbing407/08/2026
AKM CONSTRUCTION NY CORPGeneral Contractor203/21/2026
NOTIAS CONSTRUCTION INCGeneral Contractor207/08/2026
MORRIS HELLERElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING4983709/19/2025
Building Lifecycle
All (114)Filed (9)Permit Issued (7)Signed Off (2)Violation (60)Inspection (4)Objection (2)Special Inspection (30)
07/30/2026
Violation issued (HPD, open)
A
07/30/2026
Violation issued (HPD, open)
A
07/30/2026
Violation issued (HPD, open)
B
04/21/2026
Violation issued (HPD, open)
A
04/21/2026
Violation issued (HPD, open)
C
04/21/2026
Violation issued (HPD, closed)
B
04/21/2026
Violation issued (HPD, closed)
B
04/17/2026
Signed off — Alteration
New boiler installation, subsequent filing to add 2nd boiler, no change to use egress or occupancy, in conjunction to main job alt2 job number M00828324-I1. Landmark approval under main filing. LPC DOCKET NUMBER 24-00447
M01047545-S1
03/24/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/16/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/13/2026
Permit issued — Boiler Equipment
M01047545-S2-BE
03/10/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/04/2026
Violation issued (HPD, open)
B
03/04/2026
Violation issued (HPD, open)
B
03/04/2026
Violation issued (HPD, closed)
C
02/18/2026
Filed — Alteration
New boiler installation, subsequent filing to add 2nd boiler, no change to use egress or occupancy, in conjunction to main job alt2 job number M00828324-I1. Landmark approval under main filing. LPC DOCKET NUMBER 24-00447
M01047545-P3
02/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/26/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/19/2025
Filed — Alteration
New boiler installation, subsequent filing to add 2nd boiler, no change to use egress or occupancy, in conjunction to main job alt2 job number M00828324-I1. Landmark approval under main filing. LPC DOCKET NUMBER 24-00447
M01047545-P2
09/18/2025
Filed — Alteration
New boiler installation, subsequent filing to add 2nd boiler, no change to use egress or occupancy, in conjunction to main job alt2 job number M00828324-I1. Landmark approval under main filing. LPC DOCKET NUMBER 24-00447
M01047545-S2
09/18/2025
Special inspection requirement — Heating Systems
ALEXIS SCHLESSINGERMAN
09/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
09/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
09/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
09/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
09/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
09/15/2025
Violation issued (HPD, open)
B
09/15/2025
Violation issued (HPD, closed)
A
09/15/2025
Violation issued (HPD, closed)
B
09/03/2025
Filed — Alteration
New boiler installation, subsequent filing to add 2nd boiler, no change to use egress or occupancy, in conjunction to main job alt2 job number M00828324-I1. Landmark approval under main filing. LPC DOCKET NUMBER 24-00447
M01047545-P1
08/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
08/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
08/27/2025
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
08/27/2025
Special inspection requirement — Heating Systems
ALEXIS SCHLESSINGERMAN
08/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
08/27/2025
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
08/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
08/26/2025
Special inspection requirement — Heating Systems
ALEXIS SCHLESSINGERMAN
08/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
08/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
08/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
08/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
08/14/2025
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01143838-I1
08/13/2025
Permit issued — General Construction
M00828324-I1-GC
07/16/2025
Permit issued — Plumbing
M01047545-S1-PL
07/02/2025
Violation issued (HPD, open)
C
07/02/2025
Violation issued (HPD, closed)
B
07/02/2025
Violation issued (HPD, closed)
C
07/02/2025
Violation issued (HPD, closed)
C
07/02/2025
Violation issued (HPD, open)
C
07/02/2025
Violation issued (HPD, closed)
B
07/02/2025
Violation issued (HPD, closed)
B
07/02/2025
Violation issued (HPD, closed)
A
03/19/2025
Violation issued (HPD, closed)
C
03/19/2025
Violation issued (HPD, closed)
C
03/19/2025
Violation issued (HPD, open)
C
03/19/2025
Violation issued (HPD, closed)
B
03/04/2025
Violation issued (HPD, open)
C
03/04/2025
Violation issued (HPD, closed)
C
03/04/2025
Violation issued (HPD, closed)
C
Latest 60 of 114 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offJ-J PLUMBING CORP03/13/2026
