← Back
Public elementary, junior or senior high
P.S. 77 Lower Lab School
1694 3 AVENUE · BIN 1048492
💬 Discuss this project
1960Year Built
3Stories
W1Building Class
R8BZoning
113,292 sfGross Floor Area
1Units
LL97 Covered2 Open Violations 0 unresolved · 2 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 61,432 sf lot · 1.84 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCSCA8303/22/2026
NYC DEPARTMENT OF PARKS AND RECREATION103/22/2026
DEPARTMENT OF EDUCATION703/22/2026
PS 198 DOE1003/22/2026
DEPT OF EDUCATION PS198603/22/2026
DOE PS 198 LOWER LAB1103/22/2026
DOE PS 198 040403/22/2026
D.O.E. P.S.198/77203/22/2026
DOE 040203/22/2026
DOE 1 040103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EME GROUP/SALAS O'BRIEN201/06/2026
EME CONSULTING ENGINEERING GROUP301/24/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FRANK FRANCOElectrical303/21/2026
DIA GENERAL CONTRUCTION IGeneral Contractor303/21/2026
CHAYUT, ALLENElectrical103/21/2026
CHIMENTI, ROBERTElectrical103/21/2026
FLORENTINE ARTISTIC IRONElectrical103/21/2026
GONZALEZ, RAFAELElectrical103/21/2026
ANDRA VOICUElectrical103/21/2026
LASER ELEC'L CONSTR'G INCElectrical103/22/2026
LUPINSKI, MAREKElectrical103/21/2026
ROBERT CHIMENTIElectrical103/21/2026
SCHWERDTFEGER, MARCUSElectrical103/21/2026
SEAN MCGINLEYElectrical103/21/2026
URBAN ELECTRICAL CORPElectrical103/22/2026
HAL OZKURTElectrical103/21/2026
ANDREW DRAZICElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC LOGISTICS DBA JPCL EN351601/06/2026
Building Lifecycle
All (92)Filed (5)Permit Issued (1)Violation (60)Objection (10)Special Inspection (16)
03/10/2026
Violation issued (ECB, open)
Construction
03/10/2026
Violation issued (ECB, open)
Construction
02/13/2026
Objection resolved — Addressed
01/28/2026
Objection resolved — Addressed
01/28/2026
Objection resolved — Addressed
01/18/2026
Objection raised — Admin
01/13/2026
Objection raised — Scope
01/13/2026
Objection raised — Inspections
01/06/2026
Filed — Alteration
THE SCOPE OF WORK INCLUDES ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO COMPLETE INSTALLATION OF THE SUPPLEMENTAL COOLING SYSTEM IN THE GYMNASIUM.
M01341270-I1
01/06/2026
Filed — Alteration
THE SCOPE OF WORK INCLUDES ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO COMPLETE INSTALLATION OF THE SUPPLEMENTAL COOLING SYSTEM IN THE AUDITORIUM.
M01341209-I1
12/31/2025
Special inspection requirement — Mechanical Systems
Asma Hashmi
12/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
12/31/2025
Special inspection requirement — Post-installed Anchors
Asma Hashmi
12/31/2025
Special inspection requirement — Final
Asma Hashmi
12/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
12/31/2025
Special inspection requirement — Post-installed Anchors
Asma Hashmi
12/31/2025
Special inspection requirement — Mechanical Systems
Asma Hashmi
12/31/2025
Special inspection requirement — Final
Asma Hashmi
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/25/2022
Violation issued (ECB, closed)
Construction
01/24/2022
Filed — Alteration
REMOVE EXISTING OFFICE PANTRY AND INSTALL NEW BATHROOM AT 1ST FLOOR. MODIFY EXISTING LIGHTING AND MILLWORK. INSTALL NEW PLUMBING FIXTURES, EXHAUST DUCT, LIGHTING, AND POWER AT NEW BATHROOM. CONNECT ALL NEW FIXTURES AND DEVICES TO EXISTING UTILITIES
M00524427-P1
01/20/2022
Special inspection requirement — Lighting controls
Asma Hashmi
01/20/2022
Special inspection requirement — Duct leakage testing, insulation and design
Asma Hashmi
01/20/2022
Special inspection requirement — Maintenance information
Asma Hashmi
01/20/2022
Special inspection requirement — Interior lighting power
Asma Hashmi
01/20/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
01/20/2022
Special inspection requirement — Mechanical Systems
Asma Hashmi
01/20/2022
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
01/20/2022
Special inspection requirement — Final
Asma Hashmi
10/05/2021
Permit issued — Mechanical Systems
M00524427-I1-GC-CX
08/17/2021
Objection raised — Other
08/17/2021
Objection resolved — Addressed
08/17/2021
Objection raised — Other
08/17/2021
Objection resolved — Addressed
