← Back
Limited service hotel, often national chain
Ramada
169 EMPIRE BOULEVARD · Name © OpenStreetMap contributors · BIN 3034498
💬 Discuss this project
2022Year Built
5Stories
H3Building Class
C8-2Zoning
24,541 sfGross Floor Area
79Units
0 Open ViolationsFDNY Report ↗
Limited service hotel, often national chain · Owner of record: EMPIRE PROSPECT LLC · 12,000 sf lot · 2.05 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Roof12p · 3 filings · 20 docs
Bulkhead4p · 2 filings · 20 docs
Floor 512p · 3 filings · 20 docs
Floor 411p · 3 filings · 20 docs
Floor 311p · 3 filings · 20 docs
Floor 211p · 3 filings · 20 docs
Floor 110p · 4 filings · 20 docs
Cellar11p · 3 filings · 20 docs
1 job · most recent 08/24/2026
Generators Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/24/2026Signed-offDASR CORPGenerators, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Hotpoint AH12H09D3B 9,300 BTU · Ptac ×370
AH12H12D3B 12,300 BTU · Ptac ×64
Cooper & Hunter CH-36MES-230VO 36,000 BTU · Condensing Unit ×12
Daikin DPS-007AHMG2 90,000 BTU · Vrf Outdoor ×6
Mitsubishi Electric MXZ-SM72TAM 96,000 BTU · Condensing Unit ×6
Ventilation
Greenheck G-080-VG 350 CFM · Exhaust Fan ×18
G-090-VG 500 CFM · Exhaust Fan ×6
G-095-VG 700 CFM · Exhaust Fan ×6
Mitsubishi Electric LGH-F470RVX-E 300 CFM · Erv ×6
Generators
Gillette SPJD-1000-3-2-2 100 kW · Generator ×6
5 jobs · most recent 08/20/2026
General Wiring
FiledStatusContractorScope
08/20/2026CompleteKWONG MING ELECTRIC INC—
11/07/2022CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
10/25/2022CompleteKWONG MING ELECTRIC INC—
09/30/2022CompleteHIGH QUALITY ELECTRIC OF—
09/08/2022Permit IssuedC & A ELECTRICAL CORP1 meters, 1 new_meters
1 job · most recent 05/21/2021
Concrete
FiledStatusContractorScope
05/21/2021Permit IssuedDASR CORPConcrete
Building Lifecycle
All (126)Filed (16)Permit Issued (22)Signed Off (9)Violation (33)Inspection (8)Objection (8)Special Inspection (30)
08/24/2026
Filed — Alteration
INSTALL NEW HVAC SYSTEM FOR 5 STORIES HOTEL WITH CELLAR FILED IN CONJUNCTION WITH NB#321590051. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
B00348474-P2
07/13/2026
Signed off — Alteration
Propose to install non-advertising sign. No change in use, egress, or occupancy.
B01159287-I1
07/13/2026
Signed off — Alteration
Propose to install non-advertising sign. No change in use, egress, or occupancy.
B01159288-I1
04/17/2025
Special inspection requirement — Emergency and Standby Power Systems (Generator)
FAHAD FATEH
04/17/2025
Special inspection requirement — Electrical motors
FAHAD FATEH
04/17/2025
Special inspection requirement — HVAC insulation and sealing
FAHAD FATEH
04/17/2025
Special inspection requirement — Shutoff dampers
FAHAD FATEH
04/17/2025
Special inspection requirement — HVAC and service water heating system controls
FAHAD FATEH
04/17/2025
Special inspection requirement — HVAC and service water heating equipment
FAHAD FATEH
04/17/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
04/17/2025
Special inspection requirement — Final
FAHAD FATEH
04/17/2025
Special inspection requirement — Mechanical Systems
FAHAD FATEH
04/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/17/2025
Signed off — Alteration
B00405341-I1
03/17/2025
Signed off — Alteration
B00406515-I1
03/14/2025
Signed off — Alteration
INSTALL NEW PLUMBING & SPRINKLER SYSTEM FOR 5-STORY HOTEL BUILDING IN CONJUNCTION WITH NB JOB#321590051.
