← Back
Office with commercial, 7-19 stories
17 EAST 48 STREET
MANHATTAN · Midtown-Times Square · BIN 1035435
💬 Discuss this project
1915Year Built
9Stories
O6Building Class
C5-2.5Zoning
18,562 sfGross Floor Area
9Units
0 Open ViolationsFISP: SAFE
Office with commercial, 7-19 stories · Owner of record: RLC PROPERTIES INC · 2,500 sf lot · 7.42 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
Floor 2Under Construction13p · 1 filing · 20 docs
Floor 1Under Construction20p · 2 filings · 20 docs
CellarUnder Construction6p · 2 filings · 6 docs
Site & exterior3p · 1 filing · 2 docs
Filed — no permit issued7p · 4 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RLC PROPERTIES2903/22/2026
GUL & G CONTRACTING INC503/22/2026
HATSUHANA403/21/2026
ARIC PROPERTY303/21/2026
R L PROPERTIES103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RHL ENGINEERING107/01/2026
EMTG CONSULTANTS INC405/20/2026
YUUKI KITADA ARCHITECT105/11/2026
MET DESIGN101/20/2026
ASHRAF CORP105/07/2021
Z.S. ENGINEERING, D.P.C.107/27/2020
E4P CONSULTING ENGINEERING PLLC101/02/2020
HSU & ASSOCIATES102/15/2019
BAILEYS ENGINEERING PC106/20/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW APPROACH CONSULTING203/21/2026
CONVERSANO ASSOCIATES, INC.203/21/2026
DANICO SERVICES203/21/2026
Z.S. ENGINEERING, D.P.C.103/21/2026
PROJECT ENTRY103/21/2026
AE DESIGN SOLUTION203/21/2026
Z S ENGINEERING D P C103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GUL & G CONTRACTING INCGeneral Contractor303/21/2026
PEPAJ CONSTRUCTION CORPGeneral Contractor107/08/2026
BOARDWALK PLBNG & HTG INCFire Protection107/08/2026
BEST PBG HTG & COOL INCPlumbing107/28/2026
CARA PLUMBING GROUP INCPlumbing107/08/2026
NORTHEAST PLBG & HTG CORPPlumbing107/08/2026
YT RESOLUTION SERVICS LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RHL ENGINEERING, LLC712107/01/2026
MEP INSPECTIONS, INC1102305/20/2026
Building Lifecycle
All (127)Filed (12)Permit Issued (7)Signed Off (1)Facade (FISP) (15)Violation (55)Inspection (3)Objection (21)Special Inspection (13)
07/27/2026
Permit issued — Plumbing
M01418909-I1-PL
07/01/2026
Filed — Alteration
Re-activation of an existing natural gas service serving (1) commercial kitchen. Reactivation includes the testing of existing-to-remain gas piping and utility service meter replacement. No change in egress, use or occupancy.
M01418909-I1
07/01/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vincent Gentile
06/10/2026
Permit issued — Sprinklers
M01252203-S1-EW-SP
05/27/2026
Permit issued — Plumbing
M01252203-S2-PL
05/27/2026
Permit issued — Mechanical Systems
M01252203-S3-MS
05/20/2026
Filed — Alteration
Herewith filing for related plumbing work as per the drawings. Replacing (2) Lavs, (2) WC & (1) Urinal on existing roughing on 2nd Fl. Install (1) New Lav and (1) WC on 1st floor , No change in use, egress or occupancy.
M01252203-P1
05/20/2026
Permit issued — General Construction
M01252203-I1-GC
05/20/2026
Special inspection requirement — Sprinkler Systems
Nicolas Crosetto
05/20/2026
Special inspection requirement — Post-installed Anchors
Nicolas Crosetto
05/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Crosetto
05/19/2026
Filed — Alteration
Herewith filing for related plumbing work as per the drawings. Replacing (2) Lavs, (2) WC & (1) Urinal on existing roughing on 2nd Fl. Install (1) New Lav and (1) WC on 1st floor , No change in use, egress or occupancy.
M01252203-S3
05/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Crosetto
05/18/2026
Special inspection requirement — Post-installed Anchors
Nicolas Crosetto
05/18/2026
Special inspection requirement — Sprinkler Systems
Nicolas Crosetto
05/14/2026
Filed — Alteration
Herewith filing for related plumbing work as per the drawings. Replacing (2) Lavs, (2) WC & (1) Urinal on existing roughing on 2nd Fl. Install (1) New Lav and (1) WC on 1st floor , No change in use, egress or occupancy.
