💬 Discuss this project
1912Year Built
5Stories
C1Building Class
R7-1Zoning
21,320 sfGross Floor Area
29Units
Rent Stabilized9 Active Violations 2 likely answered ▸FISP: No Report Filed
Over six families without stores · Owner of record: 1686 W Realty · 4,954 sf lot · 4.3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofSteam boiler replacement3p · 1 filing · 4 docs
Floor 6Pipe scaffold installation3p · 1 filing · 4 docs
Floor 5Pipe scaffold installation6p · 2 filings · 8 docs
Floor 4Pipe scaffold installation6p · 2 filings · 8 docs
Floor 3Pipe scaffold installation6p · 2 filings · 8 docs
Floor 2Pipe scaffold installation6p · 2 filings · 8 docs
Floor 1Pipe scaffold installation6p · 2 filings · 8 docs
CellarSteam boiler replacement8p · 3 filings · 12 docs
Basement4p · 1 filing · 4 docs
Sub-Basement2p · 1 filing · 4 docs
Site & exteriorHeavy duty sidewalk shed installationUnder Construction12p · 4 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1686 W Realty2107/08/2026
Blue SKY Estates907/08/2026
Association LLC 144-146 West 19th S607/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/31/2016$3.1M—1686 CLAY AVENUE CORP. → 1686 W Realty$145/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MSM Engineering Services112/20/2024
Rise Architecture109/13/2021
Ashraf102/26/2020
NS Engineers201/22/2020
Paul Perdek, Professional Engineering111/04/2019
Alberto Roman110/06/2019
KZ Engineering112/28/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Jack Jaffa & Associates303/21/2026
AE Design Solution203/21/2026
Youber Design603/21/2026
Synergy Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Silvercup Scaffolding IScaffold1007/08/2026
Lime Stone BuildersScaffold407/08/2026
Manhattan D EnterprisesScaffold407/08/2026
Lime Stone Buildersspecialty_contractor303/21/2026
Clean Tech MechanicalPlumbing207/08/2026
Alpha ScaffoldingScaffold207/08/2026
Dumbo DemoltionGeneral Contractor103/21/2026
Lime Stone BuildersGeneral Contractor107/08/2026
Fried ElectricElectrical103/22/2026
Built-Rite-HeatingGeneral Contractor111/21/2002
DMT Plumbing & HeatingPlumbing108/08/2016
Manu A ConstructionGeneral Contractor112/06/2016
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Biz Designs6312109/13/2021
Ashraf1973102/26/2020
NS Engineers1442101/22/2020
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
08/05/2026
Boiler inspection report filed
Initial · defects found · Accepted
04/30/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
01/06/2026
Failure to provide unobstructed exit passageway. Observed multiple objects stored on fire escapes at exposure three. Remedy: remove objects and…
ECB violation · closed
01/06/2026
Failure to maintain building exterior facade and appurtenances as per NYC administrative code noted at time of inspection observed code. Noted at…
ECB violation · closed
239 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedAlpha Scaffolding12/16/2025
DOB NOWSidewalk ShedPermit IssuedAlpha Scaffolding12/23/2024
DOB NOWGeneral ConstructionSigned-offLime Stone Builders10/26/2021
DOB NOWSupported ScaffoldSigned-offManhattan D Enterprises06/04/2021
DOB NOWConstruction FenceSigned-offLime Stone Builders02/22/2021
DOB NOWMechanical SystemsSigned-offLime Stone Builders06/26/2020
DOB NOWBoiler EquipmentPermit IssuedClean Tech Mechanical06/22/2020
DOB NOWPlumbingSigned-offClean Tech Mechanical06/18/2020
DOB NOWSidewalk ShedPermit IssuedSilvercup Scaffolding I12/09/2019
DOB NOWSupported ScaffoldSigned-offManhattan D Enterprises11/06/2019
DOB NOWConstruction FenceSigned-offLime Stone Builders10/24/2019
DOB NOWSidewalk ShedPermit IssuedSilvercup Scaffolding I08/08/2018
DOB NOWSidewalk ShedPermit IssuedSilvercup Scaffolding I04/13/2018
DOB NOWSidewalk ShedPermit IssuedSilvercup Scaffolding I01/23/2018
BISOTISSUEDLime Stone Builders06/12/2020
BISMHISSUEDLime Stone Builders06/12/2020
BISMHISSUEDLime Stone Builders12/23/2019
BISOTISSUEDLime Stone Builders12/10/2019
BISPLISSUEDClean Tech Mechanical09/04/2019
BISOTISSUEDDumbo Demoltion02/26/2018
BISEQISSUEDManu A Construction12/06/2016
BISPLISSUEDDMT Plumbing & Heating08/08/2016
BISOTISSUEDBuilt-Rite-Heating11/21/2002
BISFBISSUEDBuilt Rite Heating05/24/1993
5 projects · most recent 12/21/2024
General Wiring
FiledStatusContractorScope
12/21/2024Permit IssuedRichard Neu—
02/03/2022Permit IssuedMartin DorkinGeneral Wiring
01/03/2020CompleteCounty Electrical Contractor I—
09/03/2019CompleteFried ElectricGeneral Wiring
01/18/2018CompleteV. Vass Electric—
2 projects · most recent 12/20/2024
Sidewalk Shed
FiledStatusContractorScope
12/20/2024Permit IssuedAlpha ScaffoldingSidewalk Shed
12/28/2017Permit IssuedSilvercup Scaffolding ISidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
10/25/2019FinalPaul Perdekprogress
09/24/2019FinalALBERTO ROMANprogress
118 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account