← Back
BuildNYC
Walk-up apt, over six families with stores
1683 1ST AVENUE
MANHATTAN · BIN 1050051
💬 Discuss this project
1925Year Built
4Stories
C7Building Class
R10Zoning
—Gross Floor Area
9Units
0 Active Violations 2 likely answered 1 old, status unconfirmed ▸
Walk-up apt, over six families with stores · Owner of record: 1683 First Realty · 3.16 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Roof7-11 Store, Douglas McGee Orpheus ManagementUnder Construction5p · 2 filings · 15 docs
Floor 4Douglas McGee Orpheus Management1 filing · 9 docs
Floor 3
Floor 2
Floor 1
Cellar7-11 StoreUnder Construction2p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1683 First Realty4103/22/2026
1498 Third Realty1603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kems Engineering and Construction207/08/2026
M Just Architecture110/29/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Just Architecture203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kenneth Fisk ElectricElectrical203/21/2026
Casella ConstructionGeneral Contractor203/21/2026
FVC ElectricElectrical103/21/2026
TumenGeneral Contractor107/29/2026
Marquis P & H CoPlumbing107/25/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EC Special Inspections8355207/08/2026
Hansen Engineering8174110/29/2021
Building Lifecycle
All (38)Filed (3)Permit Issued (3)Signed Off (1)Violation (22)Special Inspection (9)
07/28/2026
Permit issued — Mechanical Systems
M01407860-I1-MS
07/24/2026
Permit issued — Plumbing
M01407860-S1-PL
07/08/2026
Filed — Alteration
DIRECT REPLACEMENT OF TWO (2) SPLIT HVAC SYSTEMS.
M01407860-S1
07/08/2026
Filed — Alteration
DIRECT REPLACEMENT OF TWO (2) SPLIT HVAC SYSTEMS.
M01407860-I1
04/25/2022
Signed off — Alteration
General Construction to install beam at fourth floor and Repair parapet and Bulkhead at roof.
M00555148-I1
02/15/2022
Violation issued (HPD, closed)
A
11/17/2021
Permit issued — Structural
M00555148-I1-GC-CX
10/29/2021
Filed — Alteration
General Construction to install beam at fourth floor and Repair parapet and Bulkhead at roof.
M00555148-I1
10/13/2021
Special inspection requirement — Structural Steel - Welding
Ryan Hansen
10/12/2021
Special inspection requirement — Structural Steel - Details
Ryan Hansen
07/09/2021
Special inspection requirement — Energy Code Compliance Inspections
Ryan Hansen
07/09/2021
Special inspection requirement — Fire-Resistance Rated Construction
Ryan Hansen
07/09/2021
Special inspection requirement — Fenestration areas
Ryan Hansen
07/09/2021
Special inspection requirement — Air barrier - visual inspection
Ryan Hansen
07/09/2021
Special inspection requirement — Fenestration air leakage
Ryan Hansen
07/09/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
Ryan Hansen
07/09/2021
Special inspection requirement — Final
Ryan Hansen
05/20/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/05/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/08/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/15/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/10/2015
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
03/03/2015
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
10/31/2014
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
10/22/2014
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
09/24/2014
Violation issued (ECB, closed)
Unknown
09/24/2014
Violation issued (ECB, closed)
Construction
09/24/2014
Violation issued (ECB, closed)
Construction
05/15/2014
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
12/12/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/12/2006
Violation issued (ECB, closed)
Construction
04/29/2004
Violation issued (ECB, closed)
Construction
04/29/2004
Violation issued (ECB, closed)
Construction
02/07/2004
Violation issued (ECB, closed)
Public Assembly
11/25/2003
Violation issued (ECB, closed)
Public Assembly
04/05/2003
Violation issued (ECB, closed)
Public Assembly
10/19/2002
Violation issued (ECB, closed)
Construction
04/05/1990
Violation issued (ECB, closed)
Public Assembly
