← Back
BuildNYC
Elevator cooperative
17 EAST 96TH STREET
MANHATTAN · BIN 1051441
💬 Discuss this project
1924Year Built
16Stories
D4Building Class
R10Zoning
85,290 sfGross Floor Area
67Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: 17 E 96th Owners · 8,578 sf lot · 9.94 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
BulkheadOrsid Realty Corp1p · 1 filing · 2 docs
Floor 16Unit 16A2p · 1 filing · 20 docs
Floor 15Unit 15B3p · 1 filing · 9 docs
Floor 14
Floor 13
Floor 12Unit 12B7p · 2 filings · 12 docs
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4Unit 4B6p · 1 filing · 11 docs
Floor 3
Floor 2Unit 2B4p · 2 filings · 11 docs
Floor 1
CellarNew drain lines and sump pump installation in cellar4p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
17 East 96th Owners2603/22/2026
17 East 96th Street Owners1303/21/2026
Phoenix403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kelley Design205/20/2025
A2 Architect209/09/2024
Meszaros Engineering204/13/2022
Studio Parallel204/26/2021
Brendan Kelly204/08/2021
Joon Architecture and Design407/22/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Noel Building Consulting203/21/2026
J A Expediting403/21/2026
Skyline Access103/21/2026
Meszaros Engineering403/21/2026
Progeny Management & Expediting Services203/21/2026
Code403/21/2026
Mbe Code Zoning403/21/2026
K M DOB Consulting803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Azcc BuildersGeneral Contractor407/08/2026
P.S. Marcato Elev. CoElectrical203/21/2026
Avon Plumbing & HeatingPlumbing207/08/2026
Master 2 Plumbing & HeatingPlumbing207/08/2026
High Volt Electric Corp ofElectrical103/21/2026
QNCC Electrical ContractingElectrical103/21/2026
Marks ElectricElectrical103/22/2026
Outfront MediaElectrical103/21/2026
W 8 ElectricElectrical103/21/2026
Sunbird Electrical ContractingElectrical103/22/2026
Adriatic Plumbing & Heatingspecialty_contractor107/08/2026
DomaGeneral Contractor107/08/2026
Gaudioso ContractingGeneral Contractor107/08/2026
L & N Construction InteriGeneral Contractor107/08/2026
Adriatic Plumbing & HeatingPlumbing107/08/2026
Aspect Plumbing & Heating CoPlumbing107/08/2026
Dunrite ElectricalElectrical103/22/2026
Nice PlumbingPlumbing107/08/2026
Ankh Electrical ContractorsElectrical103/21/2026
Elpo Electrical ContgElectrical103/21/2026
K & G Electric CoElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Erik Sun, Architect3010105/20/2025
A2 Architect2504209/09/2024
Meszaros Engineering963204/13/2022
Architecture and5545204/08/2021
Building Lifecycle
All (171)Filed (15)Permit Issued (14)Signed Off (9)Facade (FISP) (12)Violation (60)Inspection (10)Objection (36)Special Inspection (15)
08/11/2026
Signed off — Alteration
RENOVATION OF KITCHEN AND 1.5 BATHROOMS WITH MINOR PARTITION WORK. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
M01211267-I1
07/07/2026
Signed off — Alteration
RENOVATION OF KITCHEN AND 1.5 BATHROOMS WITH MINOR PARTITION WORK. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
M01211267-S1
11/26/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/05/2025
Permit issued — Plumbing
M01211267-S1-PL
08/20/2025
Objection resolved — Addressed
08/20/2025
Objection resolved — Addressed
08/06/2025
Permit issued — General Construction
M01211267-I1-GC
07/10/2025
Objection resolved — Addressed
06/24/2025
Objection resolved — Addressed
06/24/2025
Objection resolved — Addressed
06/09/2025
Special inspection requirement — Lighting in dwelling units
Beth Kelley
06/03/2025
Objection raised — Cost
06/03/2025
Objection raised — Scope
06/03/2025
Objection raised — Structural
05/23/2025
Objection raised — Inspections
05/23/2025
Objection raised — Fire_Protection
05/20/2025
Filed — Alteration
RENOVATION OF KITCHEN AND 1.5 BATHROOMS WITH MINOR PARTITION WORK. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
M01211267-I1
05/20/2025
Filed — Alteration
RENOVATION OF KITCHEN AND 1.5 BATHROOMS WITH MINOR PARTITION WORK. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
M01211267-S1
05/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIK SUN
04/30/2025
Special inspection requirement — Final
ERIK SUN
02/07/2025
Signed off — Alteration
M00677608-I1
02/07/2025
Signed off — Alteration
GENERAL CONSTRUCTION FOR THE INSTALLATION OF NEW DRAIN LINES AND INSTALLATION OF NEW SUMP PUMP IN CELLAR. INSTALLATION OF PIPE SUPPORTS AND FIRE STOPPING. NO CHANGE IN EGRESS OR OCCUPANCY.
