HPD07/13/2005SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING CHIMNEY, 1ST STORY REAR YARD, ALL STORIES BASEMENT TO ROOF.
ECB04/05/2004FAILURE TO POST CONTRACTORS SIGN NOTED:WORK IN PROGRESS FOR NEW BLDG NUMBER JOB #301075949 AND 301045526,NO CONTRACTORS SIGN POSTED.REMEDY:POST CONTRACTORS SIGN FORTHWITHNothing owed — awaiting certificate of correction
ECB04/17/2003EXPIRED PERMIT(FENCE) UPON INSPECTION AT ABOVE PROPERTY PERMIT FOR FENCE WAS EXPIRED ON 12.31.02 DOB RECORDS SHOWS NO PERMIT HAS BEEN RENEWED. REMEDY:RENEW FENCE PERMITNothing owed — awaiting certificate of correction
ECB01/14/2003EXPIRED PERMIT CONSTRUCTION FENCE IN PLACE AND FENCE PERMIT # 301075958-01 HAS EXPIRED ON 12-31-02 REMEDY : RENEW PERMIT AS PER CODENothing owed — awaiting certificate of correction
ECB06/20/2002FAILURE TO PROVIDE 8'HIGH FENCE WHERE REQUIRED DURING EXCAVATION OPERATIONS AT TIME OF INSPECTION EXCAVATION WAS COMMENDED AND 3'CHAIN LINK WAS PROVIDED ON THE FRONT SIDE AND BACK OF THE CONSTRUCTION SITENothing owed — awaiting certificate of correction
ECB06/20/2002FAILURE TO SAFEGUARD PUBLIC PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS AT TIME OF INSPECTION 9'DEEP EXCAVATION WAS COMMENCED AND FOLLOWINGUNSAFE CONDITION EXISTED FROM 1017 E 89 ST 2 STORIES HOUSE ADJACENT SINothing owed — awaiting certificate of correction
ECB06/20/2002NO DOT PERMIT POSTED (DUMPSTER)AT TIME OF INSPECTION EXCAVATION WAS COMMENCED AND NO DOT PEMIT FOR DUMPSTER ON THE STREET WAS POSTED REMEDY POST DOT PERMIT AS PER CODENothing owed — awaiting certificate of correction
ECB06/20/2002FAILURE TO POST CONTRACTORS SIGN AT TIME OF INSPECTION 9'DEEP EXCAVATION WAS COMMENCED AND NO CONTRACTORS SIGN WAS POSTED REMEDY PROVIDE CONTRACTORS SIGN AS PER CODENothing owed — awaiting certificate of correction