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedTumen07/28/2026
DOB NOWPlumbingPermit IssuedMarquis P & H Co07/24/2026
DOB NOWStructuralSigned-offCasella Construction11/17/2021
BISPLISSUEDL&J PLG & Heating Co of NY01/16/2015
BISOTISSUEDSato Construction Co01/15/2015
BIS—ISSUEDAmerican Sign & Electrical Con12/29/2014
BISOTISSUEDSpecial Graphics & Maintenance10/17/2014
BISEQISSUEDRock Group NY07/31/2014
BISOTISSUEDSato Construction Co05/30/2014
BISPLISSUEDMPC Plumbing & Heating12/06/2013
BISSPISSUEDSafety Fire Sprinkler12/03/2013
BISPLISSUEDShor Plumbing & Heating08/15/2013
BISSPISSUEDSafety Fire Sprinkler09/20/2012
BISPLISSUEDMaxwell Plumbing Mechanical09/04/2012
BISOTISSUEDShico Construction08/23/2012
BISMHISSUEDGood-Will Mechanical07/06/2012
BISMHISSUEDGood-Will Mechanical06/08/2012
BISOTISSUEDLeverock Enterprises06/04/2012
BISOTISSUEDLeverock Enterprises05/09/2012
BISPLISSUEDMPC Plumbing & Heating05/08/2012
BISPLISSUEDMaxwell Plumbing Mechanical04/20/2012
BISOTISSUEDShico Construction04/12/2012
BISOTISSUEDGemstar Construction03/20/2012
BISOTISSUEDNorth Shore Neon Sign01/18/2012
BISPLISSUEDMaxwell Plumbing Mechanical08/28/2006
BISPLRE-ISSUEDMaxwell Plumbing Mechanical03/20/2006
BISPLRE-ISSUEDMaxwell Plumbing Mechanical03/20/2006
BISFPISSUEDNY Busin Fire System08/03/2005
BISOTISSUEDShico02/11/2005
BISPLISSUEDUnlimited PLG Solutions02/11/2005
BISPLISSUEDUnlimited PLG Solutions02/08/2005
BISOTISSUEDShico02/08/2005
BIS—ISSUEDThe Deacon Group01/09/1995
1 project · most recent 07/08/2026
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
07/08/2026Permit IssuedTumenAir Conditioning Systems, Heating Systems
Cooling
Carrier 26SPA636W023 36,000 BTU · Heat Pump Outdoor ×1
38AXZN08A0M5-0A1C0 90,000 BTU · Heat Pump Outdoor ×1
Heating
Carrier CAAMP3617AMA 60,000 BTU · Furnace ×1
Reznor F-1/ SC-100 100,000 BTU · Furnace ×1
1 project · most recent 07/08/2026
Gas
FiledStatusContractorScope
07/08/2026Permit IssuedMarquis Plumbing & Heating CoGas
1 project · most recent 02/14/2021
General Wiring
FiledStatusContractorScope
02/14/2021CompleteFVC ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
10/13/2021Structural Steel - WeldingRyan Hansenspecial
10/12/2021Structural Steel - DetailsRyan Hansenspecial
07/09/2021Energy Code Compliance InspectionsRyan Hansenprogress
07/09/2021Fire-Resistance Rated ConstructionRyan Hansenprogress
07/09/2021Fenestration areasRyan Hansenenergy_progress
07/09/2021Air barrier - visual inspectionRyan Hansenenergy_progress
07/09/2021Fenestration air leakageRyan Hansenenergy_progress
07/09/2021Fenestration and door U-factor and product ratingsRyan Hansenenergy_progress
07/09/2021FinalRyan Hansenprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
7-11 StoreRetailRoof
Project M01407860 Alteration · Permit Entire · 07/08/2026
Douglas McGee Orpheus ManagementResidentialFloor 4, Roof
Project M00555148 Alteration · LOC Issued · 10/29/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 306 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
09/03/2026M00555148-I1Request digital key ↗
08/16/2026M01407860-I1Request digital key ↗
08/16/2026M01407860-S1Request digital key ↗
▸Applications & Permits62
▸BISPLAN / WORK APPROVAL APPLICATION44
10/24/2023121014017Open ↗
10/23/2023121014017Open ↗
10/19/2023121014017Open ↗
Showing 3 of 44 on file for this type
▸BISWORK PERMIT APPLICATION18
01/29/2015122150910Open ↗
01/29/2015122006248Open ↗
01/06/2015122137053Open ↗
Showing 3 of 18 on file for this type
▸Seals & Professional Certifications72
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION37
08/31/2020121014017Open ↗
08/31/2020121014017Open ↗
04/29/2020121014017Open ↗
Showing 3 of 37 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM13
09/25/2012121383948Open ↗
Showing 1 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
12/15/2014122137053Open ↗
08/06/2014122086232Open ↗
05/15/2014122006248Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
12/15/2014122137053Open ↗
08/06/2014122086232Open ↗
05/15/2014122006248Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/16/2026M01407860-I1Open ↗
