← Back
BuildNYC
One story - permanent living quarter
168-35 84TH AVENUE
QUEENS · BIN 4211045
💬 Discuss this project
1930Year Built
1.5Stories
A2Building Class
R3XZoning
1,594 sfGross Floor Area
1Units
One story - permanent living quarter · Owner of record: Elliot Church, Robin · 5,000 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRobin Elliot Church2p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Green River Environmental Engineering104/20/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYSSGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Green River Environmental7841104/20/2026
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
06/30/2026
Signed off — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
Q01389710-I1
04/23/2026
Permit issued — Solar
Q01389710-I1-SL
04/20/2026
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
Q01389710-I1
04/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT MASONE
04/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT MASONE
04/20/2026
Special inspection requirement — Energy Code Compliance Inspections
ROBERT MASONE
04/20/2026
Special inspection requirement — Final
ROBERT MASONE
04/20/2026
Special inspection requirement — Air barrier - visual inspection
ROBERT MASONE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYSS04/23/2026
1 project · most recent 04/20/2026
FiledStatusContractorScope
04/20/2026CompleteNY Solar Electrical—
1 project · most recent 04/20/2026
FiledStatusContractorScope
04/20/2026Signed-offNYSS30 panels, 13.2 kw, 2,521 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/20/2026Fire-Resistant Penetrations and JointsROBERT MASONEspecial
04/20/2026Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
04/20/2026Energy Code Compliance InspectionsROBERT MASONEprogress
04/20/2026FinalROBERT MASONEprogress
04/20/2026Air barrier - visual inspectionROBERT MASONEenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Robin Elliot ChurchResidentialRoof
Project Q01389710 Alteration · LOC Issued · 04/20/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026Q01389710-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026Q01389710-I1Open ↗
08/26/2026Q01389710-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026Q01389710-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026Q01389710-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026Q01389710-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/17/2026Q01389710-I1Open ↗