1910Year Built
2Stories
A5Building Class
R5BZoning
1,020 sfGross Floor Area
1Units
One family attached or semi-detached · 944 sf lot · 1.08 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/15/2023$1.3M—SIBLINGS GATHERING PLACE, LLC → Private party$1,299/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
N/A304/25/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CNS CONSTRUCTION INCGeneral Contractor303/21/2026
RIVIERA ELECTRIC CORPElectrical103/22/2026
KATAN P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AR ARCHITECT P.C.1171304/25/2025
NORMAN C. LOK818204/25/2025
Building Lifecycle
All (63)Filed (3)Permit Issued (2)Signed Off (2)Inspection (2)Objection (24)Special Inspection (30)
06/25/2025
Signed off — Alteration
RENOVATION OF EXISTING. NO CHANGE TO EGRESS OR OCCUPANCY.
B00917561-I1
06/25/2025
Signed off — Alteration
INSTALL NEW PLUMBING FIXTURES AS PER PLAN. CAP EXISTING GAS SERVICES. THERE IS NO CHANGE OF USE, EGRESS, OR OCCUPANCY FILED UNDER THIS PLAN.
B00916169-I1
04/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ANGEL ROJAS
04/29/2025
Special inspection requirement — Structural Steel - Details
NORMAN LOK
04/29/2025
Special inspection requirement — Heating Systems
ANGEL ROJAS
04/29/2025
Special inspection requirement — Masonry
ANGEL ROJAS
04/29/2025
Special inspection requirement — Mechanical Systems
ANGEL ROJAS
04/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGEL ROJAS
04/29/2025
Special inspection requirement — Final
ANGEL ROJAS
04/29/2025
Special inspection requirement — Energy Code Compliance Inspections
ANGEL ROJAS
04/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
ANGEL ROJAS
04/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
ANGEL ROJAS
04/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ANGEL ROJAS
04/29/2025
Special inspection requirement — Lighting in dwelling units
ANGEL ROJAS
04/29/2025
Special inspection requirement — Air barrier - visual inspection
ANGEL ROJAS
04/29/2025
Special inspection requirement — Maintenance information
ANGEL ROJAS
04/29/2025
Special inspection requirement — Protection of exposed foundation insulation
ANGEL ROJAS
04/29/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
ANGEL ROJAS
04/29/2025
Special inspection requirement — Metering
ANGEL ROJAS
04/29/2025
Special inspection requirement — Duct leakage testing, insulation and design
ANGEL ROJAS
04/29/2025
Special inspection requirement — Fenestration areas
ANGEL ROJAS
04/29/2025
Special inspection requirement — Fenestration air leakage
ANGEL ROJAS
04/29/2025
Special inspection requirement — Insulation placement and R values
ANGEL ROJAS
04/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
ANGEL ROJAS
04/25/2025
Filed — Alteration
RENOVATION OF EXISTING. NO CHANGE TO EGRESS OR OCCUPANCY.
B00917561-P1
04/24/2025
Special inspection requirement — Protection of exposed foundation insulation
ANGEL ROJAS
04/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
ANGEL ROJAS
04/24/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
ANGEL ROJAS
04/24/2025
Special inspection requirement — Maintenance information
ANGEL ROJAS
04/24/2025
Special inspection requirement — Metering
ANGEL ROJAS
04/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
ANGEL ROJAS
04/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ANGEL ROJAS
04/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGEL ROJAS
06/19/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/13/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/18/2024
Permit issued — Plumbing
B00916169-I1-PL
11/14/2023
Permit issued — Structural
B00917561-I1-GC-CX
10/19/2023
Objection resolved — Addressed
10/09/2023
Objection resolved — Addressed
10/09/2023
Objection resolved — Addressed
10/04/2023
Objection raised — Scope
10/04/2023
Objection raised — Scope
10/04/2023
Objection raised — Other
10/02/2023
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AS PER PLAN. CAP EXISTING GAS SERVICES. THERE IS NO CHANGE OF USE, EGRESS, OR OCCUPANCY FILED UNDER THIS PLAN.
