← Back
Predominantly retail with other uses
1673 LEXINGTON AVENUE
MANHATTAN · East Harlem (South) · BIN 1051984
💬 Discuss this project
1910Year Built
3Stories
K4Building Class
R7DZoning
3,126 sfGross Floor Area
3Units
Rent Stabilized0 Open Violations
Predominantly retail with other uses · Owner of record: 7173 ASSOCIATES LLC · 880 sf lot · 3.55 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
CellarUnder Construction4p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
7173 ASSOCIATES3108/29/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAYSIDE ENGINEERING PC904/06/2026
ARQUITECTURA VARELA108/14/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H J BUILDING CONSULTING1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALPHA RESTORATION & CONSGeneral Contractor303/21/2026
AMERICAN STANDARD P&H CORORP.Plumbing206/28/2026
KALE CONSTRUCTION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD TESTING & INSPECTION S7010904/06/2026
AA BUILDING & INSPECTION1519108/14/2023
BUTTERFIELD & O'CONNOR4189108/14/2023
Building Lifecycle
All (71)Filed (10)Permit Issued (4)Violation (2)Inspection (17)Objection (8)Special Inspection (30)
04/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
XIUCHENG LI
04/22/2026
Special inspection requirement — Maintenance information
XIUCHENG LI
04/22/2026
Special inspection requirement — Lowest Floor Elevation
XIUCHENG LI
04/22/2026
Special inspection requirement — Heating Systems
XIUCHENG LI
04/22/2026
Special inspection requirement — Permanent certificate
XIUCHENG LI
04/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
XIUCHENG LI
04/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
04/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
XIUCHENG LI
04/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
XIUCHENG LI
04/06/2026
Filed — Alteration
INSTALL NEW BOILER AT CELLAR ONLY OF EXISTING 4-STORY BUILDING AS PER PLANS FILED HEREWITH. RELATED GENERAL CONSTRUCTION WORK AND PLUMBING WORK HAVE BEEN FILED INITIALLY. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
M01162759-P6
04/06/2026
Special inspection requirement — Maintenance information
XIUCHENG LI
04/06/2026
Special inspection requirement — Lowest Floor Elevation
XIUCHENG LI
04/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
XIUCHENG LI
04/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
XIUCHENG LI
04/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
04/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
XIUCHENG LI
04/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
XIUCHENG LI
04/06/2026
Special inspection requirement — Heating Systems
XIUCHENG LI
04/06/2026
Special inspection requirement — Permanent certificate
XIUCHENG LI
04/03/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/02/2026
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
03/16/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/06/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/03/2026
Special inspection requirement — Subgrade Inspections
XIUCHENG LI
03/03/2026
Special inspection requirement — Concrete - Cast-In-Place
XIUCHENG LI
03/03/2026
Special inspection requirement — Maintenance information
XIUCHENG LI
03/03/2026
Special inspection requirement — Interior lighting power
XIUCHENG LI
03/03/2026
Special inspection requirement — Permanent certificate
XIUCHENG LI
03/03/2026
Special inspection requirement — Lighting in dwelling units
XIUCHENG LI
03/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIUCHENG LI
03/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
03/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
XIUCHENG LI
03/03/2026
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
03/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
XIUCHENG LI
03/03/2026
Special inspection requirement — Lighting controls
XIUCHENG LI
02/12/2026
Filed — Alteration
INSTALL NEW BOILER AT CELLAR ONLY OF EXISTING 4-STORY BUILDING AS PER PLANS FILED HEREWITH. RELATED GENERAL CONSTRUCTION WORK AND PLUMBING WORK HAVE BEEN FILED INITIALLY. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
M01162759-P2
02/12/2026
Filed — Alteration
INSTALL NEW BOILER AT CELLAR ONLY OF EXISTING 4-STORY BUILDING AS PER PLANS FILED HEREWITH. RELATED GENERAL CONSTRUCTION WORK AND PLUMBING WORK HAVE BEEN FILED INITIALLY. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
M01162759-P3
02/03/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/24/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/15/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/28/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/28/2025
Filed — Alteration
INSTALL NEW BOILER AT CELLAR ONLY OF EXISTING 4-STORY BUILDING AS PER PLANS FILED HEREWITH. RELATED GENERAL CONSTRUCTION WORK AND PLUMBING WORK HAVE BEEN FILED INITIALLY. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
M01162759-P5
10/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/25/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/17/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/11/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/11/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/08/2025
Filed — Alteration
INSTALL NEW BOILER AT CELLAR ONLY OF EXISTING 4-STORY BUILDING AS PER PLANS FILED HEREWITH. RELATED GENERAL CONSTRUCTION WORK AND PLUMBING WORK HAVE BEEN FILED INITIALLY. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
