← Back
BuildNYC
Three families
1686 GRAND AVENUE
BRONX · BIN 2008493
💬 Discuss this project
1920Year Built
2Stories
C0Building Class
R7-1Zoning
3,939 sfGross Floor Area
3Units
Rent Stabilized5 Active Violations ▸FDNY Report ↗
Three families · Owner of record: 1686 Grand Ave · 3,300 sf lot · 1.19 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof47p · 1 filing · 20 docs
Floor 244p · 1 filing · 20 docs
Floor 143p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
Basement47p · 1 filing · 20 docs
Site & exterior10p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MSH Equities2407/08/2026
1686 Grand Ave103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/26/2024$1.1M—CML PROPERTIES, LLC → 1686 GRAND AVE LLC$279/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Vasilios Artemiou PE508/06/2024
Nikolai Katz Architect307/23/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Express Filing1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Builders Group USAGeneral Contractor307/08/2026
Prime Piping & HeatingPlumbing107/08/2026
Prime Piping & HeatingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616608/06/2024
Building Lifecycle
08/06/2026
Elevator Category 1 inspection report filed
03/08/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT LOWER SASH AT FIRE ESCAPE WINDOW IN THE 1st ROOM FROM EAST LOCATED…
HPD violation · closed
06/05/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
05/03/2025
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
X00987070-I1-GC
01/28/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
96 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBuilders Group USA05/17/2024
DOB NOWPlumbingSigned-offPrime Piping & Heating05/16/2024
DOB NOWSprinklersSigned-offAmb Mechanical05/16/2024
DOB NOWMechanical SystemsSigned-offBuilders Group USA05/15/2024
1 project · most recent 08/06/2024
Heating and Air Conditioning Systems
FiledStatusContractorScope
08/06/2024Permit IssuedBuilders Group USAHeating and Air Conditioning Systems
1 project · most recent 08/06/2024
Sprinkler System
FiledStatusContractorScope
08/06/2024Signed-offPrime Piping & HeatingSprinkler System
1 project · most recent 08/06/2024
Storm Water/Sanitary
FiledStatusContractorScope
08/06/2024Signed-offAmb MechanicalStorm, Water/Sanitary
1 project · most recent 11/14/2024
General Wiring
FiledStatusContractorScope
11/14/2024CompleteFried ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
01/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/09/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/27/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/23/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/19/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/09/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/25/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/03/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 83
DateRequirementInspectorRole
08/30/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/30/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
08/30/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
08/30/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
08/30/2024Maintenance informationFAHAD FATEHenergy_progress
08/30/2024Interior lighting powerFAHAD FATEHenergy_progress
08/30/2024Fenestration air leakageFAHAD FATEHenergy_progress
08/30/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
08/30/2024Fenestration areasFAHAD FATEHenergy_progress
08/30/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
08/30/2024MeteringFAHAD FATEHenergy_progress
08/08/2024Ventilation and air distribution systemFAHAD FATEHenergy_progress
08/08/2024Maintenance informationFAHAD FATEHenergy_progress
08/08/2024Duct leakage testing, insulation and designFAHAD FATEHenergy_progress
08/08/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
08/08/2024Permanent certificateFAHAD FATEHenergy_progress
08/08/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
08/08/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
08/08/2024FinalFAHAD FATEHprogress
08/08/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
08/08/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/08/2024Mechanical SystemsFAHAD FATEHspecial
08/08/2024Post-installed AnchorsFAHAD FATEHspecial
08/06/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
08/06/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
Latest 25 of 83.
48 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account