← Back
BuildNYC
Two family frame
1681 REMSEN AVENUE
BROOKLYN · Canarsie · BIN 3234173
💬 Discuss this project
1960Year Built
1.67Stories
B2Building Class
R4-1Zoning
1,630 sfGross Floor Area
2Units
0 Active Violations 2 old, status unconfirmed ▸FDNY Report ↗
Two family frame · 4,000 sf lot · 0.41 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Cellar3p · 1 filing · 18 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Nyron Hall Engineering410/24/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rose-Starr Construction EnhanGeneral Contractor107/08/2026
Prime Piping & HeatingPlumbing107/08/2026
Building Lifecycle
09/20/2024
Permit expired, never signed off — Plumbing
The city's record still shows this permit as issued, with no sign-off on its filing
B00804019-S1-PL
04/21/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/21/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/11/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/01/2023
Objection resolved — Addressed
29 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPrime Piping & Heating09/20/2023
DOB NOWGeneral ConstructionPermit IssuedRose-Starr Construction Enhan06/27/2023
1 project · most recent 10/24/2023
Gas Water/Sanitary
FiledStatusContractorScope
10/24/2023Permit IssuedPrime Piping & HeatingGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/21/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/21/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/11/2023Fail-Final General Construction Non-Directive 14FailView ↗
10/05/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/28/2023No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
17 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account