← Back
Two family converted from one family
169 12 STREET
BROOKLYN · BIN 3022846
💬 Discuss this project
1899Year Built
3Stories
B3Building Class
R6BZoning
2,568 sfGross Floor Area
2Units
2 Open Violations 1 unresolved · 1 paperwork only ▸FDNY Report ↗
Two family converted from one family · 1,400 sf lot · 1.83 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
CellarUnder Construction2p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNER OF 169 12 ST103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RIKE TECH ASSOCIATES LLC204/10/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JULIAN ALBERTO GOMEZ103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NIFTY CONSTRUCTION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PINTO ENGINEERING CONSULT9110112/15/2025
Building Lifecycle
All (19)Filed (2)Permit Issued (1)Violation (6)Objection (6)Special Inspection (4)
04/16/2026
Permit issued — General Construction
B01333480-I1-GC
04/15/2026
Special inspection requirement — Concrete - Cast-In-Place
Rene Navarrete
04/15/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Rene Navarrete
04/10/2026
Filed — Alteration
PROPOSED: Interior renovation at cellar level, new bench footing, vapor barrier, new tiles, replace old metal columns with new 4" Column, new reinforced concrete spread footing. Lower the lavel of cellar 12". as per plans.
B01333480-P1
04/10/2026
Special inspection requirement — Concrete - Cast-In-Place
04/10/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
01/20/2026
Objection resolved — Addressed
01/14/2026
Objection resolved — Addressed
01/02/2026
Objection resolved — Addressed
12/19/2025
Objection raised — Structural
12/19/2025
Objection raised — Structural
12/19/2025
Objection raised — Structural
12/15/2025
Filed — Alteration
PROPOSED: Interior renovation at cellar level, new bench footing, vapor barrier, new tiles, replace old metal columns with new 4" Column, new reinforced concrete spread footing. Lower the lavel of cellar 12". as per plans.
B01333480-I1
03/05/2001
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/05/2001
Violation issued (ECB, open)
Quality of Life
01/10/2001
Violation issued (ECB, closed)
Construction
01/30/1997
Violation issued (ECB, closed)
Construction
12/29/1992
Violation issued (DOB, closed)
VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED
02/22/1990
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNIFTY CONSTRUCTION INC04/16/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
04/15/2026Concrete - Cast-In-PlaceRene Navarretespecial
04/15/2026Structural Stability – Alterations of existing buildingsRene Navarretespecial
04/10/2026Concrete - Cast-In-Place—special
04/10/2026Structural Stability – Alterations of existing buildings—special
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/19/2026B01333480-P1Request digital key ↗
08/19/2026B01333480-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/19/2026B01333480-P1Open ↗
08/13/2026B01333480-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026B01333480-I1Open ↗
08/26/2026B01333480-I1Open ↗