← Back
Over six families without stores
1671 LINCOLN PLACE
BROOKLYN · BIN 3039507
💬 Discuss this project
1910Year Built
4Stories
C1Building Class
R6Zoning
12,600 sfGross Floor Area
16Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Over six families without stores · Owner of record: 1671 LINCOLN PLACE NY LLC · 5,323 sf lot · 2.37 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Cellar3p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1671 LINCOLN LLC2103/22/2026
1671 LINCOLN PLACE NY1503/22/2026
BUILDING MANAGEMENT OFFICE103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/27/2018$3.9M—IRVING V LLC → 1671 LINCOLN PLACE NY LLC$310/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KMP DESIGN & ENGINEERING PLLC306/24/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KMP DESIGN ENGINEERING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRIME PIPING & HEATING INPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KMP DESIGN & ENGINEERING1630306/24/2021
Building Lifecycle
All (83)Filed (3)Permit Issued (2)Signed Off (2)Violation (60)Inspection (4)Objection (2)Special Inspection (10)
06/10/2025
Violation issued (HPD, closed)
A
03/18/2025
Violation issued (HPD, closed)
B
03/18/2025
Violation issued (HPD, closed)
A
03/18/2025
Violation issued (HPD, closed)
B
03/18/2025
Violation issued (HPD, closed)
C
03/18/2025
Violation issued (HPD, closed)
B
03/18/2025
Violation issued (HPD, closed)
C
03/18/2025
Violation issued (HPD, closed)
C
03/18/2025
Violation issued (HPD, closed)
B
03/18/2025
Violation issued (HPD, closed)
C
03/18/2025
Violation issued (HPD, closed)
B
03/18/2025
Violation issued (HPD, closed)
B
03/18/2025
Violation issued (HPD, closed)
B
03/18/2025
Violation issued (HPD, closed)
C
03/18/2025
Violation issued (HPD, closed)
A
03/18/2025
Violation issued (HPD, closed)
C
03/18/2025
Violation issued (HPD, closed)
B
03/18/2025
Violation issued (HPD, closed)
C
04/10/2024
Violation issued (HPD, closed)
A
10/06/2023
Violation issued (HPD, closed)
B
10/06/2023
Violation issued (HPD, closed)
B
10/06/2023
Violation issued (HPD, closed)
B
10/06/2023
Violation issued (HPD, closed)
B
10/04/2023
Violation issued (HPD, closed)
C
10/04/2023
Violation issued (HPD, closed)
B
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/25/2022
Violation issued (HPD, closed)
A
09/08/2021
Signed off — Alteration
REMOVE BATHROOM IN CELLAR. REPLACE EXISTING 3 WASHERS AND 3 ELECTRIC DRYERS. ADD NEW GAS BOILER AND ANOTHER NEW ELECTRIC WATER HEATER.
B00407582-I1
09/07/2021
Signed off — Alteration
NEW GAS BOILER FOR HEATING IN OPEN CELLAR.
B00468221-I1
07/14/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/14/2021
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/30/2021
Special inspection requirement — HVAC-R and service water heating system controls
KENNETH PHILOGENE
06/30/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
KENNETH PHILOGENE
06/30/2021
Special inspection requirement — Heating Systems
KENNETH PHILOGENE
06/30/2021
Special inspection requirement — HVAC-R and service water heating equipment
KENNETH PHILOGENE
06/30/2021
Special inspection requirement — Maintenance information
KENNETH PHILOGENE
06/24/2021
Filed — Alteration
NEW GAS BOILER FOR HEATING IN OPEN CELLAR.
B00468221-P1
06/15/2021
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
06/11/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/25/2021
Permit issued — Plumbing
B00407582-I1-PL
05/25/2021
Permit issued — Boiler Equipment
B00468221-I1-BE
05/12/2021
Filed — Alteration
NEW GAS BOILER FOR HEATING IN OPEN CELLAR.