B00407300-I1
03/14/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/06/2025
Signed off — Alteration
B00272627-I1
03/06/2025
Permit issued — Curb Cut
B00406515-I1-CC
03/06/2025
Permit issued — Curb Cut
B00405341-I1-CC
03/04/2025
Signed off — Alteration
B00405657-I1
03/03/2025
Special inspection requirement — Mechanical Systems
FAHAD FATEH
03/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/03/2025
Special inspection requirement — Emergency and Standby Power Systems (Generator)
FAHAD FATEH
03/03/2025
Special inspection requirement — Final
FAHAD FATEH
03/03/2025
Special inspection requirement — HVAC and service water heating system controls
FAHAD FATEH
03/03/2025
Special inspection requirement — HVAC and service water heating equipment
FAHAD FATEH
03/03/2025
Special inspection requirement — Shutoff dampers
FAHAD FATEH
03/03/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
03/03/2025
Special inspection requirement — HVAC insulation and sealing
FAHAD FATEH
03/03/2025
Special inspection requirement — Electrical motors
FAHAD FATEH
02/27/2025
Filed — Alteration
INSTALL NEW HVAC SYSTEM FOR 5 STORIES HOTEL WITH CELLAR FILED IN CONJUNCTION WITH NB#321590051. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
B00348474-P1
02/25/2025
Permit issued — Sign
B01159288-I1-SG
02/25/2025
Permit issued — Sign
B01159287-I1-SG
02/19/2025
Filed — Alteration
Propose to install non-advertising sign. No change in use, egress, or occupancy.
B01159287-I1
02/19/2025
Filed — Alteration
Propose to install non-advertising sign. No change in use, egress, or occupancy.
B01159288-I1
02/19/2025
Special inspection requirement — Final
Alfonso DElia
02/05/2025
Permit issued — Mechanical Systems
B00348474-I1-MS
01/10/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/07/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/20/2024
Special inspection requirement — HVAC and service water heating equipment
FAHAD FATEH
12/20/2024
Special inspection requirement — HVAC and service water heating system controls
FAHAD FATEH
12/20/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
12/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
12/20/2024
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
12/20/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
12/20/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
12/20/2024
Special inspection requirement — HVAC insulation and sealing
FAHAD FATEH
12/10/2024
Filed — Alteration
INSTALL NEW PLUMBING & SPRINKLER SYSTEM FOR 5-STORY HOTEL BUILDING IN CONJUNCTION WITH NB JOB#321590051.
B00407300-P2
12/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
12/05/2024
Permit issued — Sprinklers
B00407300-I1-EW-SP
11/29/2024
Permit issued — Plumbing
B00407300-I1-PL
11/26/2024
Permit issued — Structural
B00462590-I1-ST
07/03/2024
Signed off — Alteration
B08033424-I1
07/03/2024
Signed off — Alteration
B00665574-I1
05/13/2024
Permit issued — Construction Fence
B00405657-I1-FN
01/23/2024
Permit issued — Sidewalk Shed
B00665574-I1-SH
11/06/2023
Permit issued — Supported Scaffold
B08033424-I1-SF
10/04/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/04/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 126 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RATHOD2208/30/2026
850 FOURTH AVE ASSOCIATES LLC704/08/2026
DASR1903/22/2026
AMERISTAR CONSTRUCTION LL503/22/2026
169 EMPIRE CORP LUDMILLA203/22/2026
TRADEWINDS203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/30/2019$6.0M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MICHAEL KANG ARCHITECT P C603/21/2026
CNY ENGINEERING PC403/21/2026
S Y CONSULTING VIOLATIONS203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DASR CORPGeneral Contractor1007/08/2026
DYNAMIX SCAFFOLD GROUP LLGeneral Contractor807/08/2026
B T REFINISHING INCGeneral Contractor303/21/2026
