← Back
BuildNYC
One story retail building
1678 RICHMOND ROAD
STATEN ISLAND · BIN 5050604
💬 Discuss this project
1950Year Built
1Stories
K1Building Class
R3-1Zoning
13,400 sfGross Floor Area
7Units
7 Active Violations 6 unresolved · 1 paperwork only 1 likely answered 3 old, status unconfirmed ▸
One story retail building · Owner of record: Union Center · 27,000 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofChildren of America3 filings · 6 docs
Floor 5THE GOAT non-illuminated wall sign1p · 1 filing · 3 docs
Floor 4THE GOAT non-illuminated wall sign1p · 1 filing · 3 docs
Floor 3THE GOAT non-illuminated wall sign1p · 1 filing · 3 docs
Floor 2THE GOAT non-illuminated wall sign1p · 1 filing · 3 docs
Floor 1Children of America1p · 6 filings · 13 docs
CellarChildren of America2 filings · 4 docs
Filed — no permit issuedAb Capstone Development1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AB Capstone Development1103/21/2026
Abcapstone103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Design Build SI502/11/2021
Shahrish Shuvo Engineering106/12/2020
Norman C. Lok, PE109/17/2018
Chun Engineering Consultant101/05/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Design Build SI1103/21/2026
AB Capstone Development103/21/2026
Louis Striar203/21/2026
Design Build S I103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Joey Electrical CoElectrical103/21/2026
Morales Electrical Cont'gElectrical103/22/2026
Vulpis Eastin Electric CoElectrical103/21/2026
A1 SpecializedSign hanger107/08/2026
Building Lifecycle
All (75)Filed (8)Permit Issued (1)Signed Off (1)Violation (40)Objection (8)Special Inspection (17)
07/02/2026
Violation issued (ECB, open)
Construction
07/02/2026
Violation issued (ECB, open)
Construction
05/09/2026
Violation issued (ECB, open)
Construction
05/09/2026
Violation issued (ECB, open)
Construction
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/01/2025
Violation issued (ECB, open)
Boilers
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/17/2021
Objection raised — Scope
02/17/2021
Objection raised — Scope
02/11/2021
Filed — Alteration
INSTALLATION OF 7 HVAC UNITS AND 1 HOT WATER HEATER,SEE S00366217 FOR HOT WATER HEATER.
S00366240-I1
02/11/2021
Filed — Alteration
DOCUMENTS FILED HEREWITH TO CUT, CAP AND REMOVAL ALL EXISTING FIXTURES AND PIPING. INSTALLATION OF NEW GAS, STORM, WATER AND SANITARY FIXTURES FOR THE CONSTRUCTION OF A DAY CARE FACILITY.
S00366217-I1
07/02/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/02/2020
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
07/02/2020
Special inspection requirement — HVAC and service water heating equipment
07/02/2020
Special inspection requirement — Maintenance information
07/02/2020
Special inspection requirement — HVAC and service water heating system controls
07/02/2020
Special inspection requirement — Mechanical Systems
07/02/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/02/2020
Special inspection requirement — Heating Systems
07/02/2020
Special inspection requirement — Final
07/02/2020
Special inspection requirement — Energy Code Compliance Inspections
07/02/2020
Special inspection requirement — HVAC and service water heating system controls
07/02/2020
Special inspection requirement — HVAC and service water heating equipment
07/02/2020
Special inspection requirement — HVAC insulation and sealing
07/02/2020
Special inspection requirement — Maintenance information
07/02/2020
Special inspection requirement — Permanent certificate
07/02/2020
Special inspection requirement — Shutoff dampers
07/02/2020
Special inspection requirement — Duct leakage testing
06/26/2020
Objection resolved — Addressed
06/12/2020
Filed — Alteration
S00311393-I1
06/12/2020
Objection raised — Structural
06/11/2020
Filed — Alteration
INSTALLATION OF A SOLID TEMPORARY CONSTRUCTION FENCE.
