← Back
BuildNYC
Elevator apt, semi-fireproof without stores
1681 EASTBURN AVENUE
BRONX · BIN 2007402
💬 Discuss this project
1930Year Built
4.5Stories
D1Building Class
R8Zoning
7,071 sfGross Floor Area
17Units
Rent Stabilized0 Active Violations
Elevator apt, semi-fireproof without stores · Owner of record: 1681 Eastburn · 2,375 sf lot · 2.98 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofLefko Capital Group90p · 1 filing · 20 docs
PenthouseLefko Capital Group121p · 1 filing · 20 docs
Floor 4Lefko Capital Group120p · 1 filing · 20 docs
Floor 3Lefko Capital Group117p · 1 filing · 20 docs
Floor 2Lefko Capital Group122p · 1 filing · 20 docs
Floor 1Lefko Capital Group120p · 1 filing · 20 docs
CellarLefko Capital Group122p · 1 filing · 20 docs
Site & exteriorLefko Capital Group154p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Lefko Capital Group1207/08/2026
1681 Eastburn103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/18/2021$851K—Private party → 1681 EASTBURN LLC$120/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Chosen MEP305/02/2023
Adb Associates512/06/2022
SH Engineering711/30/2022
FL&M Engineering Design & Inspection106/28/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC Design File1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Skyward DevelopersGeneral Contractor1207/08/2026
Manhattan D EnterprisesScaffold603/21/2026
Skyward DevelopersScaffold407/08/2026
Skyward Developersspecialty_contractor303/21/2026
Mpi PlumbingPlumbing207/08/2026
Solas ElectricalElectrical103/22/2026
Prime Piping & HeatingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services56161505/02/2023
Building Lifecycle
07/04/2024
§ 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY…
HPD violation · closed
07/04/2024
§ 27-2010, 2011, 2012 ADM code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the household garbage at building…
HPD violation · closed
05/10/2024
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
HPD violation · closed
12/19/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/12/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
137 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offYG Services04/26/2023
DOB NOWSprinklersSigned-offAmb Mechanical03/02/2023
DOB NOWGeneral ConstructionPermit IssuedSkyward Developers02/08/2023
DOB NOWConstruction FenceSigned-offSkyward Developers02/06/2023
DOB NOWSidewalk ShedSigned-offManhattan D Enterprises06/28/2022
DOB NOWSidewalk ShedSigned-offManhattan D Enterprises06/28/2022
DOB NOWPlumbingSigned-offYG Services04/27/2022
DOB NOWFoundationSigned-offSkyward Developers03/09/2022
DOB NOWStructuralSigned-offSkyward Developers03/08/2022
DOB NOWGeneral ConstructionPermit IssuedSkyward Developers02/24/2022
DOB NOWGeneral ConstructionPermit IssuedSkyward Developers02/17/2022
DOB NOWMechanical SystemsSigned-offSkyward Developers02/09/2022
DOB NOWConstruction FenceSigned-offSkyward Developers02/04/2022
DOB NOWGeneral ConstructionPermit IssuedSkyward Developers02/02/2022
1 project · most recent 05/02/2023
Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScope
05/02/2023Permit IssuedSkyward DevelopersAssociated Ducts and Piping, Heating Systems, Ventilation Systems
1 project · most recent 05/02/2023
Sprinkler System
FiledStatusContractorScope
05/02/2023Signed-offPrime Piping & HeatingSprinkler System
1 project · most recent 05/02/2023
Storm Water/Sanitary
FiledStatusContractorScope
05/02/2023Signed-offYG ServicesStorm, Water/Sanitary
2 projects · most recent 06/04/2023
General Wiring
FiledStatusContractorScope
06/04/2023CompleteM.R. Electrical ServiceGeneral Wiring
06/22/2022CompleteSolas Electrical—
1 project · most recent 05/02/2023
Concrete Masonry
FiledStatusContractorScope
05/02/2023Signed-offYG ServicesConcrete, Masonry
1 project · most recent 05/02/2023
Fence
FiledStatusContractorScope
05/02/2023Signed-offYG ServicesFence
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
12/19/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
12/12/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
06/20/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/15/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/11/2023Pass-Final CND-Occupancy InspectionPassView ↗
04/27/2023Pass-Final PL - UndergroundPassView ↗
03/31/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/09/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/03/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 125
DateRequirementInspectorRole
05/03/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
05/03/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
05/03/2023Maintenance informationFAHAD FATEHenergy_progress
05/03/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
05/03/2023Sprinkler SystemsFAHAD FATEHspecial
05/03/2023Post-installed AnchorsFAHAD FATEHspecial
05/03/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/03/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
05/01/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
05/01/2023Maintenance informationFAHAD FATEHenergy_progress
05/01/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
05/01/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
05/01/2023Sprinkler SystemsFAHAD FATEHspecial
05/01/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
05/01/2023Post-installed AnchorsFAHAD FATEHspecial
05/01/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
12/07/2022Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
12/07/2022Fenestration air leakageFAHAD FATEHenergy_progress
12/07/2022HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
12/07/2022Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
12/07/2022Fenestration areasFAHAD FATEHenergy_progress
12/07/2022Maintenance informationFAHAD FATEHenergy_progress
12/07/2022Electric vehicle service equipment requirementsFAHAD FATEHenergy_progress
12/07/2022MasonryFAHAD FATEHspecial
12/07/2022Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
Latest 25 of 125.
215 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account