← Back
Three families
17 ARLINGTON PLACE
BROOKLYN · Bedford-Stuyvesant (West) · BIN 3052992
💬 Discuss this project
1886Year Built
3Stories
C0Building Class
R6BZoning
3,600 sfGross Floor Area
3Units
Three families · 1,600 sf lot · 2.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof3p · 1 filing · 5 docs
Floor 329p · 1 filing · 20 docs
Floor 228p · 1 filing · 20 docs
Floor 128p · 1 filing · 20 docs
Cellar33p · 1 filing · 20 docs
Basement27p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/30/2017$2.3M—Private party → Private party$639/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY BUILDING ASSOCIATES INC106/23/2025
ALL CITY ENGINEERING, P.C.409/25/2024
CELMER ARCHITECTURE PLLC509/24/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
COMMERCIAL CAPITAL USA1803/21/2026
BROOKLYN SOLARWORKS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BLACK SQUARE BUILDERS CORPGeneral Contractor507/08/2026
ORBIT PLBG & HTG INCPlumbing207/08/2026
BROOKLYN SOLARWORKS LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244106/23/2025
SD TESTING & INSPECTION S7010909/25/2024
Building Lifecycle
All (77)Filed (10)Permit Issued (7)Signed Off (4)Inspection (8)Objection (18)Special Inspection (30)
03/13/2026
Signed off — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01198902-I1
07/07/2025
Permit issued — Solar
B01198902-I1-SL
06/23/2025
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01198902-I1
01/06/2025
Signed off — Alteration CO
Obtain CO for EXISTING TWO-FAMILY WITH GENERAL CONSTRUCTION AS SHOWN ON PLAN. RECONFIGURATION OF FLOOR USE PROMPTS NEW C OF O. NEW PLUMBING. MECHANICAL & STRUCTURE WORKS WILL BE FILED IN SUBSEQUENT APPLICATIONS.
B08017004-S3
01/05/2025
Signed off — Alteration CO
Obtain CO for EXISTING TWO-FAMILY WITH GENERAL CONSTRUCTION AS SHOWN ON PLAN. RECONFIGURATION OF FLOOR USE PROMPTS NEW C OF O. NEW PLUMBING. MECHANICAL & STRUCTURE WORKS WILL BE FILED IN SUBSEQUENT APPLICATIONS.
B08017004-S2
01/05/2025
Signed off — Alteration CO
Obtain CO for EXISTING TWO-FAMILY WITH GENERAL CONSTRUCTION AS SHOWN ON PLAN. RECONFIGURATION OF FLOOR USE PROMPTS NEW C OF O. NEW PLUMBING. MECHANICAL & STRUCTURE WORKS WILL BE FILED IN SUBSEQUENT APPLICATIONS.
B08017004-S1
01/03/2025
Permit issued — Structural
B08017004-S3-ST
12/05/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/21/2024
Objection resolved — Addressed
10/09/2024
Objection resolved — Addressed
09/27/2024
Special inspection requirement — Structural Steel - Details
XIUCHENG LI
09/27/2024
Special inspection requirement — Post-installed Anchors
XIUCHENG LI
09/27/2024
Special inspection requirement — Concrete - Cast-In-Place
XIUCHENG LI
09/27/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIUCHENG LI
09/27/2024
Special inspection requirement — Structural Steel - High Strength Bolting
XIUCHENG LI
09/27/2024
Special inspection requirement — Preliminary
XIUCHENG LI
09/27/2024
Special inspection requirement — Structural Wood Frame
XIUCHENG LI
09/27/2024
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
09/27/2024
Special inspection requirement — Final
XIUCHENG LI
09/27/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIUCHENG LI
09/27/2024
Special inspection requirement — Mechanical Systems
XIUCHENG LI
09/27/2024
Special inspection requirement — Final
XIUCHENG LI
09/27/2024
Special inspection requirement — Duct leakage testing, insulation and design
XIUCHENG LI
09/27/2024
Special inspection requirement — Maintenance information
XIUCHENG LI
09/27/2024
Special inspection requirement — HVAC-R and service water heating equipment
XIUCHENG LI
09/27/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
XIUCHENG LI
09/27/2024
Special inspection requirement — HVAC-R and service water heating system controls
XIUCHENG LI
09/27/2024
Special inspection requirement — Shutoff dampers
XIUCHENG LI
09/27/2024
Special inspection requirement — Structural Steel - Welding
XIUCHENG LI
09/27/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
XIUCHENG LI
09/26/2024
Objection raised — Scope
09/26/2024
Objection raised — Scope
09/25/2024
Filed — Alteration CO
Obtain CO for EXISTING TWO-FAMILY WITH GENERAL CONSTRUCTION AS SHOWN ON PLAN. RECONFIGURATION OF FLOOR USE PROMPTS NEW C OF O. NEW PLUMBING. MECHANICAL & STRUCTURE WORKS WILL BE FILED IN SUBSEQUENT APPLICATIONS.