M01252203-S2
05/12/2026
Filed — Alteration
Herewith filing for related plumbing work as per the drawings. Replacing (2) Lavs, (2) WC & (1) Urinal on existing roughing on 2nd Fl. Install (1) New Lav and (1) WC on 1st floor , No change in use, egress or occupancy.
M01252203-S1
05/11/2026
Filed — Alteration
Herewith filing for related plumbing work as per the drawings. Replacing (2) Lavs, (2) WC & (1) Urinal on existing roughing on 2nd Fl. Install (1) New Lav and (1) WC on 1st floor , No change in use, egress or occupancy.
M01252203-I1
01/20/2026
Filed — No Work
M01307952-I1
10/23/2025
Special inspection requirement — Public Assembly Emergency Lighting
Shahram Lotfi
07/08/2025
Special inspection requirement — Energy Code Compliance Inspections
Nicolas Crosetto
07/07/2025
Special inspection requirement — Final
yuuki kitada
07/07/2025
Special inspection requirement — Final
Shahram Lotfi
07/07/2025
Special inspection requirement — Mechanical Systems
Nicolas Crosetto
01/11/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/10/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/13/2023
Permit issued — Plumbing
M00373424-I1-PL
08/31/2023
Signed off — Alteration
M00517879-I1
04/21/2023
Violation issued (ECB, closed)
Construction
12/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/03/2021
Cycle 9 facade report submitted
10/03/2021
Cycle 9 facade report signed — SAFE
09/13/2021
Cycle 9 facade inspection completed
05/07/2021
Filed — Alteration
M00517879-I1
05/07/2021
Permit issued — Sidewalk Shed
M00517879-I1-SH
03/30/2021
Violation issued (ECB, closed)
Construction
12/04/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/27/2020
Filed — Alteration
Installation of a new water service in connection with approved sprinkler system 123664392
M00373424-I1
04/21/2020
Violation issued (ECB, closed)
Construction
03/12/2020
Violation issued (ECB, closed)
Elevators
01/23/2020
Objection resolved — Addressed
01/23/2020
Objection resolved — Addressed
01/23/2020
Objection resolved — Addressed
01/23/2020
Objection resolved — Addressed
01/23/2020
Objection resolved — Addressed
01/07/2020
Objection raised — Fire_Protection
01/07/2020
Objection raised — Admin
01/07/2020
Objection raised — Zoning
01/07/2020
Objection raised — Zoning
01/07/2020
Objection raised — Inspections
01/02/2020
Filed — Alteration
PROPOSE TO INSTALL EMERGENCY GENERATOR WITH 192 GAL DAY TANK ON ROOF. NO CHANGE TO USE, EGRESS AND OCCUPANCY.
M00269492-I1
12/16/2019
Violation issued (ECB, closed)
Construction
11/18/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/18/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/03/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/26/2019
Objection raised — Fire_Protection
02/26/2019
Objection raised — Scope
02/26/2019
Objection raised — Inspections
Latest 60 of 127 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedBEST PBG HTG & COOL INC07/27/2026
DOB NOWSprinklersPermit IssuedBOARDWALK PLBNG & HTG INC06/10/2026
DOB NOWPlumbingSigned-offCARA PLUMBING GROUP INC05/27/2026
DOB NOWMechanical SystemsSigned-offPEPAJ CONSTRUCTION CORP05/27/2026
DOB NOWGeneral ConstructionSigned-offYT RESOLUTION SERVICS LLC05/20/2026
DOB NOWPlumbingSigned-offNORTHEAST PLBG & HTG CORP12/13/2023
DOB NOWSidewalk ShedSigned-offGUL & G CONTRACTING INC05/07/2021
BISSPISSUEDJ. CAIAZZO PLBG & HTG CORP09/25/2023
BISOTISSUEDSKYWAY REST. SERVICES04/30/2022
BISSPISSUEDJ. CAIAZZO PLBG & HTG CORP04/26/2022
BISOTISSUEDLODIN INC08/19/2020
BISFPISSUEDWILLIAM HIRD & CO INC07/17/2018
BISOTISSUEDNATIONAL ALLIANCE NY LLC07/11/2018
BISPLISSUEDRRP PLUMBING CORP06/05/2018
BISOTISSUEDDONE RIGHT HOOD & FIRE SA02/27/2018
BISEQISSUEDARSENAL SCAFFOLD INC01/08/2018
BISOTISSUEDPRO TECH WATERPROOFING CO09/27/2017
BISOTISSUEDASN CONST & RENOV INC08/23/2017
BISOTISSUEDPRO TECH WATERPROOFING CO07/25/2017
BISEQISSUEDARSENAL SCAFFOLD INC07/13/2017
BISEQISSUEDARSENAL SCAFFOLD INC03/10/2017
BISOTISSUEDNATIONAL ALLIANCE NY LLC04/13/2016
BISOTISSUEDA&Z PAINTING CONT. CORP08/03/2015
BISFPISSUEDMASTER FIRE SYSTEMS, INC12/31/2014
BISEQISSUEDEVEREST SCAFFOLDING INC04/08/2009