S00326444-I1
03/19/2020
Filed — Alteration
S00311810-I1
03/19/2020
Filed — Alteration
INSTALLATION OF NEW CURB CUT. 17LF INCLUSIVE OF 2-30" SPLAYS
S00311787-I1
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/26/2018
Signed off — Alteration
S00076189-I1
09/26/2018
Permit issued — Sign
S00076189-I1-SG
09/17/2018
Filed — Alteration
S00076189-I1
03/21/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/21/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/08/2018
Objection raised — Other
01/08/2018
Objection raised — Other
01/08/2018
Objection raised — AC 2014, DOT 2010-CC AC 28-104
01/08/2018
Objection raised — Other
01/05/2018
Filed — Alteration
S00009637-I1
12/18/2017
Violation issued (ECB, closed)
Construction
12/18/2017
Violation issued (ECB, closed)
Construction
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/10/2008
Violation issued (ECB, closed)
Construction
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/23/2001
Violation issued (ECB, closed)
Construction
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/09/1997
Violation issued (ECB, closed)
Construction
06/16/1997
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offMad Signs09/26/2018
BISFPISSUEDMaster Fire Systems10/15/2018
BISMHISSUEDMaster Fire Mechanical09/28/2018
BISPLISSUEDJohnny's P&H Contracting09/21/2018
BISOTISSUEDDesign Build SI09/21/2018
BISPLISSUEDJohnny's P&H Contracting08/13/2018
BISPLISSUEDEmpire Water Main & SWR04/25/2018
BISMHISSUEDAB Capstone Builders04/25/2018
BISOTISSUEDAB Capstone Builders04/09/2018
BISOTISSUEDLionheart Construction Co02/13/2015
BISFPISSUEDIdeal Fire Systems08/04/2006
BISOTISSUEDR.G.M. Signs07/27/2004
BISOTISSUEDMcNamara Building06/03/2003
BISMHISSUEDN/A11/12/2002
BISOTISSUEDMJM Enterprises04/21/1997
BISOTISSUEDSalvatore Calcagno Construction08/19/1996
BISOTISSUEDAction Taping & Spackling01/31/1996
BISPLISSUEDFlow Sure PL & Heating12/22/1995
BISOTISSUEDCaracciolo Construction Co07/07/1995
BIS—ISSUEDMidwood Signs09/23/1992
BISPLISSUEDSanti Lembo Plumbing & Heating09/10/1992
BISPLISSUEDSanti Lembo Plumbing & Heating09/02/1992
BISFPISSUEDIdeal Fire Control09/01/1992
BIS—ISSUEDAviva Asoociates08/20/1992
BISOTISSUEDAviva Associates04/27/1992
1 project · most recent 02/11/2021
Air Conditioning Systems Associated Ducts and Piping Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
02/11/2021——Air Conditioning Systems, Associated Ducts and Piping, Heating Systems
Cooling
Carrier 48KCEB06A2PF 5 tons · Rooftop Unit ×2
48TGCDM05A2A5 4 tons · Rooftop Unit ×2
Heating
Carrier 59SC2C100S21 89,000 BTU · Furnace ×2
58STA110-1-22 89,000 BTU · Furnace ×1
1 project · most recent 02/11/2021
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/11/2021——Gas, Storm, Water/Sanitary
2 projects · most recent 03/08/2023
General Wiring
FiledStatusContractorScope
03/08/2023CompleteC.B. Mills Electric1 meters
11/20/2018CompleteMorales Electrical Cont'gGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
07/02/2020Fire-Resistant Penetrations and Joints—special
07/02/2020Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
07/02/2020HVAC and service water heating equipment —energy_progress
07/02/2020Maintenance information—energy_progress
07/02/2020HVAC and service water heating system controls —energy_progress
07/02/2020Mechanical Systems—special
07/02/2020Fire-Resistant Penetrations and Joints—special
07/02/2020Heating Systems—special
07/02/2020Final—progress
07/02/2020Energy Code Compliance Inspections—progress
07/02/2020HVAC and service water heating system controls —energy_progress
07/02/2020HVAC and service water heating equipment —energy_progress
07/02/2020HVAC insulation and sealing —energy_progress
07/02/2020Maintenance information—energy_progress
07/02/2020Permanent certificate—energy_progress
07/02/2020Shutoff dampers—energy_progress
07/02/2020Duct leakage testing —energy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Children of AmericaEducationCellar, Floor 1, Roof
Project S00366217 Alteration · Objections · 02/11/2021
Project S00366240 Alteration · Objections · 02/11/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 119 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch2
08/26/2026S00009637-I1Request digital key ↗
08/26/2026S00076189-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut2
08/26/2026S00311787-I1Request digital key ↗
08/26/2026S00311810-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026S00366240-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/26/2026S00311393-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/14/2026S00326444-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/25/2026S00366217-I1Request digital key ↗
▸Applications & Permits25
▸BISPLAN / WORK APPROVAL APPLICATION14
10/05/2020540180427Open ↗
03/13/2019520324765Open ↗
03/13/2019520324774Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION10
10/16/2018520359335Open ↗
10/01/2018520359326Open ↗
09/24/2018520324774Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
12/24/2018520135363Open ↗
▸Seals & Professional Certifications29
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
10/01/2018520359326Open ↗
10/01/2018520359326Open ↗
10/01/2018520359326Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026S00076189-I1Open ↗
08/26/2026S00311810-I1Open ↗
08/26/2026S00326444-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
10/01/2018520359326Open ↗
10/01/2018520359335Open ↗
09/24/2018520324774Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
10/01/2018520359326Open ↗
10/01/2018520359335Open ↗
09/24/2018520324774Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/05/2020540180427Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/06/2020540180427Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
03/13/2019520324765Open ↗
03/13/2019520324774Open ↗
09/24/2018520324774Open ↗
Showing 3 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
02/28/2019520359335Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
10/01/2018520359326Open ↗
▸Environmental & Asbestos7
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
10/01/2018520359326Open ↗
09/24/2018520324774Open ↗
03/20/2018520324765Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/26/2026S00076189-I1Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
10/01/2018520359326Open ↗
10/01/2018520359326Open ↗
09/24/2018520324774Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
01/30/2018520135363Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/06/2020540180427Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/09/2015520230599Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
01/30/2018520135363Open ↗
▸Approvals, Objections & Sign-offs8
▸BISADMINISTRATIVE OBJECTIONS5
10/01/2018520359326Open ↗
09/24/2018520324774Open ↗
02/22/2018520324765Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
02/28/2019520359335Open ↗
03/09/2015520230599Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
01/04/2018520135363Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT9
02/28/2019520359335Open ↗
10/01/2018520359326Open ↗
10/01/2018520359335Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms13
▸BISEFILING COVER SHEET7
10/01/2018520359326Open ↗
10/01/2018520359335Open ↗
09/24/2018520324774Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM3
03/13/2019520324765Open ↗
03/13/2019520324774Open ↗
02/28/2019520359335Open ↗
▸BISADDITIONAL INFORMATION2
03/16/2020520324765Open ↗
02/27/2017520135363Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/05/2020540180427Open ↗