B08017004-P4
09/25/2024
Filed — Alteration CO
Obtain CO for EXISTING TWO-FAMILY WITH GENERAL CONSTRUCTION AS SHOWN ON PLAN. RECONFIGURATION OF FLOOR USE PROMPTS NEW C OF O. NEW PLUMBING. MECHANICAL & STRUCTURE WORKS WILL BE FILED IN SUBSEQUENT APPLICATIONS.
B08017004-P5
09/25/2024
Objection resolved — Addressed
09/24/2024
Filed — Alteration CO
Obtain CO for EXISTING TWO-FAMILY WITH GENERAL CONSTRUCTION AS SHOWN ON PLAN. RECONFIGURATION OF FLOOR USE PROMPTS NEW C OF O. NEW PLUMBING. MECHANICAL & STRUCTURE WORKS WILL BE FILED IN SUBSEQUENT APPLICATIONS.
B08017004-P6
09/24/2024
Filed — Alteration CO
Obtain CO for EXISTING TWO-FAMILY WITH GENERAL CONSTRUCTION AS SHOWN ON PLAN. RECONFIGURATION OF FLOOR USE PROMPTS NEW C OF O. NEW PLUMBING. MECHANICAL & STRUCTURE WORKS WILL BE FILED IN SUBSEQUENT APPLICATIONS.
B08017004-P3
09/24/2024
Objection raised — Scope
09/16/2024
Special inspection requirement — Structural Wood Frame
XIUCHENG LI
09/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
09/16/2024
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
09/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
XIUCHENG LI
09/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
XIUCHENG LI
09/16/2024
Special inspection requirement — Maintenance information
XIUCHENG LI
09/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
XIUCHENG LI
09/16/2024
Special inspection requirement — Concrete - Cast-In-Place
XIUCHENG LI
09/16/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
XIUCHENG LI
09/16/2024
Special inspection requirement — Post-installed Anchors
XIUCHENG LI
08/14/2024
Permit issued — Plumbing
B08017004-S1-PL
07/11/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/30/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/28/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/23/2024
Permit issued — General Construction
B08017004-I1-GC
12/01/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/29/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/13/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/17/2023
Permit issued — Plumbing
B08017004-S1-PL
07/03/2023
Permit issued — Mechanical Systems
B08017004-S2-MS
06/22/2023
Permit issued — General Construction
B08017004-I1-GC
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offBROOKLYN SOLARWORKS LLC07/07/2025
DOB NOWStructuralSigned-offBLACK SQUARE BUILDERS COR01/03/2025
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC08/14/2024
DOB NOWGeneral ConstructionPermit IssuedBLACK SQUARE BUILDERS COR05/23/2024
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC08/17/2023
DOB NOWMechanical SystemsSigned-offBLACK SQUARE BUILDERS COR07/03/2023
DOB NOWGeneral ConstructionPermit IssuedBLACK SQUARE BUILDERS COR06/22/2023
1 project · most recent 09/25/2024
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/25/2024Signed-offBLACK SQUARE BUILDERS CORAir Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric MXZ-3C30NA3 28,400 BTU · Condensing Unit ×2
MXZ-SM48NAM-U1 48,000 BTU · Condensing Unit ×2
MXZ-SM60NAM-U1 60,000 BTU · Condensing Unit ×2
Ventilation
Greenheck Sp-A110 75 CFM · Exhaust Fan ×8
G-098-VG 250 CFM · Kitchen Exhaust ×2
1 project · most recent 09/25/2024
Gas Water/Sanitary
FiledStatusContractorScope
09/25/2024Signed-offORBIT PLBG & HTG INCGas, Water/Sanitary
3 projects · most recent 06/17/2025
General Wiring
FiledStatusContractorScope
06/17/2025CompleteBROOKYLN SOLARWORKS, LLC—
08/14/2024CancelledFRIED ELECTRIC CO.General Wiring
11/19/2023CompleteFRIED ELECTRIC CO.General Wiring
1 project · most recent 09/25/2024