DOB NOWGeneral ConstructionPermit IssuedNOTIAS CONSTRUCTION INC08/13/2025
DOB NOWPlumbingSigned-offJ-J PLUMBING CORP07/16/2025
DOB NOWSidewalk ShedSigned-offAKM CONSTRUCTION NY11/21/2024
DOB NOWPlumbingSigned-offJ-J PLUMBING CORP08/14/2024
DOB NOWBoiler EquipmentSigned-offJ-J PLUMBING CORP08/14/2024
DOB NOWGeneral ConstructionPermit IssuedNOTIAS CONSTRUCTION INC06/26/2024
BISEQISSUEDJ & G GNRL CONTRACT INC11/19/2012
BISPLISSUEDAMC PLBG, HTG & CLNG, INC01/23/2006
BISOTISSUEDCENTRAL DEVELOPMENT CORP12/23/2005
BISEQISSUEDCENTRAL DEVELOPMENT CORP12/23/2005
BISSPISSUEDVIP FIRE SPRINKLER INC06/08/2005
BISOTISSUEDCENTRAL DEVELOPMENT CORP03/10/2005
1 project · most recent 02/18/2026
Gas
FiledStatusContractorScope
02/18/2026Signed-offJ-J PLUMBING CORPGas
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/24/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/16/2026Pass-Final Boiler Equipment InspectionPassView ↗
03/10/2026Pass-Final Boiler Equipment InspectionPassView ↗
09/26/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
02/13/2026Tenant Protection Plan Compliance—special
09/18/2025Heating SystemsALEXIS SCHLESSINGERMANspecial
09/18/2025Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
09/18/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
09/18/2025HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
09/18/2025HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
09/18/2025HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
08/28/2025Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
08/28/2025Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
08/27/2025HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
08/27/2025Heating SystemsALEXIS SCHLESSINGERMANspecial
08/27/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
08/27/2025HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
08/27/2025HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
08/26/2025Heating SystemsALEXIS SCHLESSINGERMANspecial
08/25/2025HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
08/25/2025HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
08/25/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
08/25/2025HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
06/13/2024Exterior lighting powerALEXIS SCHLESSINGERMANenergy_progress
06/13/2024Lighting controlsALEXIS SCHLESSINGERMANenergy_progress
06/13/2024Air barrier - visual inspectionALEXIS SCHLESSINGERMANenergy_progress
06/13/2024Interior lighting powerALEXIS SCHLESSINGERMANenergy_progress
06/13/2024Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
06/13/2024Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
Latest 25 of 41.
▾Documents — 68 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/28/2026M00828324-I1Request digital key ↗
08/28/2026M00828324-P1Request digital key ↗
08/25/2026M01143838-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits8
▸DOB NOWLPC Approval/Permit5
08/13/2026M01047545-S1Open ↗
08/13/2026M01047545-P3Open ↗
08/13/2026M00828324-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
05/16/2014121439363Open ↗
11/21/2012121439363Open ↗
▸BISWORK PERMIT APPLICATION1
11/21/2012121439363Open ↗
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/28/2026M00828324-I1Open ↗
08/28/2026M00828324-P1Open ↗
08/13/2026M01047545-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/23/2026M00828324-I1Open ↗
09/23/2026M00828324-I1Open ↗
08/27/2026M00828324-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026M00828324-I1Open ↗
08/27/2026M00828324-P1Open ↗
08/23/2026M01047545-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
06/20/2014121439363Open ↗
02/19/2014121439363Open ↗
11/21/2012121439363Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/21/2012121439363Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
11/21/2012121439363Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/28/2026M00828324-P1Open ↗
08/28/2026M00828324-I1Open ↗
08/13/2026M01047545-P1Open ↗
Showing 3 of 8 on file for this type
▸Approvals, Objections & Sign-offs11
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
08/13/2026M00828324-I1Open ↗
08/13/2026M00828324-P1Open ↗
08/13/2026M01047545-P3Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
06/20/2014121439363Open ↗
02/19/2014121439363Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/20/2014121439363Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
11/21/2012121439363Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
06/17/2014121439363Open ↗
05/16/2014121439363Open ↗
▸BISEFILING COVER SHEET1
11/21/2012121439363Open ↗
▸Other Documents2
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026M00828324-P1Open ↗
08/13/2026M00828324-I1Open ↗