BISOTISSUEDPRO TECH WATERPROOFING CO12/02/2008
BISOTISSUEDPRO TECH WATERPROOFING CORP09/22/2008
BISOTISSUEDROCKLEDGE SCAFFOLD CORP09/15/2008
BISEQISSUEDEVEREST SCAFFOLDING INC07/24/2008
BIS—ISSUEDNISHAN BALIKJIAN P.C.06/09/2005
BIS—ISSUEDJOHN NOGATECH PE09/12/2003
BISMHISSUEDNAYSO INC.06/14/2001
BISFPISSUEDIDEAL FIRE CONTROL INC06/24/1998
BISFPISSUEDMETFLOW FIRE CONTROL LLC07/15/1994
BISOTISSUEDTKI USA INC06/24/1994
BISOTISSUEDRIAL BROS LTD05/18/1993
BISPLISSUEDN.K.PLUMBING & HEATING01/28/1993
BISOTISSUEDKLATZ METAL FABRICATORS INC10/02/1992
BISMHISSUEDKLATZ METAL FABRICATORS INC10/02/1992
BISFPISSUEDPROTECTION SYST SPECILAIST INC05/28/1992
+ 3 more permits on file
1 project · most recent 01/02/2020
Generators Others
FiledStatusContractorScopeMake / Model / Capacity
01/02/2020——Generators, Others
Generators
Kohler 100REOZJ4 Generator ×1
1 project · most recent 05/20/2026
FiledStatusContractorScope
05/20/2026Permit IssuedEBM PLUMBING CORP5 heads
2 projects · most recent 07/01/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/01/2026Permit IssuedBEST PBG HTG & COOL INCGas
05/20/2026Signed-offCARA PLUMBING GROUP INCWater/Sanitary
6 projects · most recent 06/04/2026
General Wiring
FiledStatusContractorScope
06/04/2026CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
10/17/2021Permit IssuedE & M ELECTRICAL NY CORPGeneral Wiring
06/02/2021Permit IssuedWCK ELECTRIC CORP.—
10/30/2020Permit IssuedBRANDL ELECTRIC INC.General Wiring
03/11/2020Permit IssuedE & M ELECTRICAL NY CORPGeneral Wiring
03/04/2020Permit IssuedE & M ELECTRICAL NY CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/01/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/11/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/10/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
06/18/2026Fire-Resistant Penetrations and JointsVincent Gentilespecial
05/20/2026Sprinkler SystemsNicolas Crosettospecial
05/20/2026Post-installed AnchorsNicolas Crosettospecial
05/20/2026Fire-Resistant Penetrations and JointsNicolas Crosettospecial
05/18/2026Fire-Resistant Penetrations and JointsNicolas Crosettospecial
05/18/2026Post-installed AnchorsNicolas Crosettospecial
05/18/2026Sprinkler SystemsNicolas Crosettospecial
10/23/2025Public Assembly Emergency LightingShahram Lotfiprogress
07/08/2025Energy Code Compliance InspectionsNicolas Crosettoprogress
07/07/2025Finalyuuki kitadaprogress
07/07/2025FinalShahram Lotfiprogress
07/07/2025Mechanical SystemsNicolas Crosettospecial
02/11/2019Public Assembly Emergency LightingChih Hsuprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Hatsuhana Sushi RestaurantRestaurant / Food ServiceCellar, Floors 1, 2
Project M01418909 Alteration · Permit Entire · 07/01/2026
Project M01252203 Alteration · Permit Entire · 05/11/2026
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 298 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch8
09/06/2026M00050309-I1Request digital key ↗
09/03/2026M00517879-I1Request digital key ↗
08/17/2026M01252203-S2Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
08/19/2026M01307952-I1Request digital key ↗
08/15/2026M00129626-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/14/2026M00269492-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00373424-I1Request digital key ↗
▸Applications & Permits58
▸BISPLAN / WORK APPROVAL APPLICATION33
01/27/2022140926611Open ↗
01/25/2022140926611Open ↗
08/03/2020140926611Open ↗
Showing 3 of 33 on file for this type
▸BISWORK PERMIT APPLICATION20
04/30/2022140926611Open ↗
04/26/2022123664392Open ↗
11/06/2019123664392Open ↗
Showing 3 of 20 on file for this type
▸BISPLACE OF ASSEMBLY5
06/23/2016122721395Open ↗
06/21/2016122721395Open ↗
06/06/2016122721395Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications73
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION23
02/03/2020140614039Open ↗
10/28/2019123664392Open ↗
10/23/2019123664392Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/06/2026M00050309-I1Open ↗
09/03/2026M00517879-I1Open ↗
08/19/2026M01307952-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