B00468221-I1
04/09/2021
Violation issued (HPD, closed)
A
02/04/2021
Objection raised — Scope
02/04/2021
Objection resolved — Addressed
01/29/2021
Filed — Alteration
REMOVE BATHROOM IN CELLAR. REPLACE EXISTING 3 WASHERS AND 3 ELECTRIC DRYERS. ADD NEW GAS BOILER AND ANOTHER NEW ELECTRIC WATER HEATER.
B00407582-I1
01/18/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
KENNETH PHILOGENE
01/18/2021
Special inspection requirement — Energy Code Compliance
KENNETH PHILOGENE
01/18/2021
Special inspection requirement — HVAC and service water heating equipment
KENNETH PHILOGENE
01/18/2021
Special inspection requirement — HVAC and service water heating system controls
KENNETH PHILOGENE
01/18/2021
Special inspection requirement — Maintenance information
KENNETH PHILOGENE
10/31/2019
Violation issued (HPD, closed)
B
10/18/2018
Violation issued (HPD, closed)
I
05/30/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2018
Violation issued (ECB, closed)
Construction
02/03/2018
Violation issued (HPD, closed)
A
02/03/2018
Violation issued (ECB, closed)
Construction
01/31/2018
Violation issued (HPD, closed)
I
11/16/2017
Violation issued (ECB, closed)
Unknown
11/16/2017
Violation issued (ECB, closed)
Unknown
Latest 60 of 83 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN05/25/2021
DOB NOWBoiler EquipmentSigned-offPRIME PIPING & HEATING IN05/25/2021
BISOTISSUEDAA INSPECTION & BUILDING01/25/2021
BISMHISSUEDCAVALRY LLC02/21/2019
BISOTISSUEDCAVALRY LLC12/13/2018
BISPLISSUEDPRIME PIPING & HEATING IN10/05/2018
BISOTISSUEDT&S HOME IMPROVEMENT INC09/06/2018
BISOTISSUEDSMVP MGMT INC07/18/2018
BISPLISSUEDTOP PLUMBING GROUP,INC07/18/2018
BISPLISSUEDDMT PLUMBING & HEATING CORP.11/03/2013
BISFBISSUEDDMT PLUMBING&HEATING CORP06/21/2012
BISPLISSUEDDMT PLUMBING & HEATING CORP.06/21/2012
BISBLISSUEDRB HTG CONSULTING GROUP12/11/2006
2 projects · most recent 04/12/2019
General Wiring
FiledStatusContractorScope
04/12/2019CompleteILLUMINOUS ELECTRIC CORP.General Wiring
10/08/2018CompleteILLUMINOUS ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/14/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/14/2021Pass-Final Boiler Equipment InspectionPassView ↗
06/15/2021Fail-Final Boiler Equipment InspectionFailView ↗
06/11/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
06/30/2021HVAC-R and service water heating system controlsKENNETH PHILOGENEenergy_progress
06/30/2021Fire-Resistant Penetrations and JointsKENNETH PHILOGENEspecial
06/30/2021Heating SystemsKENNETH PHILOGENEspecial
06/30/2021HVAC-R and service water heating equipmentKENNETH PHILOGENEenergy_progress
06/30/2021Maintenance informationKENNETH PHILOGENEenergy_progress
01/18/2021Fire-Resistant Penetrations and JointsKENNETH PHILOGENEspecial
01/18/2021Energy Code ComplianceKENNETH PHILOGENEprogress
01/18/2021HVAC and service water heating equipment KENNETH PHILOGENEenergy_progress
01/18/2021HVAC and service water heating system controls KENNETH PHILOGENEenergy_progress
01/18/2021Maintenance informationKENNETH PHILOGENEenergy_progress
▾Documents — 219 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/01/2026B00468221-I1Request digital key ↗
08/15/2026B00468221-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/15/2026B00407582-I1Request digital key ↗
▸Applications & Permits29
▸BISPLAN / WORK APPROVAL APPLICATION18
08/22/2025302273457Open ↗
01/05/2021340792967Open ↗
12/09/2020340792967Open ↗
Showing 3 of 18 on file for this type
▸BISWORK PERMIT APPLICATION8
01/25/2021340792967Open ↗
02/22/2019322067259Open ↗
12/17/2018321769573Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
07/11/2019321769582Open ↗
01/18/2019321769564Open ↗
08/27/2018321769573Open ↗
▸Seals & Professional Certifications34
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION18
06/11/2019321769582Open ↗
06/11/2019321769582Open ↗
05/16/2019322067259Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
01/24/2019322067259Open ↗
07/19/2018321769564Open ↗
