← Back
BuildNYC
Elevator apt, semi-fireproof without stores
17-11 HANCOCK STREET
QUEENS · Ridgewood · BIN 4085882
💬 Discuss this project
2022Year Built
7Stories
D1Building Class
C4-3AZoning
43,914 sfGross Floor Area
60Units
Rent Stabilized3 Active Violations ▸
Elevator apt, semi-fireproof without stores · Owner of record: Hancock St Residence · 11,050 sf lot · 3.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofFire sprinkler system installation33p · 4 filings · 20 docs
BulkheadFire sprinkler system installation2p · 2 filings · 20 docs
Floor 7Fire sprinkler system installation41p · 4 filings · 20 docs
Floor 6Fire sprinkler system installation41p · 4 filings · 20 docs
Floor 5Fire sprinkler system installation39p · 4 filings · 20 docs
Floor 4Fire sprinkler system installation33p · 4 filings · 20 docs
Floor 3Temporary needle beam installation34p · 5 filings · 20 docs
Floor 2Fire sprinkler system installation40p · 4 filings · 20 docs
Floor 1Roadway and sidewalk construction46p · 6 filings · 20 docs
CellarFire sprinkler system installation37p · 5 filings · 20 docs
Site & exteriorTemporary needle beam installation35p · 8 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Design Safety403/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution1803/21/2026
NYC Design File903/21/2026
Avalon Design403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Core Scaffold SystemsScaffold807/08/2026
City Builders NYCGeneral Contractor507/08/2026
Design N SafetyScaffold403/21/2026
Safety Fire SprinklerFire Protection307/08/2026
Headquarters MechanicalPlumbing207/08/2026
City Builders NYCScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Regional Testing394609/22/2022
AR-Tech Engineering6659101/06/2022
Big Apple Group NY A Rma9168103/15/2021
Building Lifecycle
09/06/2026
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQFT OBSERVED AT CEILING IN THE BATHROOM LOCATED…
HPD violation · open
06/02/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM WEST…
HPD violation · open
06/02/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE LAMINATED WOOD FLOOR IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT…
HPD violation · closed
06/02/2026
§ 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES AT WASHBASIN IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT…
HPD violation · closed
06/02/2026
§ 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT WASHBASIN IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT…
HPD violation · closed
140 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedCity Builders NYC11/14/2022
DOB NOWCurb CutSigned-offCity Builders NYC11/10/2022
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems02/14/2022
DOB NOWSprinklersSigned-offSafety Fire Sprinkler02/10/2022
DOB NOWSprinklersSigned-offSafety Fire Sprinkler01/20/2022
DOB NOWConstruction FenceSigned-offCity Builders NYC01/06/2022
DOB NOWPlumbingSigned-offHeadquarters Mechanical12/28/2021
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems12/17/2021
DOB NOWStructuralPermit IssuedCity Builders NYC11/21/2021
DOB NOWPlumbingSigned-offHeadquarters Mechanical11/04/2021
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems08/10/2021
DOB NOWConstruction FenceSigned-offDesign N Safety05/10/2021
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems04/06/2021
DOB NOWSprinklersSigned-offSafety Fire Sprinkler03/23/2021
DOB NOWConstruction FenceSigned-offDesign N Safety03/16/2021
BIS—ISSUEDCity Builders NYC08/22/2022
BIS—ISSUEDCity Builders NYC08/20/2021
BIS—ISSUEDCity Builders NYC08/20/2021
BIS—ISSUEDDesign N Safety04/12/2021
BISPLISSUEDAnthony Gallina H&M07/22/1996
BISPLISSUEDAnthony Gallina H&M07/12/1996
BIS—ISSUEDAmbrosino Construction04/24/1996
BISOTISSUEDAmbrosino Construction04/01/1994
6 projects · most recent 02/23/2025
General Wiring
FiledStatusContractorScope
02/23/2025CompleteBLZ ElectricGeneral Wiring
02/14/2022CompleteStar Electrical Contractors—
01/06/2022CompleteContact ElectricGeneral Wiring
12/15/2021CompleteContact Electric—
08/09/2021CompleteV. Vass Electric—
03/31/2021CompleteV. Vass Electric—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
12/27/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/22/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/21/2022Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
11/21/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/17/2022Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
11/17/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/17/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
11/17/2022Post-installed AnchorsPaul Raymondspecial
11/17/2022Energy Code Compliance InspectionsPaul Raymondprogress
11/17/2022HVAC and service water heating system controls Paul Raymondenergy_progress
11/17/2022HVAC and service water heating equipment Paul Raymondenergy_progress
11/17/2022HVAC insulation and sealing Paul Raymondenergy_progress
11/17/2022Maintenance informationPaul Raymondenergy_progress
11/17/2022Fire-Resistant Penetrations and JointsPaul Raymondspecial
11/17/2022Sprinkler SystemsPaul Raymondspecial
11/17/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPaul Raymondspecial
09/16/2022HVAC and service water heating system controls Paul Raymondenergy_progress
09/16/2022Energy Code Compliance InspectionsPaul Raymondprogress
09/16/2022Sprinkler SystemsPaul Raymondspecial
09/16/2022Fire-Resistant Penetrations and JointsPaul Raymondspecial
09/16/2022Post-installed AnchorsPaul Raymondspecial
09/16/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPaul Raymondspecial
09/16/2022HVAC and service water heating equipment Paul Raymondenergy_progress
09/16/2022HVAC insulation and sealing Paul Raymondenergy_progress
09/16/2022Maintenance informationPaul Raymondenergy_progress
07/26/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPaul Raymondspecial
07/26/2022Energy Code Compliance InspectionsPaul Raymondprogress
07/26/2022Maintenance informationPaul Raymondenergy_progress
07/26/2022HVAC and service water heating equipment Paul Raymondenergy_progress
07/26/2022HVAC and service water heating system controls Paul Raymondenergy_progress
07/26/2022HVAC insulation and sealing Paul Raymondenergy_progress
07/26/2022Fire-Resistant Penetrations and JointsPaul Raymondspecial
Latest 25 of 47.
243 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account