05/31/2018123236480Open ↗
02/28/2018123354146Open ↗
07/12/2017140667464Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
05/31/2018123236480Open ↗
02/28/2018123354146Open ↗
05/23/2016122721395Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
07/28/2020140919914Open ↗
07/12/2017140667464Open ↗
05/31/2017140640732Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/02/2026M01252203-I1Open ↗
09/02/2026M01252203-S3Open ↗
09/02/2026M01252203-S3Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
07/12/2017140667464Open ↗
05/31/2017140640732Open ↗
03/08/2017140614039Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026M01252203-S3Open ↗
09/01/2026M01252203-P1Open ↗
08/29/2026M01418909-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
02/20/2015122228614Open ↗
Showing 1 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
08/03/2020140926611Open ↗
07/28/2020140919914Open ↗
▸Trade Schedules & Equipment12
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
06/13/2019123664392Open ↗
01/25/2019123664392Open ↗
06/25/2018123354146Open ↗
Showing 3 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
01/07/2025123249760Open ↗
06/05/2019123103685Open ↗
Showing 2 of 4 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL2
08/01/2019123664392Open ↗
08/01/2019123664392Open ↗
▸Environmental & Asbestos28
▸BISASBESTOS: CERTIFICATION (DEP ACP5)12
08/03/2020140926611Open ↗
07/28/2020140919914Open ↗
01/25/2019123664392Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/17/2026M01252203-S1Open ↗
08/17/2026M01252203-I1Open ↗
08/17/2026M01252203-P1Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
08/03/2020140926611Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
06/11/2018140640732Open ↗
05/31/2018123236480Open ↗
02/28/2018123354146Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
08/13/2020140919914Open ↗
08/03/2020140926611Open ↗
07/28/2020140919914Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
10/13/2023140926611Open ↗
06/11/2018140640732Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
07/28/2020140919914Open ↗
05/31/2017140640732Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
10/13/2023140926611Open ↗
09/21/2020140919914Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/24/2020140919914Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
03/08/2017140614039Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY13
10/26/2023140926611Open ↗
10/17/2023123664392Open ↗
10/13/2023123664392Open ↗
Showing 3 of 13 on file for this type
▸BISSTRUCTURAL STEEL - WELDING1
09/21/2020140919914Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
08/18/2020140919914Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
08/18/2020140919914Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
08/18/2020140919914Open ↗
▸Approvals, Objections & Sign-offs22
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
08/15/2025123249760Open ↗
01/05/2024123664392Open ↗
10/26/2023140926611Open ↗
Showing 3 of 14 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
07/15/2019123664392Open ↗
01/10/2018140614039Open ↗
Showing 2 of 3 on file for this type
▸BISFINAL1
08/18/2020140919914Open ↗
▸Cost, Insurance & Ownership26
▸BISCOST AFFIDAVIT23
10/26/2023140926611Open ↗
10/13/2023123664392Open ↗
08/03/2020140926611Open ↗
Showing 3 of 23 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
08/13/2025123249760Open ↗
12/20/2023123664392Open ↗
09/24/2020140919914Open ↗
▸Filing & Intake Forms30
▸BISEFILING COVER SHEET10
01/25/2019123664392Open ↗
01/23/2019123249760Open ↗
05/31/2018123236480Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM9
04/26/2022123664392Open ↗
02/03/2020140614039Open ↗
10/22/2019123664392Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
08/03/2020140926611Open ↗
07/28/2020140919914Open ↗
07/12/2017140667464Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION4
01/31/2022140926611Open ↗
09/23/2020140926611Open ↗
06/06/2018140614039Open ↗
Showing 3 of 4 on file for this type
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
05/09/2019123664392Open ↗
Showing 1 of 3 on file for this type