M00677540-I1
10/04/2024
Permit issued — General Construction
M01084917-I1-GC
09/23/2024
Objection raised — Admin
09/23/2024
Objection resolved — Addressed
09/09/2024
Filed — Alteration
M01084917-I1
09/09/2024
Filed — Alteration
M01084917-S1
07/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
02/21/2024
Cycle 9 facade report submitted
02/21/2024
Cycle 9 facade report signed — SWARMP
02/13/2024
Cycle 9 facade inspection completed
01/05/2024
Permit issued — Suspended Scaffold
M00967873-I1-SC
12/20/2023
Objection raised — Other
12/20/2023
Objection resolved — Addressed
12/07/2023
Filed — Alteration
IRA for FISP
M00967873-I1
11/30/2023
Signed off — Alteration
INTERIOR RENOVATION OF APT2B ON THE 2ND FLOOR OF EXISTING RESIDENTIAL BUILDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00485203-I1
11/30/2023
Signed off — Alteration
PL WORK FILED IN CONJUNCTION WITH ARCHITECTURAL JOB #M00485203-I1. Modification of plumbing fixtures at existing apartment 2B on floor 002. Plumbing work. There is to be no change of use, occupancy, or egress.
M00482372-I1
09/22/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/04/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/04/2023
Permit issued — Plumbing
M00482372-I1-PL
12/06/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/25/2022
Signed off — Alteration
REM:1 WC. REL:1 SINK & 1 DW.REP: 1 GAS RANGE, 1 WC, 1 TUB&1 LAV ON EXISTING ROUGHING. INSTALL NEW: 1 WM, 1 ELECTRIC DRYER, 1 LAV, 1 WC, 1 SHOWER, 1 SANITARY PIPING&1 WATER PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00483330-I1
05/20/2022
Signed off — Alteration
M00483303-I1
05/17/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/17/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/07/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/27/2022
Permit issued — General Construction
M00677540-I1-GC
04/27/2022
Permit issued — Plumbing
M00677608-I1-PL
04/13/2022
Filed — Alteration
M00677608-I1
04/13/2022
Filed — Alteration
GENERAL CONSTRUCTION FOR THE INSTALLATION OF NEW DRAIN LINES AND INSTALLATION OF NEW SUMP PUMP IN CELLAR. INSTALLATION OF PIPE SUPPORTS AND FIRE STOPPING. NO CHANGE IN EGRESS OR OCCUPANCY.
