DOB07/08/2026CORRECTIVE ACTION PLAN-OBSVD SEVERAL STEP CRACKS AND CRACKED MORTAR AT VARIOUS LOCATIONS INCLUD HORIZONTAL CRACKS OVER MAIN ENTRANCE, STEP CRACKS OVER SIDE DOOR ENTRANCE AND ABOVE WINDOWS AT EXP3. OWNER TO IMMED RETAIN DESIGN PROF IN GOOD STANDING WITH DOB&NYS TO EVAL ENTIRE BLDG AND SUBMIT A CORRECTIVE ACTION PLAN
Miscellaneous two family · 6,000 sf lot · 0.42 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.