PLUMB-IT MECHANICAL INCPlumbing207/08/2026
SERVICE SIGN ERECTORSScaffold207/08/2026
DOUG'S PLBG & HTG SERV COFire Protection207/08/2026
AMERISTAR CONSTRUCTION LLGeneral Contractor207/08/2026
ZONE PLUMBING & HEATING CPlumbing107/08/2026
KWONG MING ELECTRIC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616508/24/2026
LMW ENGINEERING GROUP LLC279105/21/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offDASR CORP03/06/2025
DOB NOWCurb CutSigned-offDASR CORP03/06/2025
DOB NOWSignSigned-offSERVICE SIGN ERECTORS CO02/25/2025
DOB NOWSignSigned-offSERVICE SIGN ERECTORS CO02/25/2025
DOB NOWMechanical SystemsSigned-offDASR CORP02/05/2025
DOB NOWSprinklersSigned-offDOUG'S PLBG & HTG SERV CO12/05/2024
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC11/29/2024
DOB NOWStructuralPermit IssuedDASR CORP11/26/2024
DOB NOWConstruction FenceSigned-offDASR CORP05/13/2024
DOB NOWSidewalk ShedSigned-offDYNAMIX SCAFFOLD GROUP LL01/23/2024
DOB NOWSupported ScaffoldSigned-offDYNAMIX SCAFFOLD GROUP LL11/06/2023
DOB NOWConstruction FenceSigned-offDASR CORP05/18/2023
DOB NOWPlumbingSigned-offDOUG'S PLBG & HTG SERV CO03/01/2023
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC02/24/2023
DOB NOWSidewalk ShedSigned-offDYNAMIX SCAFFOLD GROUP LL01/17/2023
DOB NOWSupported ScaffoldSigned-offDYNAMIX SCAFFOLD GROUP LL11/04/2022
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C08/02/2022
DOB NOWConstruction FenceSigned-offDASR CORP05/05/2022
DOB NOWSidewalk ShedSigned-offDYNAMIX SCAFFOLD GROUP LL01/20/2022
DOB NOWConstruction FenceSigned-offB T REFINISHING INC08/16/2021
DOB NOWConstruction FenceSigned-offAMERISTAR CONSTRUCTION LL03/29/2021
DOB NOWConstruction FenceSigned-offAMERISTAR CONSTRUCTION LL06/09/2020
BIS—ISSUEDDASR CORP07/25/2024
BIS—ISSUEDDASR CORP05/18/2023
BIS—ISSUEDDASR CORP04/20/2023
BIS—ISSUEDDASR CORP03/24/2022
BIS—ISSUEDAMERISTAR CONSTRUCTION LL11/19/2020
BISPLISSUEDPLUMBING, PLUMBING & PLUMBING C.03/14/2008
BISMHISSUEDAIRCRAFT AIR COND CORP10/11/2007
BISOTISSUEDPOLCON RENOVATION INC.06/07/2007
BISSPISSUEDHENRY TRAKTMAN LICENSED PLUMBER12/28/2004
BIS—ISSUEDIST NEW CONSTRUCITON CORP.12/10/2004
BISPLISSUEDMETROPOLITAN HEAT & POWER CO06/25/2004
BISEQISSUED1ST NEW WORLD CONSTRUCTION CORP.12/08/2003
BIS—ISSUEDIST NEW CONSTRUCITON CORP.12/08/2003
BISSPISSUEDSUNSET PLUMBING & FIRE PROTECTIO03/22/2001
BISPLISSUEDKAMAR MECHANICAL PLBG & HTG INC02/08/2001
BIS—ISSUEDNEW YORK CITY CORPN CORP.11/17/2000
BISPLISSUEDB H PLG HTNG CORP02/02/2000
BISOTISSUEDMORGAN WINDOWS DOOR REMOD CO01/27/2000
+ 3 more permits on file
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/14/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
01/10/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/07/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/25/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/09/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/09/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/28/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/28/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
04/17/2025Emergency and Standby Power Systems (Generator)FAHAD FATEHspecial
04/17/2025Electrical motorsFAHAD FATEHenergy_progress
04/17/2025HVAC insulation and sealing FAHAD FATEHenergy_progress
04/17/2025Shutoff dampersFAHAD FATEHenergy_progress
04/17/2025HVAC and service water heating system controls FAHAD FATEHenergy_progress
04/17/2025HVAC and service water heating equipment FAHAD FATEHenergy_progress
04/17/2025Maintenance informationFAHAD FATEHenergy_progress
04/17/2025FinalFAHAD FATEHprogress
04/17/2025Mechanical SystemsFAHAD FATEHspecial
04/17/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/03/2025Mechanical SystemsFAHAD FATEHspecial