Steel Concrete Wood
FiledStatusContractorScope
09/25/2024Signed-offBLACK SQUARE BUILDERS CORSteel, Concrete, Wood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
12/05/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/30/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/28/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/01/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/29/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/13/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
09/27/2024Structural Steel - DetailsXIUCHENG LIspecial
09/27/2024Post-installed AnchorsXIUCHENG LIspecial
09/27/2024Concrete - Cast-In-PlaceXIUCHENG LIspecial
09/27/2024Structural Stability – Alterations of existing buildingsXIUCHENG LIspecial
09/27/2024Structural Steel - High Strength BoltingXIUCHENG LIspecial
09/27/2024PreliminaryXIUCHENG LIprogress
09/27/2024Structural Wood FrameXIUCHENG LIprogress
09/27/2024Energy Code Compliance InspectionsXIUCHENG LIprogress
09/27/2024FinalXIUCHENG LIprogress
09/27/2024Structural Stability – Alterations of existing buildingsXIUCHENG LIspecial
09/27/2024Mechanical SystemsXIUCHENG LIspecial
09/27/2024FinalXIUCHENG LIprogress
09/27/2024Duct leakage testing, insulation and designXIUCHENG LIenergy_progress
09/27/2024Maintenance informationXIUCHENG LIenergy_progress
09/27/2024HVAC-R and service water heating equipmentXIUCHENG LIenergy_progress
09/27/2024HVAC-R and service water piping design and insulationXIUCHENG LIenergy_progress
09/27/2024HVAC-R and service water heating system controlsXIUCHENG LIenergy_progress
09/27/2024Shutoff dampersXIUCHENG LIenergy_progress
09/27/2024Structural Steel - WeldingXIUCHENG LIspecial
09/27/2024Construction Operations Influencing Adjacent StructuresXIUCHENG LIspecial
09/16/2024Structural Wood FrameXIUCHENG LIprogress
09/16/2024Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
09/16/2024Energy Code Compliance InspectionsXIUCHENG LIprogress
09/16/2024HVAC-R and service water heating equipmentXIUCHENG LIenergy_progress
09/16/2024HVAC-R and service water heating system controlsXIUCHENG LIenergy_progress
Latest 25 of 48.
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/24/2026B08017004-S3Request digital key ↗
08/24/2026B08017004-S2Request digital key ↗
08/24/2026B08017004-S1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits10
▸DOB NOWLPC Approval/Permit10
08/13/2026B08017004-P5Open ↗
08/13/2026B08017004-S2Open ↗
08/13/2026B08017004-S1Open ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B08017004-I1Open ↗
▸Seals & Professional Certifications26
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/24/2026B08017004-S3Open ↗
08/24/2026B08017004-S2Open ↗
08/24/2026B08017004-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/31/2026B08017004-P3Open ↗
08/31/2026B08017004-P3Open ↗
08/28/2026B08017004-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/31/2026B08017004-P3Open ↗
08/28/2026B08017004-S2Open ↗
08/28/2026B08017004-S2Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026B08017004-I1Open ↗
08/13/2026B08017004-P1Open ↗
08/13/2026B08017004-P3Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/24/2026B08017004-S2Open ↗
08/24/2026B08017004-S1Open ↗
08/24/2026B08017004-P5Open ↗
Showing 3 of 10 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01198902-I1Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification3
08/24/2026B08017004-P1Open ↗
08/15/2026B08017004-P3Open ↗
08/15/2026B08017004-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B08017004-I1Open ↗