M00677540-I1
03/30/2022
Permit issued — General Construction
M00483303-I1-GC
03/25/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/22/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/21/2022
Special inspection requirement — Preliminary
Christian Meszaros
03/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christian Meszaros
03/10/2022
Special inspection requirement — Post-installed Anchors
Christian Meszaros
02/09/2022
Special inspection requirement — Final
Christian Meszaros
02/04/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/21/2021
Permit issued — General Construction
M00485203-I1-GC
Latest 60 of 171 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAspect Plumbing & Heating Co09/05/2025
DOB NOWGeneral ConstructionSigned-offGaudioso Contracting08/06/2025
DOB NOWGeneral ConstructionPermit IssuedL & N Construction Interi10/04/2024
DOB NOWSuspended ScaffoldPermit IssuedSkyline Restoration01/05/2024
DOB NOWPlumbingSigned-offMaster 2 Plumbing & Heating04/04/2023
DOB NOWGeneral ConstructionSigned-offAdriatic Plumbing Heating04/27/2022
DOB NOWPlumbingSigned-offAdriatic Plumbing & Heating04/27/2022
DOB NOWGeneral ConstructionSigned-offAzcc Builders03/30/2022
DOB NOWGeneral ConstructionSigned-offDoma12/21/2021
DOB NOWPlumbingSigned-offMaster 2 Plumbing & Heating12/21/2021
DOB NOWPlumbingSigned-offNice Plumbing06/30/2021
DOB NOWGeneral ConstructionSigned-offAzcc Builders06/17/2021
DOB NOWPlumbingSigned-offAvon Plumbing & Heating12/15/2020
DOB NOWPlumbingSigned-offAvon Plumbing & Heating02/05/2020
BISOTISSUEDKD One Construction01/02/2020
BISOTISSUEDVella Interiors11/30/2019
BISMHISSUEDVella Interiors10/16/2019
BISOTISSUEDPark East Development09/06/2019
BISPLISSUEDAdriatic Plumbing & Heating08/14/2019
BISPLISSUEDP.S.I. Mechanical01/26/2018
BISOTISSUEDL & Z Restoration06/02/2017
BISEQISSUEDPhoenix Sutton STR05/23/2017
BISPLISSUEDAccurate Mechanical01/24/2017
BISPLISSUEDP.S.I. Mechanical12/16/2016
BISOTISSUEDKurti Construction12/08/2016
BISMHISSUEDKurti Construction12/08/2016
BISOTISSUEDP.S.R. Construction/Renovation11/04/2016
BISEQISSUEDPhoenix Sutton STR04/05/2016
BISPLISSUEDFleet Plumbing and Heating06/11/2015
BISOTISSUEDLaile06/10/2015
BISPLISSUEDOrbit Plumbing & Heating03/23/2015
BISOTISSUEDGBG Development03/05/2015
BISPLISSUEDDonato09/26/2014
BISOTISSUEDMakeover Construction06/18/2014
BISPLISSUEDFleet Plumbing and Heating06/12/2014
BISOTISSUEDLaile06/09/2014
BISEQISSUEDPhoenix Sutton STR01/14/2014
BISPLISSUEDDonato09/18/2013
BISMHISSUEDMakeover Construction09/06/2013
BISOTISSUEDMakeover Construction09/06/2013
+ 24 more permits on file
1 project · most recent 05/20/2025
Gas Water/Sanitary
FiledStatusContractorScope
05/20/2025Signed-offAspect Plumbing & Heating CoGas, Water/Sanitary
13 projects · most recent 04/21/2026
General Wiring
FiledStatusContractorScope
04/21/2026CompleteVertex Electric—
11/30/2025Permit IssuedW 8 ElectricGeneral Wiring
08/08/2025CompleteSunbird Electrical ContractingGeneral Wiring
02/22/2025CompleteJte Electrical ServicesGeneral Wiring
01/17/2024CompleteAccurate ElectricalGeneral Wiring
11/01/2022CompleteLuna NYC ElectricGeneral Wiring
02/28/2022CompleteAccurate ElectricalGeneral Wiring
06/28/2021Permit IssuedFalco Electrical ServicesGeneral Wiring
03/04/2020CompleteMarks ElectricGeneral Wiring
01/17/2020Permit IssuedAsko Electric Construction & MaintenanceGeneral Wiring
10/07/2019CompleteDunrite ElectricalGeneral Wiring
07/23/2019CompleteMichael Brothers ElectricGeneral Wiring
02/06/2019Permit IssuedDunrite ElectricalGeneral Wiring
1 project · most recent 12/07/2023
FiledStatusContractorScope
12/07/2023Permit Issued——
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
