Elevator apt, fireproof without stores
Vista Noble Tower Condominium
168 EAST 111TH STREET · East Harlem (South) · BIN 1091701
💬 Discuss this project
2023Year Built
8Stories
D3Building Class
R7AZoning
29,262 sfGross Floor Area
42Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: KJ EAST 111 REALTY LLC · 7,220 sf lot · 4.05 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Roof1p · 1 filing
Floor 11 filing
Site & exterior6 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KJ EAST 111 REALTY4507/08/2026
CLASSIC CONSULTING GROUP1007/08/2026
KE JU CONTRACTING807/08/2026
KJ EAST III REALTY603/21/2026
MNK ENTERPRISES203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/04/2018$750K—Private party → HARLEM OBSIDIAN AND ASSOCIATES LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING3003/21/2026
DEMOWORKS EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KE JU CONTRACTING CORPGeneral Contractor1607/08/2026
CLASSIC CONSULTING GROUPGeneral Contractor507/08/2026
DYNASTY CONTRACTING LLCGeneral Contractor507/08/2026
MPS PLUMBING & HEATING INCFire Protection207/08/2026
MPS PLUMBING & HEATING INCPlumbing207/08/2026
CHI F LAUElectrical103/21/2026
JC HI TECH INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NTD ENGINEERING CONSULTAN76341204/30/2025
Building Lifecycle
All (182)Filed (21)Permit Issued (22)Signed Off (13)Violation (26)Inspection (16)Objection (54)Special Inspection (30)
05/16/2025
Signed off — Alteration
MECHANICAL SCOPE OF WORK FOR NEW PROPOSED8-STORY RESIDENTIAL BUILDING FILED IN CONJUNCTION WITH NB #121206015
M00221476-I1
05/14/2025
Special inspection requirement — HVAC and service water heating equipment
LI-YUAN LIN
05/14/2025
Special inspection requirement — Final
LI-YUAN LIN
05/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
LI-YUAN LIN
05/14/2025
Special inspection requirement — HVAC insulation and sealing
LI-YUAN LIN
05/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
LI-YUAN LIN
05/14/2025
Special inspection requirement — Shutoff dampers
LI-YUAN LIN
05/14/2025
Special inspection requirement — Mechanical Systems
LI-YUAN LIN
05/14/2025
Special inspection requirement — HVAC and service water heating system controls
LI-YUAN LIN
05/14/2025
Special inspection requirement — Maintenance information
LI-YUAN LIN
05/14/2025
Special inspection requirement — Energy Code Compliance Inspections
LI-YUAN LIN
05/08/2025
Signed off — Alteration
PROPOSE NEW CURB CUT (10 LF) AS PER PLAN. CONJUNCTION WITH NB # 121206015.
M00241506-I1
05/06/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/02/2025
Signed off — Alteration
PLUMBING AND SPRINKLER WORKS FOR NEW 8-STORY BUILDING WITH CELLAR FILED IN CONJUNCTION WITH NB #121206015.
M00229900-I1
04/30/2025
Filed — Alteration
MECHANICAL SCOPE OF WORK FOR NEW PROPOSED8-STORY RESIDENTIAL BUILDING FILED IN CONJUNCTION WITH NB #121206015
M00221476-P1
04/24/2025
Special inspection requirement — HVAC and service water heating system controls
LI-YUAN LIN
04/24/2025
Special inspection requirement — Energy Code Compliance Inspections
LI-YUAN LIN
04/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
LI-YUAN LIN
04/24/2025
Special inspection requirement — Mechanical Systems
LI-YUAN LIN
04/24/2025
Special inspection requirement — Maintenance information
LI-YUAN LIN
04/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
LI-YUAN LIN
04/24/2025
Special inspection requirement — HVAC insulation and sealing
LI-YUAN LIN
04/24/2025
Special inspection requirement — HVAC and service water heating equipment
LI-YUAN LIN
04/24/2025
Special inspection requirement — Shutoff dampers
LI-YUAN LIN
04/24/2025
Special inspection requirement — Final
LI-YUAN LIN
04/23/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
04/17/2025
Signed off — Alteration
Install Temporary Standpipe filed in conjunction with NB # 121206015.
M00949476-I1
04/11/2025
Permit issued — Curb Cut
M00241506-I1-CC
04/04/2025
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
04/04/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/02/2025
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
03/25/2025
Signed off — Alteration
Subsequent Filing for Foundation Scope of work for construction of new concrete 8-story building filed in conjunction with NB # 121206015.
M00221190-S1
03/25/2025
Signed off — Alteration
Subsequent Filing for Foundation Scope of work for construction of new concrete 8-story building filed in conjunction with NB # 121206015.
