ECB07/06/2023ON THE NEW CHIMNEY LINER=FAILURE TO INSTALL CLEANOUT/INSPECTION PORT AT BASE OF CHIMNEY;, MAINTAIN BOILER; CORRECT VIOLATION AND SUBMIT THE CERTIFICATE OF CORRECTION$500 due
ECB07/06/2023OIL LINES TO GENERATOR AT ROOF TOP ARE LOOSE AND IN CONTACT WITH PARAPET WALL / A HEAVY ROLL OF EXTRA UNUSED OIL PIPING LEFT ON THE ROOF TOP /, MAINTAIN BOILER; CORRECT VIOLATION AND SUBMIT THE CERTIFICATE OF C$3K due
DOB04/12/2005VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
DOB10/18/20021P1710
ECB10/11/2023FAILURE TO COMPLY WITH COMISSIONER'S ORDER IN DOB VIOLATION VIO23-01820, DATED 6/8/2023. RESPONDENT WAS REQUIRED TO SUBMIT AN ENGINEER'S REPORT CONCERNING STRUCTURALLY DEFICIENT CONDITIONS. AS OF 10/11/2023, ANNothing owed — awaiting certificate of correction
ECB05/29/2015FAILURE TO FILE AN ACCEPTABLE AMENDED CYCLE 7 REPORT TO THIS DEPT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL LOCAL LAW FISP REPORT. REMEDY: FILE AN AMENDED REPORT FOLLOWING REMEDIAL REPAIRNothing owed — awaiting certificate of correction
ECB11/28/2014FAILURE TO FILE AN ACCEPTABLE AMENDED CYCLE 7 REPORT TO THIS DEPT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL LOCAL LAW FISP REPORT. REMEDY: FILE AN AMENDED REPORT FOLLOWING REMEDIAL REPAIRNothing owed — awaiting certificate of correction
ECB01/27/2010FAILURE TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE/STORAGE BATTERY EQUIPMENT.REM:FILE ARCHITECT/ENGINEER REPORTNothing owed — awaiting certificate of correction
ECB10/06/2008WATER IS LEAKING THRU CONCRETE SLAB INTO GAS METER ROOM AT CELLAR LEVEL. REMEDY:REPAIR & REPAIR CONCRETE SLAB.Nothing owed — awaiting certificate of correction
ECB10/06/2008WATER IS LEAKING IN GAS METER ROOM AT CELLAR LEVEL THRU CONCRETE SLAB IN EXTERIOR COURT.REMEDY:REPAIR & WATER PROOF GAS ROOM.Nothing owed — awaiting certificate of correction
ECB12/12/2000WORK WITHOUT A PERMIT, PLACING METAL STUDS AND SHEET ROCK TO PLACE PARTITION, THERBY SEILD WIRING ROOM ROOMS AT 10TH FLOOR NORTH EASTSIDE REMEDY: OBTAIN APPROVALS & PERMITS, IF FEASIBLE OR RESTORE TO PRIOR LEGANothing owed — awaiting certificate of correction
ECB11/08/2000USING HOISTING EQIP.IN AN UNSAFE MANNER:A)OUTRIGGER BEAMS NOT FILE W/DOB.B)OUTRIGGER BEAMS EXTENDED +/-5',3'6"MAXIMUM. C)INUSFFICIENT COUNTERWEIGHTS ON OUTRIGGER BEAMS +/-1113LBS (USED 750LBS).STIRRUPS PLACED ANothing owed — awaiting certificate of correction
City university · Owner of record: DORMITORY AUTHORITY OF THE STATE OF NEW YORK · 39,500 sf lot · 8.73 FAR built · Flood zone X