03/03/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/03/2025Emergency and Standby Power Systems (Generator)FAHAD FATEHspecial
03/03/2025FinalFAHAD FATEHprogress
03/03/2025HVAC and service water heating system controls FAHAD FATEHenergy_progress
03/03/2025HVAC and service water heating equipment FAHAD FATEHenergy_progress
03/03/2025Shutoff dampersFAHAD FATEHenergy_progress
03/03/2025Maintenance informationFAHAD FATEHenergy_progress
03/03/2025HVAC insulation and sealing FAHAD FATEHenergy_progress
03/03/2025Electrical motorsFAHAD FATEHenergy_progress
02/19/2025FinalAlfonso DEliaprogress
12/20/2024HVAC and service water heating equipment FAHAD FATEHenergy_progress
12/20/2024HVAC and service water heating system controls FAHAD FATEHenergy_progress
12/20/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
12/20/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
Latest 25 of 50.
▾Documents — 214 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch6
08/31/2026B00665574-P1Request digital key ↗
08/31/2026B00665574-I1Request digital key ↗
08/28/2026B08033424-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/01/2026B00407300-P2Request digital key ↗
09/01/2026B00407300-P2Request digital key ↗
09/01/2026B00407300-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/01/2026B00348474-P2Request digital key ↗
08/22/2026B00348474-P1Request digital key ↗
08/22/2026B00348474-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
09/01/2026B00407300-P2Request digital key ↗
09/01/2026B00407300-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut2
09/02/2026B00405341-I1Request digital key ↗
09/02/2026B00406515-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
09/02/2026B00272627-I1Request digital key ↗
09/02/2026B00405657-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/14/2026B00462590-I1Request digital key ↗
▸Applications & Permits22
▸BISPLAN / WORK APPROVAL APPLICATION13
04/11/2025340805711Open ↗
02/28/2025321590051Open ↗
02/27/2025321590051Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION6
07/26/2024321590051Open ↗
04/11/2024321590051Open ↗
03/24/2022321590051Open ↗
Showing 3 of 6 on file for this type
▸BISTEMPORARY FENCE APPLICATION & PERMIT1
03/08/2022321590051Open ↗
▸BISSIDEWALK SHED APPLICATION & PERMIT1
03/08/2022321590051Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
05/20/2021340805711Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISZONING DIAGRAM2
04/08/2021321590051Open ↗
04/08/2021321590051Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
03/16/2021321590051Open ↗
▸BISVERIFY TAX LOT1
03/17/2025321590051Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
03/17/2025321590051Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
03/16/2021321590051Open ↗
▸Seals & Professional Certifications48
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/02/2026B00405341-I1Open ↗
09/02/2026B00405657-I1Open ↗
09/02/2026B00406515-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/13/2026B00348474-I1Open ↗
09/13/2026B00348474-I1Open ↗
09/01/2026B00348474-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/13/2026B00348474-I1Open ↗
09/13/2026B00348474-I1Open ↗
09/01/2026B00348474-P1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
06/29/2020321995267Open ↗
10/07/2019321995267Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
05/19/2021340805711Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/19/2021340805711Open ↗
▸Trade Schedules & Equipment4
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION2
04/07/2025321590051Open ↗
04/07/2025321590051Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
03/17/2025321590051Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
03/17/2025321590051Open ↗
▸Safety & Tenant Protection13
▸BISSTREET TREE CHECKLIST4
05/08/2025340805711Open ↗
05/20/2021340805711Open ↗
04/08/2021321590051Open ↗
