← Back
Two stories - detached, small or mid-size
17-34 FRANCIS LEWIS BLVD
QUEENS · BIN 4107649
💬 Discuss this project
1955Year Built
2.5Stories
A1Building Class
R2AZoning
2,506 sfGross Floor Area
1Units
0 Open Violations
Two stories - detached, small or mid-size · 5,219 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 216p · 1 filing · 20 docs
Floor 116p · 1 filing · 20 docs
Cellar16p · 1 filing · 20 docs
1 job · most recent 07/21/2025
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
07/21/2025Permit IssuedPRIMROSE SERVICE INCHeating Systems
Heating
Williamson GWA-200 200,000 BTU · Boiler ×3
1 job · most recent 07/21/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/21/2025Signed-offROCK E SMALL PLBG&HTG INCGas, Storm, Water/Sanitary
2 jobs · most recent 01/16/2025
General Wiring
FiledStatusContractorScope
01/16/2025CompleteBERGER QUALITY ELEC'L CON—
06/07/2024CompleteKJK ELECTRIC INCGeneral Wiring
1 job · most recent 07/21/2025
Steel Masonry Wood
FiledStatusContractorScope
07/21/2025Signed-offROCK E SMALL PLBG&HTG INCSteel, Masonry, Wood
Building Lifecycle
All (75)Filed (10)Permit Issued (7)Signed Off (5)Violation (2)Inspection (9)Objection (12)Special Inspection (30)
08/10/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/23/2025
Signed off — Alteration CO
PROPOSE VERTICAL ENLARGEMENT FOR A SINGLE-FAMILY DETACHED RESIDENCE. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00927842-I1
09/08/2025
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00928197-I1
09/08/2025
Signed off — Alteration CO
PROPOSE VERTICAL ENLARGEMENT FOR A SINGLE-FAMILY DETACHED RESIDENCE. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00927842-S1
09/04/2025
Signed off — Alteration CO
PROPOSE VERTICAL ENLARGEMENT FOR A SINGLE-FAMILY DETACHED RESIDENCE. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00927842-S2
08/22/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/15/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/31/2025
Permit issued — Plumbing
Q00927842-S2-PL
07/30/2025
Special inspection requirement — Fenestration air leakage
MEHDI GHAZI
07/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
07/30/2025
Special inspection requirement — Fenestration areas
MEHDI GHAZI
07/30/2025
Special inspection requirement — Interior lighting power
MEHDI GHAZI
07/30/2025
Special inspection requirement — Permanent certificate
MEHDI GHAZI
07/30/2025
Special inspection requirement — Maintenance information
MEHDI GHAZI
07/30/2025
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
07/30/2025
Special inspection requirement — Chimneys and vents
MEHDI GHAZI
07/30/2025
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
07/30/2025
Special inspection requirement — Insulation placement and R values
MEHDI GHAZI
07/30/2025
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
07/30/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MEHDI GHAZI
07/30/2025
Special inspection requirement — Air barrier - visual inspection
MEHDI GHAZI
07/30/2025
Special inspection requirement — Electric vehicle service equipment requirements
MEHDI GHAZI
07/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
07/30/2025
Special inspection requirement — Mechanical Systems
MEHDI GHAZI
07/30/2025
Special inspection requirement — Heating Systems
MEHDI GHAZI
07/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MEHDI GHAZI
07/30/2025
Special inspection requirement — Final
MEHDI GHAZI
07/30/2025
Special inspection requirement — Fire-Resistance Rated Construction
MEHDI GHAZI
07/21/2025
Filed — Alteration CO
PROPOSE VERTICAL ENLARGEMENT FOR A SINGLE-FAMILY DETACHED RESIDENCE. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00927842-P5
07/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
07/21/2025
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
07/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
07/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
07/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
07/09/2025
Signed off — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Q01171569-I1
06/24/2025
Filed — Alteration CO
PROPOSE VERTICAL ENLARGEMENT FOR A SINGLE-FAMILY DETACHED RESIDENCE. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00927842-P4
03/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/06/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/29/2025
Permit issued — Solar
Q01171569-I1-SL
01/24/2025
Filed — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Q01171569-I1
01/24/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
01/24/2025
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
01/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
01/24/2025
Special inspection requirement — Final
TOM PETERSEN
01/24/2025
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
08/19/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/19/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/19/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/15/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/07/2024
Filed — Alteration CO
PROPOSE VERTICAL ENLARGEMENT FOR A SINGLE-FAMILY DETACHED RESIDENCE. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00927842-P3
08/06/2024
Objection resolved — Addressed
07/26/2024
Objection raised — Admin
06/25/2024
Filed — Alteration CO
PROPOSE VERTICAL ENLARGEMENT FOR A SINGLE-FAMILY DETACHED RESIDENCE. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00927842-P1
05/28/2024
Filed — Alteration CO