06/27/2012320496511Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/01/2026B00407582-I1Open ↗
09/01/2026B00468221-I1Open ↗
09/01/2026B00468221-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026B00407582-I1Open ↗
08/28/2026B00407582-I1Open ↗
08/24/2026B00468221-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
01/24/2019322067259Open ↗
07/19/2018321769564Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026B00407582-I1Open ↗
08/24/2026B00468221-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/09/2020340792967Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/27/2012320496511Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/09/2020340792967Open ↗
▸Trade Schedules & Equipment40
▸BISEQUIPMENT USE PERMITS21
05/16/2019322067259Open ↗
05/16/2019322067259Open ↗
05/16/2019322067259Open ↗
Showing 3 of 21 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT7
05/16/2019322067259Open ↗
05/16/2019322067259Open ↗
05/16/2019322067259Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
12/13/2018321769573Open ↗
11/20/2018321769573Open ↗
07/19/2018321769564Open ↗
Showing 3 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
12/28/2013320496511Open ↗
12/03/2013320496511Open ↗
08/30/2013320496511Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
06/27/2012320496511Open ↗
▸BISSCHEDULE B - PLUMBING1
06/27/2012320496511Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
06/11/2019321769582Open ↗
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes3
01/24/2019322067259Open ↗
10/22/2018321769582Open ↗
08/22/2018321769573Open ↗
▸BISSTREET TREE CHECKLIST1
11/14/2017321021283Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
01/15/2021340792967Open ↗
▸DOB NOWTenant Protection Plan1
08/15/2026B00407582-I1Open ↗
▸Environmental & Asbestos10
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
12/09/2020340792967Open ↗
01/24/2019322067259Open ↗
07/19/2018321769564Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/01/2026B00468221-P1Open ↗
09/01/2026B00468221-I1Open ↗
08/15/2026B00407582-I1Open ↗
▸Energy Compliance30
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS17
06/11/2019321769582Open ↗
06/11/2019321769582Open ↗
05/16/2019322067259Open ↗
Showing 3 of 17 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
08/27/2021340792967Open ↗
06/11/2019321769582Open ↗
05/16/2019322067259Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
09/02/2021340792967Open ↗
09/02/2021340792967Open ↗
01/25/2021340792967Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/15/2026B00407582-I1Open ↗
08/13/2026B00468221-I1Open ↗
▸BISTR8: Energy Code Progress Inspections1
04/25/2014320496511Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY10
08/31/2021340792967Open ↗
08/31/2021340792967Open ↗
08/31/2021340792967Open ↗
Showing 3 of 10 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
05/06/2019321769573Open ↗
04/26/2019321769573Open ↗
▸Approvals, Objections & Sign-offs18
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
09/02/2021340792967Open ↗
08/23/2019321769582Open ↗
06/11/2019321769582Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
04/19/2019321769582Open ↗
12/27/2018321769564Open ↗
12/14/2018321769573Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSUPERSEDING LETTER1
12/17/2018321769573Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT14
08/27/2021340792967Open ↗
12/09/2020340792967Open ↗
06/11/2019321769582Open ↗
Showing 3 of 14 on file for this type
▸Filing & Intake Forms22
▸BISADDITIONAL INFORMATION8
08/02/2019321769582Open ↗
05/08/2019322067259Open ↗
04/26/2019322067259Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM7
06/11/2019321769582Open ↗
05/16/2019322067259Open ↗
05/06/2019321769573Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET6
02/04/2019322067259Open ↗
07/19/2018321769564Open ↗
07/19/2018321769573Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
12/09/2020340792967Open ↗
▸Other Documents1
▸DOB NOWHPD4: CONH Pilot Program1
08/13/2026B00468221-P1Open ↗