← Back
BuildNYC
Two family converted from one family
17-02 SUYDAM STREET
QUEENS · Ridgewood · BIN 4081662
💬 Discuss this project
1945Year Built
2Stories
B3Building Class
R4Zoning
1,360 sfGross Floor Area
2Units
0 Active Violations
Two family converted from one family · 2,000 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction7p · 1 filing · 20 docs
Floor 2Under Construction30p · 1 filing · 20 docs
Floor 1Under Construction29p · 1 filing · 20 docs
CellarUnder Construction29p · 1 filing · 20 docs
Site & exteriorUnder Construction12p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Casapao303/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/11/2024$1.2M—Private party → Private party$919/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Commoncraft Architecture208/31/2026
BHK Engineering303/23/2026
Tan Engineering206/25/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB Building Consulting603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Airitan ManagementGeneral Contractor103/21/2026
Blue City ConstructionGeneral Contractor108/21/2026
LJS Piping HeatingPlumbing103/21/2026
Blue City Constructionspecialty_contractor108/22/2026
Kishan PlumbingPlumbing109/03/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Buildtech Engineering6369208/31/2026
BHK Engineering9589303/23/2026
Tan Engineering1291106/25/2025
Building Lifecycle
11/12/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
Q01185836-I1-GC
11/12/2026
Permit expired, never signed off — Mechanical Systems
The city's record still shows this permit as issued, with no sign-off on its filing
Q01185836-S1-MS
09/29/2026
Objection raised — Scope
09/29/2026
Objection raised — Admin
09/02/2026
Permit issued — Plumbing
Q01185836-S2-PL
64 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedKishan Plumbing09/02/2026
DOB NOWMechanical SystemsPermit IssuedBlue City Construction08/21/2026
DOB NOWGeneral ConstructionPermit IssuedBlue City Construction08/20/2026
BISOTISSUEDAiritan Management02/02/2017
BISPLISSUEDL.J.S. Piping and Heating02/02/2017
1 project · most recent 08/31/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
08/31/2026Permit IssuedBlue City ConstructionHeating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 08/31/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/31/2026Permit IssuedKishan PlumbingGas, Water/Sanitary
1 project · most recent 09/09/2026
General Wiring
FiledStatusContractorScope
09/09/2026Permit IssuedJoseph Weinstein ElectricGeneral Wiring
1 project · most recent 08/31/2026
Steel
FiledStatusContractorScope
08/31/2026Permit IssuedKishan PlumbingSteel
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
08/26/2026Construction Operations Influencing Adjacent StructuresLuis Pichardospecial
08/26/2026Fire-Resistant Penetrations and JointsLuis Pichardospecial
08/26/2026Structural Stability – Alterations of existing buildingsLuis Pichardospecial
08/26/2026Energy Code Compliance InspectionsLuis Pichardoprogress
08/26/2026FinalRONALD VILLANOprogress
08/26/2026Air barrier — testing Luis Pichardoenergy_progress
08/26/2026Fenestration areasLuis Pichardoenergy_progress
08/26/2026Fenestration air leakageLuis Pichardoenergy_progress
08/26/2026Air barrier - visual inspectionLuis Pichardoenergy_progress
08/26/2026Insulation placement and R valuesLuis Pichardoenergy_progress
08/26/2026Interior lighting powerRONALD VILLANOenergy_progress
08/26/2026MeteringRONALD VILLANOenergy_progress
08/26/2026Fenestration and door U-factor and product ratingsLuis Pichardoenergy_progress
05/01/2026Energy Code Compliance InspectionsRoger Tanprogress
05/01/2026HVAC-R and service water piping design and insulationRoger Tanenergy_progress
03/23/2026Excavations - Sheeting, Shoring, and BracingWilliam DeGraaffspecial
03/23/2026Concrete - Cast-In-PlaceWilliam DeGraaffspecial
03/23/2026Excavations - Sheeting, Shoring, and BracingWilliam DeGraaffspecial
03/23/2026Post-installed AnchorsWilliam DeGraaffspecial
03/23/2026Structural Steel - DetailsWilliam DeGraaffspecial
03/23/2026Structural Steel - High Strength BoltingWilliam DeGraaffspecial
03/23/2026Structural Steel - WeldingWilliam DeGraaffspecial
01/29/2026Structural Stability – Alterations of existing buildings—special
01/29/2026Structural Stability – Alterations of existing buildingsWilliam DeGraaffspecial
12/11/2025FinalWilliam DeGraaffprogress
Latest 25 of 35.
79 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account