08/16/2026M01407860-S1Open ↗
08/13/2026M00555148-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026M00555148-I1Open ↗
08/28/2026M00555148-I1Open ↗
08/28/2026M00555148-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026M00555148-I1Open ↗
08/28/2026M00555148-I1Open ↗
▸Trade Schedules & Equipment30
▸BISSELF-CERT PLUMBING NOTICE14
03/31/2015122150910Open ↗
03/23/2015122150910Open ↗
12/27/2013121014017Open ↗
Showing 3 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING7
03/19/2013121014017Open ↗
03/18/2013121014017Open ↗
09/25/2012121383948Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
11/08/2023121014017Open ↗
10/31/2023121014017Open ↗
▸BISEQUIPMENT USE PERMITS2
11/08/2023121014017Open ↗
10/31/2023121014017Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
12/16/2015121014017Open ↗
12/02/2015121014017Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
10/05/2023121014017Open ↗
▸BISSPRINKLER SYSTEMS1
10/02/2023121014017Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
10/05/2023121014017Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
03/16/2015122330343Open ↗
▸Environmental & Asbestos15
▸BISASBESTOS-CERTIFICATION (DEP ACP5)8
07/03/2012121134405Open ↗
07/03/2012121134405Open ↗
07/09/2015122364128Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/16/2026M01407860-I1Open ↗
08/16/2026M01407860-S1Open ↗
08/13/2026M00555148-I1Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance23
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
08/31/2020121014017Open ↗
08/31/2020121014017Open ↗
02/14/2020121014017Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections2
07/03/2012121134405Open ↗
07/03/2012121134405Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
06/24/2016122006248Open ↗
08/10/2015122150910Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
10/19/2023121014017Open ↗
10/19/2023121014017Open ↗
▸BISINTERIOR LIGHTING POWER1
10/05/2023121014017Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/10/2023121014017Open ↗
▸BISLIGHTING CONTROLS1
10/05/2023121014017Open ↗
▸BIS* HVAC INSULATION AND SEALING1
10/05/2023121014017Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00555148-I1Open ↗
▸Inspections & Test Reports7
▸BISFOOTING AND FOUNDATION INSPECTION1
10/02/2023121014017Open ↗
▸BIS* EXIT SIGNS1
10/12/2023121014017Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
10/02/2023121014017Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/19/2023121014017Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
10/02/2023121014017Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
10/02/2023121014017Open ↗
▸BISMECHANICAL SYSTEMS1
10/05/2023121014017Open ↗
▸Approvals, Objections & Sign-offs26
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
10/31/2023122137053Open ↗
10/31/2023122137053Open ↗
10/31/2023121014017Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
03/16/2015122330343Open ↗
09/25/2012121383948Open ↗
07/03/2012121134405Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
03/16/2015122330343Open ↗
Showing 1 of 2 on file for this type
▸BISFINAL2
10/27/2023122137053Open ↗
10/05/2023121014017Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership23
▸BISCOST AFFIDAVIT21
10/11/2023121014017Open ↗
10/11/2023121014017Open ↗
06/24/2016122006248Open ↗
Showing 3 of 21 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
10/27/2023122137053Open ↗
10/12/2023121014017Open ↗
▸Filing & Intake Forms39
▸BISBOROUGH INTAKE FORM16
08/31/2020121014017Open ↗
04/29/2020121014017Open ↗
03/23/2020121014017Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING COVER SHEET15
07/09/2015122364128Open ↗
03/16/2015122330343Open ↗
12/15/2014122137053Open ↗
Showing 3 of 15 on file for this type
▸BISADDITIONAL INFORMATION8
08/31/2020121014017Open ↗
02/18/2020122086232Open ↗
02/14/2020121014017Open ↗
Showing 3 of 8 on file for this type
▸Other Documents5
▸BISPLOT DIAGRAM2
03/16/2015122330343Open ↗
Showing 1 of 2 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
08/27/2012121134405Open ↗