M00221190-I1
03/20/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/11/2025
Permit issued — Plumbing
M00229900-I1-EW-SP
03/10/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/07/2025
Signed off — Alteration
Propose to install temporary construction fence, total 250.1 LF in conjunction with NB # 121206015.
M00436756-I1
03/03/2025
Special inspection requirement — HVAC and service water heating system controls
LI-YUAN LIN
03/03/2025
Special inspection requirement — Energy Code Compliance Inspections
LI-YUAN LIN
03/03/2025
Special inspection requirement — HVAC and service water heating equipment
LI-YUAN LIN
03/03/2025
Special inspection requirement — Post-installed Anchors
LI-YUAN LIN
03/03/2025
Special inspection requirement — Sprinkler Systems
LI-YUAN LIN
03/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
LI-YUAN LIN
03/03/2025
Special inspection requirement — Maintenance information
LI-YUAN LIN
03/03/2025
Special inspection requirement — Seismic Isolation Systems
LI-YUAN LIN
03/03/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
LI-YUAN LIN
03/03/2025
Special inspection requirement — HVAC insulation and sealing
LI-YUAN LIN
02/24/2025
Filed — Alteration
PLUMBING AND SPRINKLER WORKS FOR NEW 8-STORY BUILDING WITH CELLAR FILED IN CONJUNCTION WITH NB #121206015.
M00229900-P2
02/20/2025
Signed off — Alteration
Subsequent Filing for Foundation Scope of work for construction of new concrete 8-story building filed in conjunction with NB # 121206015.
M00221190-S2
02/04/2025
Permit issued — Structural
M00221190-I1-ST
12/23/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/24/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/17/2024
Permit issued — Plumbing
M00229900-I1-PL
10/15/2024
Signed off — Alteration
M01021051-I1
10/15/2024
Signed off — Alteration
PROPOSED INSTALLATION OF PIPE SCAFFOLD WITH NEEDLE BEAM AND ROOF PROTECTION FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00896339-I1
10/15/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED & ROOF PROTECTION FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014
M00896324-I1
09/29/2024
Permit issued — Construction Fence
M00436756-I1-FN
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/27/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
06/06/2024
Objection resolved — Addressed
Latest 60 of 182 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offKE JU CONTRACTING CORP04/11/2025
DOB NOWPlumbingSigned-offMPS PLUMBING & HEATING INC03/11/2025
DOB NOWStructuralSigned-offKE JU CONTRACTING CORP02/04/2025
DOB NOWPlumbingSigned-offMPS PLUMBING & HEATING IN10/17/2024
DOB NOWConstruction FenceSigned-offKE JU CONTRACTING CORP09/29/2024
DOB NOWMechanical SystemsSigned-offJC HI TECH INC05/03/2024
DOB NOWProtection and Mechanical MethodsSigned-offCLASSIC CONSULTING GROUP03/27/2024
DOB NOWSupport of ExcavationSigned-offKE JU CONTRACTING CORP03/18/2024
DOB NOWConstruction FenceSigned-offKE JU CONTRACTING CORP02/08/2024
DOB NOWStructuralSigned-offKE JU CONTRACTING CORP01/17/2024
DOB NOWFoundationSigned-offKE JU CONTRACTING CORP01/17/2024
DOB NOWStandpipeSigned-offMPS PLUMBING & HEATING INC11/08/2023
DOB NOWSidewalk ShedSigned-offCLASSIC CONSULTING GROUP08/22/2023
DOB NOWSupported ScaffoldSigned-offCLASSIC CONSULTING GROUP08/18/2023
DOB NOWStructuralSigned-offDYNASTY CONTRACTING LLC08/10/2023
DOB NOWSprinklersSigned-offMPS PLUMBING & HEATING IN07/22/2023
DOB NOWSidewalk ShedSigned-offCLASSIC CONSULTING GROUP06/27/2023
DOB NOWSupported ScaffoldSigned-offCLASSIC CONSULTING GROUP06/27/2023
DOB NOWSupport of ExcavationSigned-offDYNASTY CONTRACTING LLC05/16/2023
DOB NOWFoundationSigned-offDYNASTY CONTRACTING LLC05/08/2023
DOB NOWConstruction FenceSigned-offKE JU CONTRACTING CORP12/02/2022
DOB NOWConstruction FenceSigned-offKE JU CONTRACTING CORP10/19/2022
BIS—ISSUEDKE JU CONTRACTING CORP05/09/2024
BIS—ISSUEDKE JU CONTRACTING CORP05/07/2024
BIS—ISSUEDKE JU CONTRACTING CORP05/07/2024
BIS—ISSUEDKE JU CONTRACTING CORP09/12/2023
BIS—ISSUEDKE JU CONTRACTING CORP09/12/2023
6 projects · most recent 04/02/2025
General Wiring
FiledStatusContractorScope
04/02/2025CompleteR & T ELECTRICAL CORPGeneral Wiring
01/03/2024CompleteKJK ELECTRIC INC—
06/24/2023CompleteRICHARD NEU—
09/01/2020CompleteRICHARD NEU—
03/18/2020CompleteHI-RITE ELECTRIC CORPGeneral Wiring
07/26/2019CompleteHI-RITE ELECTRIC CORP1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
05/06/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
04/23/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
04/04/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
04/04/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/02/2025Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
