2007Year Built
2Stories
K2Building Class
R2Zoning
7,500 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Multi-story retail building (2+) · 7,500 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Empire state1p · 1 filing · 7 docs
Site & exteriorEmpire state3p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Psaab1107/08/2026
Empire State Bank307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Permanen Engineering International108/20/2020
Leon Skvirsky PE107/24/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KAS103/21/2026
Building Brothers203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Walter J Grande P HPlumbing303/22/2026
Scaran Oil ServiceGeneral Contractor107/08/2026
R.G.M. SignsSign hanger107/08/2026
KCM Plumbing & Heating CoPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Reliance Engineering322108/20/2020
Building Lifecycle
All (28)Filed (2)Permit Issued (2)Signed Off (1)Violation (17)Special Inspection (6)
07/08/2021
Signed off — Alteration
INSTALLATION OF SPLIT SYSTEM AC UNIT, AT EXISTING 1st FLOOR IT CLOSET.1 CONDENSING UNIT AT EXTERIOR NO CHANGE IN BULK, USE, OCCUPANCY AND/OR EGRESS.
S00387455-I1
09/03/2020
Permit issued — Mechanical Systems
S00387455-I1-MS
08/20/2020
Filed — Alteration
INSTALLATION OF SPLIT SYSTEM AC UNIT, AT EXISTING 1st FLOOR IT CLOSET.1 CONDENSING UNIT AT EXTERIOR NO CHANGE IN BULK, USE, OCCUPANCY AND/OR EGRESS.
S00387455-I1
08/19/2020
Special inspection requirement — Mechanical Systems
Ralph Giorgio
08/19/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ralph Giorgio
08/19/2020
Special inspection requirement — Final
Ralph Giorgio
08/19/2020
Special inspection requirement — Maintenance information
Ralph Giorgio
08/19/2020
Special inspection requirement — HVAC insulation and sealing
Ralph Giorgio
07/25/2018
Permit issued — Sign
S00058486-I1-SG
07/24/2018
Filed — Alteration
INSTALL ILLUMINATED SIGN ON WALL (EMPIRE STATE BANK)
S00058486-I1
07/02/2018
Special inspection requirement — Final
LEON SKVIRSKY
04/28/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/25/2013
Violation issued (ECB, closed)
Construction
11/18/2013
Violation issued (ECB, closed)
Unknown
11/18/2013
Violation issued (ECB, closed)
Construction
11/18/2013
Violation issued (ECB, closed)
Construction
07/03/2012
Violation issued (ECB, closed)
Construction
05/18/2012
Violation issued (ECB, closed)
Construction
02/08/2012
Violation issued (ECB, closed)
Construction
12/07/2011
Violation issued (ECB, closed)
Construction
12/07/2011
Violation issued (ECB, closed)
Unknown
09/08/2010
Violation issued (ECB, closed)
Construction
04/09/2001
Violation issued (ECB, closed)
Site Safety
12/07/1995
Violation issued (ECB, closed)
Construction
11/16/1995
Violation issued (FDNY_NOV, closed)
07/23/1993
Violation issued (ECB, closed)
Construction
07/23/1993
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offScaran Oil Service09/03/2020
DOB NOWSignPermit IssuedR.G.M. Signs07/25/2018
BISSPISSUEDWalter J. Grande P&H07/20/2018
BISPLISSUEDKCM Plumbing & Heating Co05/25/2018
BISMHISSUEDM & H Construction Design04/27/2018
BISOTISSUEDM & H Construction Design04/27/2018
BISPLISSUEDQuality Plumbing08/04/2014
BISEQISSUEDVik MGM07/25/2014
BISPLISSUEDUniversal Plumbing05/08/2014
BISSPISSUEDMercury Fire Supp11/06/2013
BIS—ISSUEDVik MGM07/26/2013
BISEQISSUEDVik MGM07/26/2013
BISPLISSUEDUniversal Plumbing02/07/2013
BIS—ISSUEDVik MGM02/01/2013
BISEQISSUEDVik MGM01/24/2013
BISEQISSUEDMammoth07/27/2012
BIS—ISSUEDReliable Roofing06/21/2010
BISEQISSUEDReliable Roofing06/21/2010
BIS—ISSUEDReliable Roofing07/15/2009
BISEQISSUEDReliable Contracting07/18/2008
BIS—ISSUEDReliable Contracting07/18/2008
BISEQISSUEDReliable Contracting07/19/2007
BIS—ISSUEDReliable Contracting09/29/2006
BIS—ISSUEDA.J.M. Commodities04/05/2001
BIS—ISSUEDA.J.M. Commodities04/05/2001
BIS—ISSUEDA.J.M. Commodities04/05/2001
BISEQISSUEDA.J.M. Commodities04/05/2001
BIS—ISSUEDA.J.M. Commodities04/05/2001
2 projects · most recent 07/12/2018
General Wiring
FiledStatusContractorScope
07/12/2018CompletePaul Verardi—
05/30/2018Permit IssuedJ.H. Electric of New YorkGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/19/2020Mechanical SystemsRalph Giorgiospecial
08/19/2020Fire-Resistant Penetrations and JointsRalph Giorgiospecial
08/19/2020FinalRalph Giorgioprogress
08/19/2020Maintenance informationRalph Giorgioenergy_progress
08/19/2020HVAC insulation and sealing Ralph Giorgioenergy_progress