B00916169-I1
09/15/2023
Objection resolved — Addressed
09/15/2023
Objection resolved — Addressed
09/11/2023
Objection raised — Other
08/28/2023
Objection resolved — Addressed
08/28/2023
Objection resolved — Addressed
08/28/2023
Objection resolved — Addressed
08/28/2023
Objection resolved — Addressed
08/28/2023
Objection resolved — Addressed
08/28/2023
Objection resolved — Addressed
08/24/2023
Objection resolved — Addressed
08/23/2023
Objection raised — Inspections
08/23/2023
Objection raised — Other
08/23/2023
Objection raised — Scope
08/23/2023
Objection raised — Cost
08/23/2023
Objection raised — Structural
08/23/2023
Objection raised — Other
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offKATAN P & H INC01/18/2024
DOB NOWStructuralSigned-offCNS CONSTRUCTION INC11/14/2023
2 projects · most recent 08/09/2024
General Wiring
FiledStatusContractorScope
08/09/2024CompleteRIVIERA ELECTRIC CORPGeneral Wiring
05/22/2023CompleteKINGS ELECTRIC CO., INC.1 meters
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/19/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
04/29/2025Structural Stability – Alterations of existing buildingsANGEL ROJASspecial
04/29/2025Structural Steel - DetailsNORMAN LOKspecial
04/29/2025Heating SystemsANGEL ROJASspecial
04/29/2025MasonryANGEL ROJASspecial
04/29/2025Mechanical SystemsANGEL ROJASspecial
04/29/2025Fire-Resistant Penetrations and JointsANGEL ROJASspecial
04/29/2025FinalANGEL ROJASprogress
04/29/2025Energy Code Compliance InspectionsANGEL ROJASprogress
04/29/2025Fire-Resistance Rated ConstructionANGEL ROJASprogress
04/29/2025HVAC-R and service water heating system controlsANGEL ROJASenergy_progress
04/29/2025HVAC-R and service water piping design and insulationANGEL ROJASenergy_progress
04/29/2025Lighting in dwelling unitsANGEL ROJASenergy_progress
04/29/2025Air barrier - visual inspectionANGEL ROJASenergy_progress
04/29/2025Maintenance informationANGEL ROJASenergy_progress
04/29/2025Protection of exposed foundation insulationANGEL ROJASenergy_progress
04/29/2025Fenestration and door U-factor and product ratingsANGEL ROJASenergy_progress
04/29/2025MeteringANGEL ROJASenergy_progress
04/29/2025Duct leakage testing, insulation and designANGEL ROJASenergy_progress
04/29/2025Fenestration areasANGEL ROJASenergy_progress
04/29/2025Fenestration air leakageANGEL ROJASenergy_progress
04/29/2025Insulation placement and R valuesANGEL ROJASenergy_progress
04/29/2025HVAC-R and service water heating equipmentANGEL ROJASenergy_progress
04/24/2025Protection of exposed foundation insulationANGEL ROJASenergy_progress
04/24/2025HVAC-R and service water heating equipmentANGEL ROJASenergy_progress
04/24/2025Fenestration and door U-factor and product ratingsANGEL ROJASenergy_progress
Latest 25 of 50.
▾Documents — 58 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/27/2026B00917561-I1Request digital key ↗
08/27/2026B00917561-P1Request digital key ↗
08/15/2026B00916169-I1Request digital key ↗
▸Seals & Professional Certifications53
▸DOB NOWProgress Inspector Seal & Signature37
08/31/2026B00916169-I1Open ↗
08/31/2026B00916169-I1Open ↗
08/31/2026B00916169-I1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
08/31/2026B00916169-I1Open ↗
08/25/2026B00917561-I1Open ↗
08/25/2026B00917561-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026B00917561-P1Open ↗
08/27/2026B00917561-I1Open ↗
08/13/2026B00916169-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00916169-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/27/2026B00917561-I1Open ↗