03/20/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/23/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/24/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/27/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/18/2024Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
04/18/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
12/06/2023Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
12/06/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
08/07/2023Pass-Final PL - UndergroundPassView ↗
07/31/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 82
DateRequirementInspectorRole
05/14/2025Mechanical SystemsLI-YUAN LINspecial
05/14/2025Fire-Resistant Penetrations and JointsLI-YUAN LINspecial
05/14/2025Fire-Resistance Rated ConstructionLI-YUAN LINprogress
05/14/2025Energy Code Compliance InspectionsLI-YUAN LINprogress
05/14/2025FinalLI-YUAN LINprogress
05/14/2025HVAC and service water heating equipment LI-YUAN LINenergy_progress
05/14/2025Shutoff dampersLI-YUAN LINenergy_progress
05/14/2025HVAC insulation and sealing LI-YUAN LINenergy_progress
05/14/2025Maintenance informationLI-YUAN LINenergy_progress
05/14/2025HVAC and service water heating system controls LI-YUAN LINenergy_progress
04/24/2025Mechanical SystemsLI-YUAN LINspecial
04/24/2025Fire-Resistant Penetrations and JointsLI-YUAN LINspecial
04/24/2025Energy Code Compliance InspectionsLI-YUAN LINprogress
04/24/2025FinalLI-YUAN LINprogress
04/24/2025Fire-Resistance Rated ConstructionLI-YUAN LINprogress
04/24/2025HVAC and service water heating system controls LI-YUAN LINenergy_progress
04/24/2025Shutoff dampersLI-YUAN LINenergy_progress
04/24/2025HVAC and service water heating equipment LI-YUAN LINenergy_progress
04/24/2025HVAC insulation and sealing LI-YUAN LINenergy_progress
04/24/2025Maintenance informationLI-YUAN LINenergy_progress
03/03/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationLI-YUAN LINspecial
03/03/2025HVAC insulation and sealing LI-YUAN LINenergy_progress
03/03/2025Maintenance informationLI-YUAN LINenergy_progress
03/03/2025HVAC and service water heating equipment LI-YUAN LINenergy_progress
03/03/2025HVAC and service water heating system controls LI-YUAN LINenergy_progress
Latest 25 of 82.
▾Documents — 272 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch10
09/02/2026M00221190-P4Request digital key ↗
09/02/2026M00221190-P3Request digital key ↗
09/02/2026M00221190-P2Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
09/05/2026M00229900-I1Request digital key ↗
09/05/2026M00229900-P2Request digital key ↗
08/15/2026M00229900-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing3
09/05/2026M00229900-P2Request digital key ↗
09/05/2026M00229900-I1Request digital key ↗
08/15/2026M00229900-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
09/04/2026M00436756-I1Request digital key ↗
08/14/2026M00264704-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
09/02/2026M00221190-P1Request digital key ↗
08/15/2026M00221190-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00221476-P1Request digital key ↗
08/14/2026M00221476-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/14/2026M00241506-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00393123-I1Request digital key ↗
▸Applications & Permits26
▸BISPLAN / WORK APPROVAL APPLICATION16
09/18/2025121206015Open ↗
05/13/2025123917529Open ↗
04/21/2025121206015Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION7
05/09/2024121206015Open ↗
05/07/2024121206015Open ↗
05/07/2024121206015Open ↗
Showing 3 of 7 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
11/20/2019140875550Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/01/2025121206015Open ↗
▸BISDEP SD1&2 PLANS PRIOR TO PERMIT.1
06/06/2023121206015Open ↗
▸Zoning, Tax Lot & Property Records10
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
08/17/2025123917529Open ↗
02/22/2022121206015Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
08/17/2025123917529Open ↗
11/04/2019121206015Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION2
08/17/2025123917529Open ↗
02/22/2022121206015Open ↗
▸BISVERIFY TAX LOT1
04/30/2025121206015Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
09/09/2019121206015Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
03/25/2025121206015Open ↗
▸BISZONING DIAGRAM1
03/08/2022121206015Open ↗
▸Seals & Professional Certifications97
▸DOB NOWProgress Inspector Seal & Signature40
09/06/2026M00221476-P1Open ↗
09/06/2026M00221476-P1Open ↗
09/06/2026M00221476-P1Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature35
09/06/2026M00221476-P1Open ↗
09/06/2026M00221476-P1Open ↗
09/02/2026M00949476-I1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/05/2026M00229900-P2Open ↗
09/05/2026M00229900-P1Open ↗
09/05/2026M00229900-I1Open ↗