07/02/2018FinalLEON SKVIRSKYprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Empire stateRetailFloor 1
Project S00387455 Alteration · LOC Issued · 08/20/2020
Project S00058486 Alteration · Permit Entire · 07/24/2018
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 114 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/26/2026S00387455-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/26/2026S00058486-I1Request digital key ↗
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION9
12/13/2018520335637Open ↗
08/21/2018520334157Open ↗
05/11/2018520335637Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION6
07/25/2018520335637Open ↗
05/29/2018520334157Open ↗
04/28/2018520334157Open ↗
Showing 3 of 6 on file for this type
▸BISBPP-16 - Application for waiver of curb alignment and/or sidewalk and curb4
09/26/2016520210806Open ↗
02/12/2016520210806Open ↗
10/08/2015520210806Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
11/30/2017520210806Open ↗
▸Seals & Professional Certifications23
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
09/07/2018520334157Open ↗
09/05/2018520335637Open ↗
05/11/2018520335637Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
05/11/2018520335637Open ↗
04/20/2018520334157Open ↗
04/20/2018520334157Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
05/11/2018520335637Open ↗
04/20/2018520334157Open ↗
04/20/2018520334157Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/26/2026S00058486-I1Open ↗
08/23/2026S00387455-I1Open ↗
08/23/2026S00387455-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/26/2026S00387455-I1Open ↗
08/13/2026S00058486-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026S00387455-I1Open ↗
08/23/2026S00387455-I1Open ↗
▸Trade Schedules & Equipment19
▸BISRPZ/DDCV TEST REPORT : GEN215B5
12/15/2014520163876Open ↗
10/22/2014520163876Open ↗
10/22/2014520163876Open ↗
Showing 3 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
10/28/2014520163876Open ↗
10/10/2014520163876Open ↗
08/20/2014520163876Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
12/13/2018520335637Open ↗
08/21/2018520334157Open ↗
05/11/2018520335637Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING2
09/27/2013520163876Open ↗
09/24/2013520163876Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
04/30/2014520163876Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
09/25/2014520163876Open ↗
▸BISWATER METER PERMIT : DEP-METER1
11/21/2014520163876Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
05/11/2018520335637Open ↗
04/20/2018520334157Open ↗
04/20/2018520334157Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
09/07/2018520334157Open ↗
04/20/2018520334157Open ↗
11/18/2014520163876Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
09/07/2018520334157Open ↗
11/18/2014520163876Open ↗
▸Inspections & Test Reports3
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
11/30/2017520210806Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
09/24/2013520163876Open ↗
▸BISHYDRO FLOW TEST LETTER1
09/24/2013520163876Open ↗
▸Approvals, Objections & Sign-offs10
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
03/04/2019520335637Open ↗
01/30/2019500753598Open ↗
10/01/2018520334157Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
05/11/2018520335637Open ↗
09/24/2013520163876Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
11/30/2017520210806Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/30/2017520210806Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
11/21/2014520163876Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
11/30/2018520335637Open ↗
09/07/2018520334157Open ↗
05/11/2018520335637Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms17
▸BISBOROUGH INTAKE FORM7
03/04/2019520335637Open ↗
01/30/2019500753598Open ↗
12/13/2018520335637Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET5
05/11/2018520335637Open ↗
04/20/2018520334157Open ↗
04/20/2018520334157Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION4
09/26/2016520210806Open ↗
09/26/2016520210806Open ↗
10/08/2015520210806Open ↗
Showing 3 of 4 on file for this type
▸BISeFiling Job Application Cover Sheet1
09/27/2013520163876Open ↗
▸Other Documents5
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form4
11/22/2017520210806Open ↗
06/22/2017520210806Open ↗
10/11/2016520210806Open ↗
Showing 3 of 4 on file for this type
▸BISDRY PIPE VALVE TEST : FP-101
01/14/2015520163876Open ↗