← Back
BuildNYC
Two family frame
169-02 HIGHLAND AVENUE
QUEENS · BIN 4210551
💬 Discuss this project
1920Year Built
2.5Stories
B2Building Class
R4AZoning
3,048 sfGross Floor Area
2Units
9 Active Violations 6 unresolved · 3 paperwork only ▸FDNY Report ↗
Two family frame · 3,366 sf lot · 0.91 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
CellarCellar ductless split AC unit legalization3 filings · 13 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/11/2019$1.3M—Private party → Private party$427/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KNF Services Crop311/02/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RCGA Architects403/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616211/02/2022
Building Lifecycle
10/27/2026
Occupancy contrary to that allowed by the DOB records . Noted : a set up of a physical therapy clinic at basement level with only 1 means of egress…
ECB violation · open
05/02/2023
Failure to maintain. Noted: observed at front and side yard of corner residential property a retaining wall that is leaning, bulging and vertical…
ECB violation · open
11/08/2022
Objection raised — Scope
11/08/2022
Objection resolved — Addressed
11/02/2022
Filed — Alteration
Q00755885-I1
23 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 11/02/2022
Air Conditioning Systems
FiledStatusContractorScope
11/02/2022——Air Conditioning Systems
1 project · most recent 12/16/2022
General Wiring
FiledStatusContractorScope
12/16/2022Permit IssuedElectrical Services & Cons GPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/11/2022Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/11/2022Energy Code Compliance InspectionsFAHAD FATEHprogress
06/11/2022Fire-Resistance Rated ConstructionFAHAD FATEHprogress
06/11/2022Mechanical SystemsFAHAD FATEHspecial
06/11/2022FinalFAHAD FATEHprogress
21 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account