08/13/2021
Filed — Alteration
REMOVE EXISTING OFFICE PANTRY AND INSTALL NEW BATHROOM AT 1ST FLOOR. MODIFY EXISTING LIGHTING AND MILLWORK. INSTALL NEW PLUMBING FIXTURES, EXHAUST DUCT, LIGHTING, AND POWER AT NEW BATHROOM. CONNECT ALL NEW FIXTURES AND DEVICES TO EXISTING UTILITIES
M00524427-S1
08/12/2021
Filed — Alteration
REMOVE EXISTING OFFICE PANTRY AND INSTALL NEW BATHROOM AT 1ST FLOOR. MODIFY EXISTING LIGHTING AND MILLWORK. INSTALL NEW PLUMBING FIXTURES, EXHAUST DUCT, LIGHTING, AND POWER AT NEW BATHROOM. CONNECT ALL NEW FIXTURES AND DEVICES TO EXISTING UTILITIES
M00524427-I1
04/17/2019
Violation issued (ECB, closed)
Construction
04/17/2019
Violation issued (ECB, closed)
Construction
02/02/2018
Violation issued (ECB, closed)
Construction
02/02/2018
Violation issued (ECB, closed)
Construction
02/02/2018
Violation issued (ECB, closed)
Construction
03/07/2017
Violation issued (ECB, closed)
Construction
03/07/2017
Violation issued (ECB, closed)
Construction
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/08/2016
Violation issued (ECB, closed)
Construction
07/08/2016
Violation issued (ECB, closed)
Construction
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/04/2015
Violation issued (ECB, closed)
Construction
06/04/2015
Violation issued (ECB, closed)
Construction
06/04/2015
Violation issued (ECB, closed)
Construction
04/08/2014
Violation issued (ECB, closed)
Construction
04/08/2014
Violation issued (ECB, closed)
Construction
04/08/2014
Violation issued (ECB, closed)
Construction
04/08/2014
Violation issued (ECB, closed)
Construction
04/08/2014
Violation issued (ECB, closed)
Construction
04/08/2014
Violation issued (ECB, closed)
Construction
02/21/2013
Violation issued (ECB, closed)
Construction
02/21/2013
Violation issued (ECB, closed)
Construction
02/21/2013
Violation issued (ECB, closed)
Construction
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedDIA GENERAL CONTRUCTION I10/05/2021
BISOTISSUEDWHITESTONE CONSTRUCTION CORP05/01/2025
BISMHISSUEDINDEPENDENT TEMPERATURE03/24/2025
BISOTISSUEDINDEPENDENT TEMPERATURE03/21/2025
BISMHISSUEDINDEPENDENT TEMPERATURE03/21/2025
BISOTISSUEDINDEPENDENT TEMPERATURE03/20/2025
BISOTISSUEDINDEPENDENT TEMPERATURE03/20/2025
BISOTISSUEDWHITESTONE CONSTRUCTION CORP03/27/2024
BISOTISSUEDINDEPENDENT TEMPERATURE03/25/2024
BISMHISSUEDINDEPENDENT TEMPERATURE03/25/2024
BISMHISSUEDINDEPENDENT TEMPERATURE03/25/2024
BISOTISSUEDINDEPENDENT TEMPERATURE03/25/2024
BISOTISSUEDINDEPENDENT TEMPERATURE03/25/2024
BISOTISSUEDWHITESTONE CONSTRUCTION CORP04/17/2023
BISOTISSUEDINDEPENDENT TEMPERATURE04/12/2023
BISOTISSUEDINDEPENDENT TEMPERATURE04/12/2023
BISMHISSUEDINDEPENDENT TEMPERATURE04/12/2023
BISOTISSUEDINDEPENDENT TEMPERATURE04/12/2023
BISMHISSUEDINDEPENDENT TEMPERATURE04/12/2023
BISMHISSUEDTAMEER INC08/31/2022
BISOTISSUEDTAMEER INC06/10/2022
BISMHISSUEDTAMEER INC06/09/2022
BISMHISSUEDTAMEER INC05/19/2022
BISOTISSUEDWHITESTONE CONSTRUCTION CORP05/13/2022
BISOTISSUEDINDEPENDENT TEMPERATURE03/28/2022
BISMHISSUEDINDEPENDENT TEMPERATURE03/28/2022
BISOTISSUEDINDEPENDENT TEMPERATURE03/28/2022
BISOTISSUEDINDEPENDENT TEMPERATURE03/28/2022
BISOTISSUEDINDEPENDENT TEMPERATURE03/28/2022
BISOTISSUEDWHITESTONE CONSTRUCTION CORP03/29/2021
BISMHISSUEDINDEPENDENT TEMPERATURE03/24/2021
BISMHISSUEDINDEPENDENT TEMPERATURE03/24/2021
BISOTISSUEDINDEPENDENT TEMPERATURE03/24/2021
BISOTISSUEDINDEPENDENT TEMPERATURE03/24/2021
BISMHISSUEDTAMEER INC01/19/2021
BISMHISSUEDTAMEER INC10/21/2020
BISOTISSUEDWHITESTONE CONSTRUCTION CORP04/08/2020
BISOTISSUEDINDEPENDENT TEMPERATURE04/01/2020
BISOTISSUEDINDEPENDENT TEMPERATURE03/30/2020
BISOTISSUEDINDEPENDENT TEMPERATURE03/30/2020
+ 11 more permits on file
3 projects · most recent 01/06/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/06/2026——Air Conditioning Systems
Cooling
Fujitsu FUJITSU - ASUB36KSA1 34,000 BTU · Fan Coil Indoor ×6
FUJITSU - AOSK96LSAN7 120,000 BTU · Vrf Outdoor ×2
01/06/2026——Air Conditioning Systems
Cooling
Fujitsu FUJITSU - ASUB36KSA1 34,000 BTU · Fan Coil Indoor ×8
FUJITSU - AOSK96LSAN7 120,000 BTU · Vrf Outdoor ×2
01/24/2022Permit IssuedDIA GENERAL CONTRUCTION IVentilation Systems—
