← Back
Two family converted from one family
17-33 150 STREET
QUEENS · BIN 4106387
💬 Discuss this project
1955Year Built
2Stories
B3Building Class
R3AZoning
2,280 sfGross Floor Area
2Units
Two family converted from one family · 3,800 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 212p · 2 filings · 20 docs
Floor 112p · 1 filing · 20 docs
Cellar12p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/12/2024$2.2M—Private party → Private party$952/sf building
10/07/2022$1.9M—17-33 150 ST LLC → Private party$840/sf building
02/22/2021$882K—Private party → 17-33 150 ST LLC$387/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZHENG & ASSOCIATES LLC808/05/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPLEN CONSTRUCTION INCGeneral Contractor407/08/2026
WATSON'S PLBG, HTG, & BDGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZHENG & ASSOCIATES LLC7330608/05/2022
TRIANGLE INSPECTION & TES7495303/11/2022
Building Lifecycle
All (63)Filed (8)Permit Issued (3)Signed Off (3)Inspection (7)Objection (12)Special Inspection (30)
09/06/2022
Signed off — Alteration CO
CONVERT ONE FAMILY INTO TWO FAMILY DWELLING UNITS. HORIZONTAL EXTENSION TO EXISTING BUILDING. OBTAIN A NEW C. OF. O
Q00505434-I1
08/15/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Jinfar Liu
08/15/2022
Special inspection requirement — Final
Jinfar Liu
08/15/2022
Special inspection requirement — Structural Steel - Welding
Jinfar Liu
08/15/2022
Special inspection requirement — Fenestration areas
Jinfar Liu
08/15/2022
Special inspection requirement — Interior lighting power
Jinfar Liu
08/15/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Jinfar Liu
08/15/2022
Special inspection requirement — Structural Steel - High Strength Bolting
Jinfar Liu
08/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
08/15/2022
Special inspection requirement — Wood – Metal-Plate-Connected Trusses
Jinfar Liu
08/15/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
08/15/2022
Special inspection requirement — Concrete - Cast-In-Place
Jinfar Liu
08/15/2022
Special inspection requirement — Lighting controls
Jinfar Liu
08/15/2022
Special inspection requirement — Structural Steel - Details
Jinfar Liu
08/15/2022
Special inspection requirement — Insulation placement and R values
Jinfar Liu
08/15/2022
Special inspection requirement — Air barrier - visual inspection
Jinfar Liu
08/15/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Jinfar Liu
08/15/2022
Special inspection requirement — Metering
Jinfar Liu
08/15/2022
Special inspection requirement — Fenestration air leakage
Jinfar Liu
08/15/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Jinfar Liu
08/15/2022
Special inspection requirement — Footing and Foundation
Jinfar Liu
08/12/2022
Objection resolved — Addressed
08/11/2022
Objection raised — Scope
08/05/2022
Filed — Alteration CO
CONVERT ONE FAMILY INTO TWO FAMILY DWELLING UNITS. HORIZONTAL EXTENSION TO EXISTING BUILDING. OBTAIN A NEW C. OF. O
Q00505434-P2
08/05/2022
Special inspection requirement — Structural Steel - Welding
Jinfar Liu
08/05/2022
Special inspection requirement — Structural Steel - High Strength Bolting
Jinfar Liu
08/05/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
08/05/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
08/05/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Jinfar Liu
08/05/2022
Special inspection requirement — Structural Steel - Details
Jinfar Liu
08/05/2022
Special inspection requirement — Wood – Metal-Plate-Connected Trusses
Jinfar Liu
08/05/2022
Special inspection requirement — Concrete - Cast-In-Place
Jinfar Liu
08/05/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Jinfar Liu
08/05/2022
Special inspection requirement — Final
Jinfar Liu
05/27/2022
Signed off — Alteration
PLUMBING WORK FOR PROPOSED TWO FAMILY DWELLING UNIT.
Q00505995-I1
04/26/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/25/2022
Signed off — Alteration
INSTALL TEMPORARY CONSTRUCTION FENCE
Q00505988-I1
04/04/2022
Filed — Alteration CO
CONVERT ONE FAMILY INTO TWO FAMILY DWELLING UNITS. HORIZONTAL EXTENSION TO EXISTING BUILDING. OBTAIN A NEW C. OF. O
Q00505434-P1
03/28/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/11/2022
Filed — Alteration
PLUMBING WORK FOR PROPOSED TWO FAMILY DWELLING UNIT.
Q00505995-P2
10/29/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/29/2021
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/29/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/29/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/21/2021
Filed — Alteration
PLUMBING WORK FOR PROPOSED TWO FAMILY DWELLING UNIT.
Q00505995-P1
08/06/2021
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/22/2021
Permit issued — Plumbing
Q00505995-I1-PL
07/12/2021
Filed — Alteration
INSTALL TEMPORARY CONSTRUCTION FENCE
Q00505988-P1
07/01/2021
Permit issued — Construction Fence
Q00505988-I1-FN
07/01/2021
Permit issued — General Construction
Q00505434-I1-GC-CX
06/30/2021
Filed — Alteration
PLUMBING WORK FOR PROPOSED TWO FAMILY DWELLING UNIT.
