← Back
City university
CUNY SC > BAC_298_Baruch College
17 LEXINGTON AVENUE · BIN 1086544
💬 Discuss this project
1930Year Built
16Stories
W5Building Class
R9AZoning
344,828 sfGross Floor Area
3Units
LL97 Covered12 Open Violations 4 unresolved · 8 paperwork only ▸FISP: SAFE
City university · Owner of record: DORMITORY AUTHORITY OF THE STATE OF NEW YORK · 39,500 sf lot · 8.73 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction20p · 2 filings · 20 docs
Floor 101p · 1 filing · 5 docs
Floor 9
Floor 81p · 1 filing · 5 docs
Floor 7
Floor 61p · 1 filing · 5 docs
Floor 5
Floor 41p · 1 filing · 5 docs
Floor 3
Floor 21p · 1 filing · 5 docs
Floor 1
CellarUnder Construction28p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DASNY2007/08/2026
CUNY306/27/2026
WDF103/22/2026
CUNY DEPT. OF DESIGN & CONST.1503/21/2026
DORMITORY AUTHORITY STATE OF NY1103/21/2026
DORMITORY AUTHORITY OF THE STATE103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS1203/21/2026
AK CONSULTING SERVICES203/21/2026
SUPERSTRUCTURES ENG + ARCH103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
P B CONTRACTING CORPGeneral Contractor707/08/2026
WDF INCPlumbing307/08/2026
RUSSELL, JOHNElectrical303/21/2026
R.A.M.S. MECHANICAL INCGeneral Contractor203/21/2026
RONALD TESTA, JR.Electrical103/21/2026
DANZIGER, JElectrical103/21/2026
WDF INCFire Protection107/08/2026
INNER CITY CONTRACTINGElectrical103/21/2026
WDF INCGeneral Contractor106/27/2026
OMD ELECTRICAL CORPElectrical103/22/2026
IRVING BAPTISTEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING4983207/24/2026
FUTURE TECH CONSULTANTS O589304/29/2022
Building Lifecycle
All (125)Filed (16)Permit Issued (9)Signed Off (3)Facade (FISP) (15)Violation (60)Inspection (3)Objection (6)Special Inspection (13)
09/11/2026
Signed off — Alteration
Structural plans filed herewith to show tank replacement in kind; no additional loads considered. No change to use, egress, or occupancy.
M01337055-I1
08/06/2026
Special inspection requirement — Final
THOMAS PETRESHOCK
08/06/2026
Special inspection requirement — Structural Steel - Details
MARISA HARTE
07/24/2026
Filed — Alteration
Structural plans filed herewith to show tank replacement in kind; no additional loads considered. No change to use, egress, or occupancy.
M01337055-P1
07/13/2026
Special inspection requirement — Final
THOMAS PETRESHOCK
07/13/2026
Special inspection requirement — Structural Steel - Details
MARISA HARTE
07/08/2026
Inspection — Fail-Final Sign Permit Inspection
Fail
View inspection ↗
06/24/2026
Permit issued — Structural
M01337055-I1-ST
02/17/2026
Filed — Alteration
INSTALL NEW 6" FIRE SERVICE PIPPING, BACK-FLOW PREVENTER, FLOOR DRAIN, REPLACE BOOSTER PUMP RELATED PIPPING AT CELLAR LEVEL. INSTALL NEW 8000 GALLON FIRE/DOMESTIC WATER HOUSE TANK. CONTRACTOR TO INSTALL TEMPORARY TANKS FOR TEMPORARY DOMESTIC SUPPLY
M00225466-P4
01/13/2026
Filed — Alteration
Structural plans filed herewith to show tank replacement in kind; no additional loads considered. No change to use, egress, or occupancy.
M01337055-I1
10/21/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/18/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/30/2024
Permit issued — Sprinklers
M00225155-I1-EW-SP
12/12/2023
Signed off — Alteration
FILING HEREWITH FOR MH WORK AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS APPLICATION.