M01162759-P4
05/19/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/01/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/29/2025
Filed — Alteration
INSTALL NEW BOILER AT CELLAR ONLY OF EXISTING 4-STORY BUILDING AS PER PLANS FILED HEREWITH. RELATED GENERAL CONSTRUCTION WORK AND PLUMBING WORK HAVE BEEN FILED INITIALLY. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
M01162759-P1
04/09/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/21/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/12/2025
Permit issued — Boiler Equipment
M01162759-S2-BE
03/12/2025
Permit issued — Plumbing
M01162759-S1-PL
03/11/2025
Permit issued — General Construction
M01162759-I1-GC
02/26/2025
Filed — Alteration
INSTALL NEW BOILER AT CELLAR ONLY OF EXISTING 4-STORY BUILDING AS PER PLANS FILED HEREWITH. RELATED GENERAL CONSTRUCTION WORK AND PLUMBING WORK HAVE BEEN FILED INITIALLY. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
M01162759-S2
02/01/2025
Objection resolved — Addressed
02/01/2025
Objection resolved — Addressed
02/01/2025
Objection resolved — Addressed
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedAMERICAN STANDARD P&H CORORP.03/12/2025
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.03/12/2025
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC03/11/2025
DOB NOWGeneral ConstructionPermit IssuedALPHA RESTORATION & CONS10/10/2023
BISOTISSUEDNEPTUNE INC03/21/2012
BISOTISSUEDFOREVIEW DEVELOPMENT INC03/11/2011
BISOTISSUEDFOREVIEW DEVELOPMENT INC03/12/2010
BISPLISSUEDDYCKMAN PLBG & HTG INC04/10/2009
BISOTISSUEDFOREVIEW DEVELOPMENT INC04/08/2009
BISPLISSUEDEXPRESS PLBG HTG&GAS LEAK09/30/1994
1 project · most recent 04/06/2026
Gas
FiledStatusContractorScope
04/06/2026Permit IssuedAMERICAN STANDARD P&H CORGas
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
04/03/2026Pass-Final General Construction Non-Directive 14PassView ↗
04/02/2026Fail-Final Boiler Equipment InspectionFailView ↗
03/16/2026Fail-Final General Construction Non-Directive 14FailView ↗
03/06/2026Fail-Final General Construction Non-Directive 14FailView ↗
02/03/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/24/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/15/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/28/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/25/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/17/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/11/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/11/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/19/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/01/2025Fail-Final General Construction Non-Directive 14FailView ↗
04/09/2025Fail-Final General Construction Non-Directive 14FailView ↗
03/21/2025Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 70
DateRequirementInspectorRole
04/22/2026Permanent certificateXIUCHENG LIenergy_progress
04/22/2026Tenant Protection Plan ComplianceXIUCHENG LIspecial
04/22/2026HVAC-R and service water heating equipmentXIUCHENG LIenergy_progress
04/22/2026HVAC-R and service water heating system controlsXIUCHENG LIenergy_progress
04/22/2026Maintenance informationXIUCHENG LIenergy_progress
04/22/2026HVAC-R and service water piping design and insulationXIUCHENG LIenergy_progress
04/22/2026Heating SystemsXIUCHENG LIspecial
04/22/2026Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
04/22/2026Lowest Floor ElevationXIUCHENG LIprogress
04/06/2026HVAC-R and service water piping design and insulationXIUCHENG LIenergy_progress
04/06/2026Maintenance informationXIUCHENG LIenergy_progress
04/06/2026HVAC-R and service water heating equipmentXIUCHENG LIenergy_progress
04/06/2026HVAC-R and service water heating system controlsXIUCHENG LIenergy_progress
04/06/2026Permanent certificateXIUCHENG LIenergy_progress
04/06/2026Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
04/06/2026Heating SystemsXIUCHENG LIspecial
04/06/2026Tenant Protection Plan ComplianceXIUCHENG LIspecial
04/06/2026Lowest Floor ElevationXIUCHENG LIprogress
03/03/2026Maintenance informationXIUCHENG LIenergy_progress
03/03/2026Lighting in dwelling unitsXIUCHENG LIenergy_progress
03/03/2026Lighting controlsXIUCHENG LIenergy_progress
03/03/2026Subgrade InspectionsXIUCHENG LIspecial
03/03/2026Concrete - Cast-In-PlaceXIUCHENG LIspecial
03/03/2026Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
03/03/2026Structural Stability – Alterations of existing buildingsXIUCHENG LIspecial
Latest 25 of 70.
▾Documents — 81 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/29/2026M00893481-I1Request digital key ↗
08/18/2026M01162759-I1Request digital key ↗
08/18/2026M01162759-S1Request digital key ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications62
▸DOB NOWProgress Inspector Seal & Signature33
09/25/2026M01162759-I1Open ↗
09/25/2026M01162759-I1Open ↗
09/25/2026M01162759-I1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/25/2026M01162759-I1Open ↗
09/25/2026M01162759-I1Open ↗
09/25/2026M01162759-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/18/2026M01162759-P6Open ↗
08/18/2026M01162759-I1Open ↗
08/18/2026M01162759-S1Open ↗
Showing 3 of 10 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/18/2026M01162759-P6Open ↗
08/18/2026M01162759-I1Open ↗
08/18/2026M01162759-S1Open ↗
Showing 3 of 9 on file for this type