← Back
BuildNYC
Elevator cooperative
17 CHITTENDEN AVENUE
MANHATTAN · BIN 1064363
💬 Discuss this project
1939Year Built
6Stories
D4Building Class
R7-2Zoning
29,322 sfGross Floor Area
33Units
LL97 CoveredRent Stabilized4 Active Violations 1 likely answered 1 old, status unconfirmed ▸FISP: SWARMP
Elevator cooperative · Owner of record: Chittenden House · 7,446 sf lot · 3.94 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofEbmg LLCUnder Construction3p · 2 filings · 15 docs
BulkheadEbmg LLC1p · 1 filing · 2 docs
CellarEbmg LLC16p · 4 filings · 20 docs
Site & exteriorEbmg LLCUnder Construction17p · 3 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Ebmg3810/07/2026
Chittenden Houses3303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Always Fast Services108/25/2026
Martos Engineering107/09/2026
Arquitectura Varela112/09/2024
Kamen Tall Architects109/12/2024
Moore308/12/2022
Bazini Engineering201/20/2022
New Age112/27/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Professional Design Consultants203/21/2026
Skyline Access103/21/2026
George E Berger Associates203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Platinum Services NYScaffold608/27/2026
Peaq Restorationspecialty_contractor403/21/2026
ZFMPlumbing407/08/2026
CM PlumbingPlumbing203/22/2026
Geiger RoofingGeneral Contractor103/21/2026
Jepol ConstructionGeneral Contractor103/21/2026
Mayim MechanicalPlumbing103/21/2026
Guaranteed Home Improvemespecialty_contractor107/08/2026
Cam Energy Heating & MechanicalPlumbing107/08/2026
Real Deal DecorationGeneral Contractor103/21/2026
Colgate Scaff EquipmentGeneral Contractor103/21/2026
Atlantic ScaffoldingGeneral Contractor106/12/1997
Colgate Scaffolding & EquipmentGeneral Contractor104/29/2008
DNA ContractingGeneral Contractor106/11/2003
Intersystem S&SGeneral Contractor110/04/2017
L & Z ConsultingGeneral Contractor411/14/2016
L & Z RestorationGeneral Contractor111/04/2016
New York RoofscapesGeneral Contractor108/25/2015
Renovation Plus ConstructionGeneral Contractor111/22/2006
Spring ScaffGeneral Contractor105/16/2003
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Socotec Engineering4983207/09/2026
Christian L. Martos Engineering5965107/09/2026
Advanced Engineering1224110/30/2024
Kamen Tall Architects3606109/12/2024
Moore Associates3408308/12/2022
Bazini Engineering1808101/20/2022
New Age Engineering7746112/27/2021
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
11/16/2026
Permit renewed — Sidewalk Shed
Renewed without changes
M01448649-I1-SH
10/06/2026
Permit renewed — Suspended Scaffold
Renewed without changes
M01132744-I1-SC
08/26/2026
Permit issued — Sidewalk Shed
M01448649-I1-SH
08/25/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01448649-I1
133 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY11/16/2026
DOB NOWSuspended ScaffoldPermit IssuedPeaq Restoration10/06/2026
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY08/26/2026
DOB NOWGeneral ConstructionPermit IssuedPeaq Restoration01/29/2026
DOB NOWSidewalk ShedSigned-offPlatinum Services NY12/03/2025
DOB NOWSuspended ScaffoldPermit IssuedPeaq Restoration10/16/2025
DOB NOWGeneral ConstructionPermit IssuedPeaq Restoration02/14/2025
DOB NOWSupported ScaffoldSigned-offPlatinum Services NY12/09/2024
DOB NOWSupported ScaffoldSigned-offPlatinum Services NY12/09/2024
DOB NOWSuspended ScaffoldPermit IssuedPeaq Restoration11/15/2024
DOB NOWSuspended ScaffoldPermit IssuedSkyline Restoration01/12/2024
DOB NOWPlumbingSigned-offZefi Mechanical03/23/2022
DOB NOWPlumbingSigned-offZefi Mechanical03/03/2022
DOB NOWBoiler EquipmentSigned-offCam Energy Heating and Mechanical01/25/2022
DOB NOWPlumbingSigned-offCam Energy Heating & Mechanical01/25/2022
DOB NOWMechanical SystemsSigned-offGuaranteed Home Improveme12/30/2021
DOB NOWPlumbingSigned-offZefi Mechanical11/03/2021
DOB NOWPlumbingSigned-offZefi Mechanical10/23/2020
BISPLISSUEDNew York Standard Mechanical04/18/2018
BISOTISSUEDReal Deal Decoration04/17/2018
BISOTISSUEDJepol Construction02/23/2018
BISEQISSUEDIntersystem S&S10/04/2017
BISEQISSUEDL & Z Consulting11/14/2016
BISEQISSUEDL & Z Restoration11/04/2016
BISOTISSUEDNew York Roofscapes08/25/2015
BISOTISSUEDL & Z Consulting12/23/2014
BISOTISSUEDL & Z Consulting11/19/2014
BISEQISSUEDL & Z Consulting10/03/2014
BISEQISSUEDColgate Scaff & Equipment04/23/2009
BISEQISSUEDColgate Scaffolding & Equipment04/29/2008
BISBLISSUEDAbilene03/08/2007
BISOTISSUEDRenovation-Plus Construction11/22/2006
BISOTISSUEDDNA Contracting06/11/2003
BISEQISSUEDSpring Scaff05/16/2003
BISOTISSUEDGeiger Roofing03/09/2000
BISOTISSUEDGeiger Roofing Company07/01/1997
BISEQISSUEDAtlantic Scaffolding06/12/1997
BISOTISSUEDKay Waterproofing02/15/1995
4 projects · most recent 08/25/2026
General Wiring
FiledStatusContractorScope
08/25/2026Permit IssuedRichard Neu—
12/09/2024CompleteRichard Neu—
12/07/2022CompleteEfco Electrical ServicesGeneral Wiring
03/13/2020Permit IssuedCaputek Electrical Services—
1 project · most recent 07/09/2026
Steel Wood
FiledStatusContractorScope
07/09/2026Permit IssuedPeaq RestorationSteel, Wood
1 project · most recent 08/25/2026
Sidewalk Shed
FiledStatusContractorScope
08/25/2026Permit IssuedPlatinum Services NYSidewalk Shed
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/25/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/18/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/04/2022Pass-Final Boiler Equipment InspectionPassView ↗
02/17/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
07/09/2026Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
06/17/2026Structural Wood FrameChristian Martosprogress
06/17/2026Structural Steel - WeldingChristian Martosspecial
06/16/2026Structural Stability – Alterations of existing buildingsChristian Martosspecial
06/16/2026FinalChristian Martosprogress
06/16/2026Structural Steel - DetailsChristian Martosspecial
09/04/2024Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
09/04/2024MasonryScott Kamenspecial
09/04/2024Energy Code Compliance InspectionsScott Kamenprogress
08/27/2024FinalScott Kamenprogress
08/15/2022Fire-Resistant Penetrations and JointsJAMES MOOREspecial
08/15/2022HVAC insulation and sealingJAMES MOOREenergy_progress
08/15/2022Energy Code Compliance InspectionsJAMES MOOREprogress
08/01/2022HVAC insulation and sealingJAMES MOOREenergy_progress
08/01/2022Energy Code Compliance InspectionsJAMES MOOREprogress
08/01/2022Fire-Resistant Penetrations and JointsJAMES MOOREspecial
222 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account