Q00505995-I1
04/26/2021
Objection raised — Other
04/26/2021
Objection resolved — Addressed
04/26/2021
Objection raised — Zoning
04/26/2021
Objection resolved — Addressed
04/26/2021
Objection raised — Scope
04/26/2021
Objection resolved — Addressed
04/26/2021
Objection raised — Other
04/26/2021
Objection resolved — Addressed
04/23/2021
Objection raised — Other
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG07/22/2021
DOB NOWConstruction FenceSigned-offSPLEN CONSTRUCTION INC07/01/2021
DOB NOWGeneral ConstructionPermit IssuedSPLEN CONSTRUCTION INC07/01/2021
1 project · most recent 08/18/2021
General Wiring
FiledStatusContractorScope
08/18/2021CompleteKJK ELECTRIC INCGeneral Wiring
1 project · most recent 08/05/2022
FiledStatusContractorScope
08/05/2022Permit IssuedSPLEN CONSTRUCTION INC3 scope_items
1 project · most recent 08/05/2022
Earthwork Tenant Protection Plan 72 Hour
FiledStatusContractorScope
08/05/2022Permit IssuedSPLEN CONSTRUCTION INCEarthwork, Tenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/26/2022Pass-Final CND-Occupancy InspectionPassView ↗
03/28/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/29/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/29/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/29/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/29/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/06/2021Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 79
DateRequirementInspectorRole
08/15/2022Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
08/15/2022Excavations - Sheeting, Shoring, and BracingJinfar Liuspecial
08/15/2022Concrete - Cast-In-PlaceJinfar Liuspecial
08/15/2022Structural Steel - WeldingJinfar Liuspecial
08/15/2022Wood – Metal-Plate-Connected TrussesJinfar Liuspecial
08/15/2022Structural Steel - DetailsJinfar Liuspecial
08/15/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJinfar Liuspecial
08/15/2022Structural Steel - High Strength BoltingJinfar Liuspecial
08/15/2022Fire-Resistant Penetrations and JointsJinfar Liuspecial
08/15/2022Footing and FoundationJinfar Liuprogress
08/15/2022FinalJinfar Liuprogress
08/15/2022Insulation placement and R valuesJinfar Liuenergy_progress
08/15/2022Interior lighting powerJinfar Liuenergy_progress
08/15/2022Lighting controlsJinfar Liuenergy_progress
08/15/2022Fenestration areasJinfar Liuenergy_progress
08/15/2022Air barrier - visual inspectionJinfar Liuenergy_progress
08/15/2022Fenestration and door U-factor and product ratingsJinfar Liuenergy_progress
08/15/2022MeteringJinfar Liuenergy_progress
08/15/2022Fenestration air leakageJinfar Liuenergy_progress
08/15/2022HVAC-R and service water piping design and insulationJinfar Liuenergy_progress
08/05/2022Footing and FoundationJinfar Liuprogress
08/05/2022Concrete - Cast-In-PlaceJinfar Liuspecial
08/05/2022Excavations - Sheeting, Shoring, and BracingJinfar Liuspecial
08/05/2022Fire-Resistant Penetrations and JointsJinfar Liuspecial
08/05/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJinfar Liuspecial
Latest 25 of 79.
▾Documents — 78 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/27/2026Q00505988-I1Request digital key ↗
08/27/2026Q00505988-P1Request digital key ↗
08/27/2026Q00505995-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00505434-P1Open ↗
08/13/2026Q00505434-I1Open ↗
08/13/2026Q00505434-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00505434-I1Open ↗
▸Seals & Professional Certifications31
▸DOB NOWSpecial Inspector Seal & Signature12
08/31/2026Q00505995-P1Open ↗
08/31/2026Q00505995-P1Open ↗
08/31/2026Q00505995-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
08/31/2026Q00505995-P1Open ↗
08/31/2026Q00505995-P1Open ↗
08/28/2026Q00505434-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/27/2026Q00505988-P1Open ↗
08/27/2026Q00505988-I1Open ↗
08/27/2026Q00505995-I1Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00505434-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00505434-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00505434-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/27/2026Q00505995-P2Open ↗
08/27/2026Q00505995-P1Open ↗
08/27/2026Q00505995-I1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00505995-I1Open ↗
08/13/2026Q00505434-I1Open ↗
▸Inspections & Test Reports12
▸DOB NOWSOIL REPORT6
08/13/2026Q00505434-I1Open ↗
08/13/2026Q00505434-P1Open ↗
08/13/2026Q00505434-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTR3 MIX Document3
08/13/2026Q00505434-P1Open ↗
08/13/2026Q00505434-P2Open ↗
08/13/2026Q00505434-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q00505995-I1Open ↗
08/13/2026Q00505434-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00505434-I1Open ↗
▸Other Documents12
▸DOB NOWPlot Diagram3
08/13/2026Q00505434-P1Open ↗
08/13/2026Q00505434-I1Open ↗
08/13/2026Q00505434-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00505434-P2Open ↗
08/13/2026Q00505434-P1Open ↗
08/13/2026Q00505434-I1Open ↗
▸DOB NOWSURVEY: INITIAL3
08/13/2026Q00505434-P2Open ↗
08/13/2026Q00505434-P1Open ↗
08/13/2026Q00505434-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q00505434-P2Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00505434-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00505434-I1Open ↗