11/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/22/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/04/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/06/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/17/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/17/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/07/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/25/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/22/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/04/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
06/09/2025Lighting in dwelling unitsBeth Kelleyenergy_progress
05/19/2025Fire-Resistant Penetrations and JointsERIK SUNspecial
04/30/2025FinalERIK SUNprogress
07/23/2024Fire-Resistant Penetrations and JointsAnn Macklinspecial
03/21/2022PreliminaryChristian Meszarosprogress
03/10/2022Fire-Resistant Penetrations and JointsChristian Meszarosspecial
03/10/2022Post-installed AnchorsChristian Meszarosspecial
02/09/2022FinalChristian Meszarosprogress
03/12/2021Fire-Resistant Penetrations and JointsBrendan Kellyspecial
03/12/2021Fire-Resistant Penetrations and JointsBrendan Kellyspecial
03/12/2021FinalBrendan Kellyprogress
03/09/2021Energy Code Compliance InspectionsCHRISTOPHER METZprogress
03/09/2021Fire-Resistance Rated ConstructionCHRISTOPHER METZprogress
03/09/2021FinalCHRISTOPHER METZprogress
03/09/2021Lighting in dwelling unitsCHRISTOPHER METZenergy_progress
▾Documents — 503 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch11
09/03/2026M00483330-I1Request digital key ↗
09/03/2026M00483303-I1Request digital key ↗
09/02/2026M00677608-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/05/2026M00280983-P2Request digital key ↗
09/05/2026M00280983-P3Request digital key ↗
08/15/2026M00280983-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits95
▸BISPLAN / WORK APPROVAL APPLICATION45
09/07/2022140869870Open ↗
07/07/2022140834916Open ↗
07/07/2022140856759Open ↗
Showing 3 of 45 on file for this type
▸BISWORK PERMIT APPLICATION37
01/02/2020123848202Open ↗
11/30/2019140869870Open ↗
10/16/2019140856759Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWLPC Approval/Permit13
09/05/2026M00280983-P3Open ↗
09/05/2026M00280983-P2Open ↗
08/15/2026M00280983-P1Open ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications76
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION39
01/02/2020123848202Open ↗
01/02/2020123848202Open ↗
12/05/2019123848202Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/05/2026M00280983-P3Open ↗
09/05/2026M00280983-I1Open ↗
09/05/2026M00280983-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/22/2026M00483303-I1Open ↗
09/22/2026M00483303-I1Open ↗
09/22/2026M00483303-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026M00482372-I1Open ↗
08/28/2026M00485203-I1Open ↗
08/27/2026M01211267-I1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
10/22/2019140869870Open ↗
07/30/2019140856759Open ↗
03/05/2019140834916Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment36
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE18
09/06/2019123733273Open ↗
06/26/2019123517612Open ↗
05/22/2019123733273Open ↗
Showing 3 of 18 on file for this type
▸BISSELF-CERT PLUMBING NOTICE12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING6
03/05/2019140834916Open ↗
Showing 1 of 6 on file for this type
▸Safety & Tenant Protection12
▸BISTenant Protection Plan and Notes8
12/05/2019123848202Open ↗
06/26/2019123517612Open ↗
04/25/2019123733273Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWTenant Protection Plan4
09/05/2026M00280983-P2Open ↗
09/05/2026M00280983-P3Open ↗
08/15/2026M00280983-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos34