Showing 3 of 21 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/20/2019140875550Open ↗
▸Trade Schedules & Equipment2
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
04/15/2025121206015Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
04/15/2025121206015Open ↗
▸Safety & Tenant Protection12
▸BISSTREET TREE CHECKLIST4
02/22/2022121206015Open ↗
02/07/2020140875550Open ↗
11/20/2019140875550Open ↗
Showing 3 of 4 on file for this type
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING3
04/01/2025121206015Open ↗
04/01/2025121206015Open ↗
04/01/2025121206015Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
09/05/2023121206015Open ↗
11/20/2019140875550Open ↗
▸BISBPP: STREET TREES SITE PLAN1
02/07/2020140875550Open ↗
▸BISSTREET TREE SIGNOFF1
04/15/2025121206015Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
09/05/2023121206015Open ↗
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
04/01/2025121206015Open ↗
04/01/2025121206015Open ↗
02/22/2022121206015Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
04/01/2025121206015Open ↗
04/01/2025121206015Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00221476-I1Open ↗
08/13/2026M00229900-I1Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
04/01/2025121206015Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
04/01/2025121206015Open ↗
▸BISLIGHTING IN DWELLING UNITS1
04/01/2025121206015Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
04/01/2025121206015Open ↗
▸BISELECTRIC MOTORS1
04/01/2025121206015Open ↗
▸BISLIGHTING CONTROLS1
04/01/2025121206015Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
04/01/2025121206015Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
04/15/2025121206015Open ↗
▸BISEXTERIOR LIGHTING POWER1
04/01/2025121206015Open ↗
▸BISFENESTRATION AIR LEAKAGE1
04/01/2025121206015Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00221476-I1Open ↗
▸Inspections & Test Reports27
▸BISTECHNICAL REPORT: RESPONSIBILITY6
04/03/2025121206015Open ↗
09/05/2023121206015Open ↗
02/22/2022121206015Open ↗
Showing 3 of 6 on file for this type
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY4
04/01/2025121206015Open ↗
04/01/2025121206015Open ↗
04/01/2025121206015Open ↗
Showing 3 of 4 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)4
04/01/2025121206015Open ↗
04/01/2025121206015Open ↗
04/01/2025121206015Open ↗
Showing 3 of 4 on file for this type
▸BISFOOTING AND FOUNDATION INSPECTION3
04/01/2025121206015Open ↗
04/01/2025121206015Open ↗
04/01/2025121206015Open ↗
▸BISCONCRETE - CAST-IN-PLACE3
04/01/2025121206015Open ↗
04/01/2025121206015Open ↗
04/01/2025121206015Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF2
06/30/2025121206015Open ↗
09/05/2023121206015Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
04/03/2025121206015Open ↗
▸BISSOIL REPORT1
01/19/2022121206015Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
11/19/2025121206015Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
02/22/2022121206015Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
09/05/2023121206015Open ↗
▸Approvals, Objections & Sign-offs17
▸BISLETTERS - SUPPORTING DOCUMENTATION7
08/17/2025123917529Open ↗
08/17/2025123917529Open ↗
08/17/2025123917529Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
04/03/2025121206015Open ↗
04/02/2025121206015Open ↗
03/12/2025121206015Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER2
05/09/2024121206015Open ↗
05/07/2024121206015Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)1
09/23/2025121206015Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
05/28/2025140875550Open ↗
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
11/04/2019121206015Open ↗
▸Cost, Insurance & Ownership5
▸BISPROJECT-SPECIFIC GL INSURANCE4
05/09/2024121206015Open ↗
05/07/2024121206015Open ↗
09/12/2023121206015Open ↗
Showing 3 of 4 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
05/07/2024121206015Open ↗
▸Filing & Intake Forms17
▸BISADDITIONAL INFORMATION11
10/08/2025121206015Open ↗
07/08/2025121206015Open ↗
04/22/2025121206015Open ↗
Showing 3 of 11 on file for this type
▸BISBOROUGH INTAKE FORM3
05/09/2024121206015Open ↗
05/07/2024121206015Open ↗
09/12/2023121206015Open ↗
▸BISEFILING COVER SHEET2
05/13/2025123917529Open ↗
09/19/2019121206015Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/20/2019140875550Open ↗
▸Other Documents8
▸BISPRELIMINARY2
04/01/2025121206015Open ↗
04/01/2025121206015Open ↗
▸BISPLOT DIAGRAM2
08/17/2025123917529Open ↗
09/09/2019121206015Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
04/01/2025121206015Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
11/20/2019140875550Open ↗
▸DOB NOWWaiver Document1
08/13/2026M00436756-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/15/2026M00221190-S2Open ↗