PROPOSE VERTICAL ENLARGEMENT FOR A SINGLE-FAMILY DETACHED RESIDENCE. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00927842-P2
05/09/2024
Violation issued (ECB, closed)
Construction
05/09/2024
Violation issued (ECB, closed)
Construction
03/15/2024
Permit issued — Plumbing
Q00927842-S2-PL
03/14/2024
Permit issued — General Construction
Q00927842-I1-GC
03/14/2024
Permit issued — Mechanical Systems
Q00927842-I1-MS
03/13/2024
Permit issued — Structural
Q00927842-S1-ST
Latest 60 of 75 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PRIMROSE SERVICE203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/30/2023$880K—Private party → Private party$351/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEHDI GHAZI, P.E., P.C.607/21/2025
MEI ARCHITECT PLLC306/24/2025
TOM PETERSEN ARCHITECT, LLC101/24/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ALPHA HOME DESIGN LLC1803/21/2026
KAMTECH RESTORATION CORP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRIMROSE SERVICE INCGeneral Contractor1007/08/2026
KAMTECH RESTORATION CORPGeneral Contractor203/21/2026
ROCK E SMALL PLBG&HTG INCPlumbing207/08/2026
BERGER QUALITY ELEC'L CONElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEHDI GHAZI, P.E. P.C.7129807/21/2025
THOMAS PETERSEN ARCHITECT7854101/24/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC07/31/2025
DOB NOWSolarSigned-offKAMTECH RESTORATION CORP01/29/2025
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC03/15/2024
DOB NOWGeneral ConstructionPermit IssuedPRIMROSE SERVICE INC03/14/2024
DOB NOWMechanical SystemsSigned-offPRIMROSE SERVICE INC03/14/2024
DOB NOWStructuralSigned-offPRIMROSE SERVICE INC03/13/2024
DOB NOWConstruction FenceSigned-offPRIMROSE SERVICE INC03/12/2024
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/10/2026Pass-Final CND-Occupancy InspectionPassView ↗
08/22/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/15/2025Fail-Final CND-Occupancy InspectionFailView ↗
03/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/19/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/19/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/15/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 69
DateRequirementInspectorRole
07/30/2025Heating SystemsMEHDI GHAZIspecial
07/30/2025FinalMEHDI GHAZIprogress
07/30/2025Mechanical SystemsMEHDI GHAZIspecial
07/30/2025Chimneys and ventsMEHDI GHAZIspecial
07/30/2025Structural Stability – Alterations of existing buildingsMEHDI GHAZIspecial
07/30/2025Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
07/30/2025Permanent certificateMEHDI GHAZIenergy_progress
07/30/2025Fenestration and door U-factor and product ratingsMEHDI GHAZIenergy_progress
07/30/2025Air barrier - visual inspectionMEHDI GHAZIenergy_progress
07/30/2025Fenestration areasMEHDI GHAZIenergy_progress
07/30/2025HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
07/30/2025Fenestration air leakageMEHDI GHAZIenergy_progress
07/30/2025Electric vehicle service equipment requirementsMEHDI GHAZIenergy_progress
07/30/2025HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
07/30/2025Interior lighting powerMEHDI GHAZIenergy_progress
07/30/2025Insulation placement and R valuesMEHDI GHAZIenergy_progress
07/30/2025Maintenance informationMEHDI GHAZIenergy_progress
07/30/2025HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
07/30/2025Energy Code Compliance InspectionsMEHDI GHAZIprogress
07/30/2025Fire-Resistance Rated ConstructionMEHDI GHAZIprogress
07/21/2025HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
07/21/2025HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
07/21/2025HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
07/21/2025Energy Code Compliance InspectionsMEHDI GHAZIprogress
07/21/2025Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
Latest 25 of 69.
▾Documents — 81 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/24/2026Q00928197-I1Request digital key ↗
08/23/2026Q00927842-P4Request digital key ↗
08/23/2026Q00927842-P3Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00927842-I1Open ↗
08/13/2026Q00927842-P4Open ↗
08/13/2026Q00927842-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00927842-I1Open ↗
▸Seals & Professional Certifications41
▸DOB NOWProgress Inspector Seal & Signature17
09/02/2026Q00927842-S1Open ↗
09/02/2026Q00927842-S1Open ↗
09/01/2026Q00927842-P2Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/02/2026Q00927842-S1Open ↗
09/02/2026Q00927842-S1Open ↗
09/01/2026Q00927842-P2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/23/2026Q00927842-P3Open ↗
08/23/2026Q00927842-P2Open ↗
08/23/2026Q00927842-P1Open ↗
Showing 3 of 10 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00927842-I1Open ↗
08/13/2026Q00927842-P1Open ↗
08/13/2026Q00927842-P4Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/23/2026Q00927842-S1Open ↗
08/23/2026Q00927842-P3Open ↗
08/23/2026Q00927842-P2Open ↗
Showing 3 of 9 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01171569-I1Open ↗
▸Other Documents13
▸DOB NOWSite Survey: Initial3
08/13/2026Q00927842-I1Open ↗
08/13/2026Q00927842-P1Open ↗
08/13/2026Q00927842-P4Open ↗
▸DOB NOWPlot Diagram3
08/13/2026Q00927842-I1Open ↗
08/13/2026Q00927842-P4Open ↗
08/13/2026Q00927842-P1Open ↗
▸DOB NOWProperty Ownership Certification3
08/23/2026Q00927842-P4Open ↗
08/23/2026Q00927842-I1Open ↗
08/14/2026Q00927842-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00927842-P4Open ↗
08/13/2026Q00927842-P1Open ↗
08/13/2026Q00927842-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00927842-I1Open ↗