M00654399-I1
08/22/2023
Cycle 9 facade inspection completed
08/15/2023
Signed off — Alteration
Baruch College, Admin. Bldg., Exterior faade repairs as per the plans filed including: Removal & replacement of crack/spall masonry units, steel lintel, window glazing & glass block, sealant and louvers.
M00728004-I1
08/14/2023
Cycle 9 facade report signed — SAFE
07/20/2023
Permit issued — General Construction
M00728004-I1-GC
06/08/2023
Cycle 9 facade report submitted
04/10/2023
Permit issued — Plumbing
M00225466-I1-PL
02/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/14/2023
Cycle 8 facade report submitted
02/08/2023
Cycle 8 facade report signed — SAFE
01/31/2023
Cycle 8 facade inspection completed
07/16/2022
Permit issued — Sidewalk Shed
M00769391-I1-SH
07/07/2022
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 133 EAST 22ND STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M00769391-I1
07/05/2022
Permit issued — General Construction
M00728004-I1-GC
04/29/2022
Filed — Alteration
Baruch College, Admin. Bldg., Exterior faade repairs as per the plans filed including: Removal & replacement of crack/spall masonry units, steel lintel, window glazing & glass block, sealant and louvers.
M00728004-I1
04/11/2022
Permit issued — Mechanical Systems
M00654399-I1-MS
03/25/2022
Filed — Alteration
FILING HEREWITH FOR MH WORK AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS APPLICATION.
M00654399-I1
02/03/2022
Special inspection requirement — Sprinkler Systems
Stephen Marchese
02/01/2022
Filed — Alteration
INSTALL NEW 6" FIRE SERVICE PIPPING, BACK-FLOW PREVENTER, FLOOR DRAIN, REPLACE BOOSTER PUMP RELATED PIPPING AT CELLAR LEVEL. INSTALL NEW 8000 GALLON FIRE/DOMESTIC WATER HOUSE TANK. CONTRACTOR TO INSTALL TEMPORARY TANKS FOR TEMPORARY DOMESTIC SUPPLY
M00225466-P3
02/01/2022
Filed — Alteration
INSTALL NEW 6" FIRE SERVICE AND PIPPING AND CONECT TO EXISTING FIRE DEPARTMENT CONNECTION AND FIRE CONTROL VALVE ASSEMBLY
M00225155-P4
02/01/2022
Special inspection requirement — Sprinkler Systems
01/11/2022
Filed — Alteration
INSTALL NEW 6" FIRE SERVICE AND PIPPING AND CONECT TO EXISTING FIRE DEPARTMENT CONNECTION AND FIRE CONTROL VALVE ASSEMBLY
M00225155-P3
01/10/2022
Special inspection requirement — Sprinkler Systems
01/03/2022
Objection resolved — Addressed
12/21/2021
Objection raised — Scope
12/14/2021
Filed — Alteration
INSTALL NEW 6" FIRE SERVICE AND PIPPING AND CONECT TO EXISTING FIRE DEPARTMENT CONNECTION AND FIRE CONTROL VALVE ASSEMBLY
M00225155-P2
12/14/2021
Filed — Alteration
INSTALL NEW 6" FIRE SERVICE PIPPING, BACK-FLOW PREVENTER, FLOOR DRAIN, REPLACE BOOSTER PUMP RELATED PIPPING AT CELLAR LEVEL. INSTALL NEW 8000 GALLON FIRE/DOMESTIC WATER HOUSE TANK. CONTRACTOR TO INSTALL TEMPORARY TANKS FOR TEMPORARY DOMESTIC SUPPLY
M00225466-P2
06/23/2021
Permit issued — Plumbing
