← Back
BuildNYC
Three families
17 CHURCH LANE
BROOKLYN · Canarsie · BIN 3225821
💬 Discuss this project
1899Year Built
2Stories
C0Building Class
R5BZoning
2,522 sfGross Floor Area
3Units
8 Active Violations 1 unresolved · 7 paperwork only ▸FDNY Report ↗
Three families · 8,591 sf lot · 0.29 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing · 20 docs
Floor 2Unit 2A, Unit 2B, Unit 2C +3
Floor 1Unit 1A, Unit 1B, Unit 1C +31 filing · 20 docs
Filed — no permit issued29p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1978 Needham Ave610/13/2026
▾Design Consultants (Architect / Engineer of Record)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Blaze ElectricElectrical203/21/2026
AmericaGeneral Contractor103/21/2026
Ave Rexy RealtyGeneral Contractor103/21/2026
Dave Rexy RealtyGeneral Contractor103/21/2026
Building Lifecycle
10/22/2026
Objection raised — Other
10/19/2026
Objection raised — Other
10/12/2026
Filed — New Building
PROPOSED NEW 4 STORY RESIDENTIAL BUILDING
B01379312-P2
10/12/2026
Special inspection requirement — Mechanical Systems
10/12/2026
Special inspection requirement — Post-installed Anchors
76 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 10/12/2026
Heating and Air Conditioning Systems
FiledStatusContractorScope
10/12/2026——Heating and Air Conditioning Systems
1 project · most recent 10/12/2026
Sprinkler System
FiledStatusContractorScope
10/12/2026——Sprinkler System
1 project · most recent 10/12/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/12/2026——Gas, Storm, Water/Sanitary
1 project · most recent 10/12/2026
Steel Concrete
FiledStatusContractorScope
10/12/2026——Steel, Concrete
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
10/12/2026Mechanical Systems—special
10/12/2026Post-installed Anchors—special
10/12/2026Energy Code Compliance Inspections—progress
10/12/2026Fire-Resistant Penetrations and Joints—special
10/12/2026Final—progress
09/24/2026Structural Stability – Alterations of existing Buildings—special
09/24/2026Demolition—special
07/28/2026Sprinkler Systems—special
07/28/2026Post-installed Anchors—special
07/28/2026Fire-Resistant Penetrations and Joints—special
07/15/2026Fire-Resistant Penetrations and Joints—special
07/15/2026Maintenance information—energy_progress
07/15/2026HVAC-R and service water heating system controls—energy_progress
07/15/2026HVAC-R and service water piping design and insulation—energy_progress
07/15/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
07/15/2026HVAC-R and service water heating equipment—energy_progress
06/23/2026HVAC-R and service water heating system controls—energy_progress
06/23/2026Post-installed Anchors—special
06/23/2026Fire-Resistant Penetrations and Joints—special
06/23/2026Maintenance information—energy_progress
06/23/2026Shutoff dampers—energy_progress
06/23/2026HVAC-R and service water heating equipment—energy_progress
06/23/2026HVAC-R and service water piping design and insulation—energy_progress
06/23/2026Duct leakage testing, insulation and design—energy_progress
06/23/2026Final—progress
Latest 25 of 51.
37 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account