← Back
Two family frame
169 ST GEORGE ROAD
💬 Discuss this project
1915Year Built
2.5Stories
B2Building Class
R1-2Zoning
2,000 sfGross Floor Area
2Units
Two family frame · 4,000 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
Electrical
Roof2p · 1 filing · 10 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR210/17/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281210/17/2025
Building Lifecycle
All (9)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (5)
11/20/2025
Signed off — Alteration
Installation of solar panels, rooftop, railed, grid-tied, 17 modules, 6.97 KW
S01247772-I1
10/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
10/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
10/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
10/21/2025
Special inspection requirement — Final
Mina Makar
10/21/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
10/17/2025
Filed — Alteration
Installation of solar panels, rooftop, railed, grid-tied, 17 modules, 6.97 KW
S01247772-P1
06/30/2025
Permit issued — Solar
S01247772-I1-SL
06/27/2025
Filed — Alteration
Installation of solar panels, rooftop, railed, grid-tied, 17 modules, 6.97 KW
S01247772-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR06/30/2025
1 project · most recent 06/26/2025
FiledStatusContractorScope
06/26/2025CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/21/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
10/21/2025Fire-Resistant Penetrations and JointsMina Makarspecial
10/21/2025Energy Code Compliance InspectionsMina Makarprogress
10/21/2025FinalMina Makarprogress
10/21/2025Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/19/2026S01247772-I1Request digital key ↗
08/19/2026S01247772-P1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/19/2026S01247772-I1Open ↗
08/13/2026S01247772-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026S01247772-I1Open ↗
08/23/2026S01247772-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026S01247772-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/19/2026S01247772-I1Open ↗
08/13/2026S01247772-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01247772-I1Open ↗