▸BISASBESTOS: CERTIFICATION (DEP ACP5)17
12/05/2019123848202Open ↗
11/18/2019140869870Open ↗
10/22/2019140869870Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
09/05/2026M00280983-P3Open ↗
09/05/2026M00280983-P2Open ↗
09/02/2026M00677608-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
03/05/2019140834916Open ↗
▸Energy Compliance42
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS15
12/05/2019123848202Open ↗
07/19/2019123733273Open ↗
06/17/2019123733273Open ↗
Showing 3 of 15 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
01/29/2021123848202Open ↗
07/14/2020123733273Open ↗
10/24/2018122406734Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
01/29/2021123848202Open ↗
07/14/2020123733273Open ↗
11/21/2019140869870Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)4
08/29/2022140856759Open ↗
08/25/2022140869870Open ↗
08/17/2022140834916Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BIS* DUCT LEAKAGE TESTING1
08/29/2022140856759Open ↗
▸BISLIGHTING IN DWELLING UNITS1
01/29/2021123848202Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/29/2022140856759Open ↗
▸BIS* HVAC INSULATION AND SEALING1
08/29/2022140856759Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00483303-I1Open ↗
▸Inspections & Test Reports22
▸BISTECHNICAL REPORT: RESPONSIBILITY16
01/29/2021123848202Open ↗
01/29/2021123848202Open ↗
08/20/2020123517612Open ↗
Showing 3 of 16 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)3
08/25/2022140869870Open ↗
08/17/2022140834916Open ↗
07/08/2020123517612Open ↗
▸BISMECHANICAL SYSTEMS2
08/29/2022140856759Open ↗
08/29/2022140856759Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
08/17/2022140834916Open ↗
▸Approvals, Objections & Sign-offs69
▸BISLANDMARKS APPROVAL25
06/15/2020123733273Open ↗
06/15/2020123733273Open ↗
01/06/2020123848202Open ↗
Showing 3 of 25 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST21
09/07/2022140869870Open ↗
08/29/2022140856759Open ↗
08/18/2022140834916Open ↗
Showing 3 of 21 on file for this type
▸BISFINAL6
08/29/2022140856759Open ↗
08/25/2022140869870Open ↗
08/17/2022140834916Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
11/21/2019140869870Open ↗
Showing 1 of 5 on file for this type
▸BISLANDMARKS SIGNOFF4
08/29/2022140856759Open ↗
08/25/2022140869870Open ↗
08/18/2022140834916Open ↗
Showing 3 of 4 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
05/18/2018122857710Open ↗
Showing 1 of 2 on file for this type
▸BISSHED LETTER1
06/15/2017140478178Open ↗
▸Cost, Insurance & Ownership41
▸BISCOST AFFIDAVIT35
01/29/2021123848202Open ↗
07/14/2020123733273Open ↗
12/05/2019123848202Open ↗
Showing 3 of 35 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW35
08/29/2022140856759Open ↗
08/25/2022140869870Open ↗
08/17/2022140834916Open ↗
Showing 3 of 5 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms54
▸BISADDITIONAL INFORMATION27
06/15/2020123733273Open ↗
06/15/2020123733273Open ↗
11/21/2019140869870Open ↗
Showing 3 of 27 on file for this type
▸BISEFILING COVER SHEET12
12/05/2019123848202Open ↗
06/26/2019123517612Open ↗
04/25/2019123733273Open ↗
Showing 3 of 12 on file for this type
▸BISBOROUGH INTAKE FORM8
11/14/2019123517612Open ↗
10/01/2019123733273Open ↗
09/06/2019123733273Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
10/22/2019140869870Open ↗
07/30/2019140856759Open ↗
03/05/2019140834916Open ↗
Showing 3 of 7 on file for this type
▸Other Documents7
▸BISDHCR DOCUMENT2
09/23/2019140856759Open ↗
07/17/2019140834916Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
06/26/2019123517612Open ↗
Showing 1 of 2 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISECCCNYS Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
08/13/2026M00967873-I1Open ↗