Showing 3 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
09/17/2021321995267Open ↗
06/29/2020321995267Open ↗
10/07/2019321995267Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
04/16/2025340805711Open ↗
03/08/2022321590051Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST2
09/17/2021321995267Open ↗
06/29/2020321995267Open ↗
▸BISBPP: STREET TREES SITE PLAN1
05/08/2025340805711Open ↗
▸BISSTREET TREE SIGNOFF1
03/17/2025321590051Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/29/2020321995267Open ↗
▸Energy Compliance14
▸DOB NOWEN2: As Built Energy Analysis.2
09/01/2026B00407300-I1Open ↗
08/13/2026B00348474-I1Open ↗
▸BISINTERIOR LIGHTING POWER1
03/17/2025321590051Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
03/17/2025321590051Open ↗
▸BISFENESTRATION AREAS1
03/17/2025321590051Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
03/17/2025321590051Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/08/2022321590051Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
03/17/2025321590051Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
04/15/2025321590051Open ↗
▸BISELECTRIC MOTORS1
03/17/2025321590051Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/17/2025321590051Open ↗
▸BIS* HVAC INSULATION AND SEALING1
03/17/2025321590051Open ↗
▸BISLIGHTING CONTROLS1
03/17/2025321590051Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00348474-I1Open ↗
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY8
04/15/2025321590051Open ↗
04/15/2025321590051Open ↗
04/15/2025321590051Open ↗
Showing 3 of 8 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
03/17/2025321590051Open ↗
03/08/2022321590051Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
03/19/2025321590051Open ↗
03/08/2022321590051Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
04/15/2025321590051Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
04/15/2025321590051Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
04/15/2025321590051Open ↗
▸BISMASONRY1
04/15/2025321590051Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
04/15/2025321590051Open ↗
▸BISSOIL REPORT1
02/26/2021321590051Open ↗
▸BISSOIL PERC. TEST-PVT ON-SITE STORM WATER DRAINAGE DISPOSAL SYS & DET. FACL.1
04/15/2025321590051Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
04/08/2021321590051Open ↗
▸Approvals, Objections & Sign-offs19
▸BISSCHEDULE A - OCCUPANCY / USE8
02/28/2025321590051Open ↗
02/27/2025321590051Open ↗
03/25/2021321590051Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
09/17/2021321995267Open ↗
09/17/2021321995267Open ↗
09/17/2021321995267Open ↗
Showing 3 of 6 on file for this type
▸BISLANDMARKS APPROVAL3
09/17/2021321995267Open ↗
09/17/2021321995267Open ↗
06/29/2020321995267Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)2
04/07/2025321590051Open ↗
04/07/2025321590051Open ↗
▸Cost, Insurance & Ownership4
▸BISPROJECT-SPECIFIC GL INSURANCE3
07/26/2024321590051Open ↗
03/08/2022321590051Open ↗
06/29/2020321995267Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
07/26/2024321590051Open ↗
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION5
05/08/2025340805711Open ↗
09/17/2021321995267Open ↗
05/27/2021321590051Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM2
04/11/2024321590051Open ↗
03/24/2022321590051Open ↗
▸BISEFILING COVER SHEET2
05/15/2020321590051Open ↗
10/07/2019321995267Open ↗
▸Other Documents17
▸BISBPP - SUPPORTING DOCUMENTATION12
05/13/2025340805711Open ↗
05/13/2025340805711Open ↗
05/13/2025340805711Open ↗
Showing 3 of 12 on file for this type
▸BISSUSTAINABLE ROOF ZONE FORM1
09/25/2020321590051Open ↗
▸BISLOWEST FLOOR ELEVATION1
03/17/2025321590051Open ↗
▸BISVESTIBULES1
03/17/2025321590051Open ↗
▸BISMAINTENANCE INFORMATION1
03/17/2025321590051Open ↗
▸BISPLOT DIAGRAM1
03/16/2021321590051Open ↗