1 project · most recent 01/24/2022
Water/Sanitary
FiledStatusContractorScope
01/24/2022——Water/Sanitary
20 projects · most recent 11/05/2025
General Wiring
FiledStatusContractorScope
11/05/2025CompleteETRICITY ELECTRICAL CO IN—
10/31/2025CompleteMAC FHIONNGHAILE & SONSGeneral Wiring
05/19/2025CompleteGEMINI ELECTRIC CO., INC.—
03/05/2025CompleteANCO ELECTL CONTCTNG INC—
10/22/2024CompleteETRICITY ELECTRICAL CO IN—
07/31/2024CompleteA.T.J. ELECTRICAL CO.INC.—
04/12/2024CompleteA.T.J. ELECTRICAL CO.INC.General Wiring
05/02/2023CompleteMAC FHIONNGHAILE & SONSGeneral Wiring
11/07/2022Permit IssuedETRICITY ELECTRICAL CO IN—
09/06/2022Permit IssuedROBERT CHIMENTI21 meters, 1 new_meters
06/02/2022Permit IssuedGEMINI ELECTRIC CO., INC.General Wiring
10/20/2021CompleteURBAN ELECTRICAL CORPGeneral Wiring
07/08/2021CompleteABM ELECTRIC, INC—
06/02/2021CompleteMAC FHIONNGHAILE & SONSGeneral Wiring
01/27/2021CompleteLIU ELECTRIC, LLCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
12/31/2025Mechanical SystemsAsma Hashmispecial
12/31/2025Fire-Resistant Penetrations and JointsAsma Hashmispecial
12/31/2025Post-installed AnchorsAsma Hashmispecial
12/31/2025FinalAsma Hashmiprogress
12/31/2025Fire-Resistant Penetrations and JointsAsma Hashmispecial
12/31/2025Post-installed AnchorsAsma Hashmispecial
12/31/2025Mechanical SystemsAsma Hashmispecial
12/31/2025FinalAsma Hashmiprogress
01/20/2022Lighting controlsAsma Hashmienergy_progress
01/20/2022Duct leakage testing, insulation and designAsma Hashmienergy_progress
01/20/2022Maintenance informationAsma Hashmienergy_progress
01/20/2022Interior lighting powerAsma Hashmienergy_progress
01/20/2022Fire-Resistant Penetrations and JointsAsma Hashmispecial
01/20/2022Mechanical SystemsAsma Hashmispecial
01/20/2022Energy Code Compliance InspectionsAsma Hashmiprogress
01/20/2022FinalAsma Hashmiprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 198, ManhattanEducation—
Project M01341209 Alteration · Approved · 01/06/2026
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/03/2026M00524427-P1Request digital key ↗
08/20/2026M01341270-I1Request digital key ↗
08/20/2026M01341209-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION3
11/10/2011120841287Open ↗
11/10/2011120841287Open ↗
10/06/2011120841287Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION3
10/11/2011120841287Open ↗
10/11/2011120841287Open ↗
10/06/2011120841287Open ↗
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature6
08/28/2026M00524427-P1Open ↗
08/28/2026M00524427-P1Open ↗
08/28/2026M00524427-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/03/2026M00524427-I1Open ↗
08/20/2026M01341270-I1Open ↗
08/20/2026M01341209-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/07/2016120841287Open ↗
10/06/2011120841287Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026M00524427-P1Open ↗
08/28/2026M00524427-P1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/06/2011120841287Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/06/2011120841287Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/14/2026M00524427-I1Open ↗
08/13/2026M00524427-S1Open ↗
08/13/2026M00524427-P1Open ↗
▸Approvals, Objections & Sign-offs12
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/14/2026M00524427-I1Open ↗
08/13/2026M01341209-I1Open ↗
08/13/2026M01341270-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)3
08/14/2026M00524427-I1Open ↗
08/13/2026M00524427-P1Open ↗
08/13/2026M00524427-S1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/13/2026M00524427-S1Open ↗
08/13/2026M00524427-I1Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
10/06/2011120841287Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/07/2016120841287Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
10/11/2011120841287Open ↗
10/11/2011120841287Open ↗
▸BISEFILING COVER SHEET1
10/06/2011120841287Open ↗
▸Other Documents5
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal3
08/14/2026M00524427-I1Open ↗
08/13/2026M00524427-P1Open ↗
08/13/2026M00524427-S1Open ↗
▸DOB NOWProof of Historic Building2
08/13/2026M01341209-I1Open ↗
08/13/2026M01341270-I1Open ↗