M00225466-I1-PL
04/21/2021
Filed — Alteration
INSTALL NEW 6" FIRE SERVICE AND PIPPING AND CONECT TO EXISTING FIRE DEPARTMENT CONNECTION AND FIRE CONTROL VALVE ASSEMBLY
M00225155-P1
04/21/2021
Filed — Alteration
INSTALL NEW 6" FIRE SERVICE PIPPING, BACK-FLOW PREVENTER, FLOOR DRAIN, REPLACE BOOSTER PUMP RELATED PIPPING AT CELLAR LEVEL. INSTALL NEW 8000 GALLON FIRE/DOMESTIC WATER HOUSE TANK. CONTRACTOR TO INSTALL TEMPORARY TANKS FOR TEMPORARY DOMESTIC SUPPLY
M00225466-P1
04/15/2021
Special inspection requirement — Sprinkler Systems
02/16/2021
Permit issued — Plumbing
M00225466-I1-PL
08/18/2020
Violation issued (ECB, closed)
Unknown
01/10/2020
Filed — Alteration
REINFORCED EXISTING WATER TANK SUPPORT ON ROOF AND PROVIDE TEMPORARY SUPPORT FOR TEMPORARY WATER TANKS
M00225582-I1
01/07/2020
Objection resolved — Addressed
01/07/2020
Objection resolved — Addressed
01/06/2020
Objection raised — Admin
01/06/2020
Objection raised — Admin
01/03/2020
Filed — Alteration
INSTALL NEW 6" FIRE SERVICE AND PIPPING AND CONECT TO EXISTING FIRE DEPARTMENT CONNECTION AND FIRE CONTROL VALVE ASSEMBLY
M00225155-I1
01/03/2020
Filed — Alteration
INSTALL NEW 6" FIRE SERVICE PIPPING, BACK-FLOW PREVENTER, FLOOR DRAIN, REPLACE BOOSTER PUMP RELATED PIPPING AT CELLAR LEVEL. INSTALL NEW 8000 GALLON FIRE/DOMESTIC WATER HOUSE TANK. CONTRACTOR TO INSTALL TEMPORARY TANKS FOR TEMPORARY DOMESTIC SUPPLY
M00225466-I1
11/04/2019
Special inspection requirement — Structural Cold-Formed Steel
09/10/2019
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/10/2019
Special inspection requirement — Structural Steel - Details
09/10/2019
Special inspection requirement — Structural Steel - Welding
09/10/2019
Special inspection requirement — Final
09/24/2018
Cycle 8 facade report submitted
09/24/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 125 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offWDF INC06/24/2026
DOB NOWSprinklersSigned-offWDF INC09/30/2024
DOB NOWGeneral ConstructionSigned-offP B CONTRACTING CORP07/20/2023
DOB NOWPlumbingPermit IssuedWDF INC04/10/2023
DOB NOWSidewalk ShedPermit IssuedP B CONTRACTING CORP07/16/2022
DOB NOWGeneral ConstructionSigned-offP B CONTRACTING CORP07/05/2022
DOB NOWMechanical SystemsSigned-offR.A.M.S. MECHANICAL INC04/11/2022
DOB NOWPlumbingPermit IssuedWDF INC06/23/2021
DOB NOWPlumbingPermit IssuedWDF INC02/16/2021
BISOTISSUEDEAST COAST ENVIRONMENTAL05/31/2023
BISPLISSUEDM&G PLUMBING AND HEATING11/09/2022
BISOTISSUEDEAST COAST ENVIRONMENTAL03/01/2022
BISPLISSUEDM&G PLUMBING AND HEATING10/05/2021
BISOTISSUEDWDF INC06/25/2020
BISOTISSUEDWDF INC06/19/2019
BISOTISSUEDAFL CONSTRUCTION CO INC03/15/2019
BISPLISSUEDWDF INC01/28/2019
BISPLISSUEDEASTERN PLBG & MECH CONTR11/27/2018
BISOTISSUEDAFL CONSTRUCTION CO INC11/05/2018
BISPLISSUEDWDF, INC07/10/2018
BISOTISSUEDWDF INC06/13/2018
BISOTISSUEDWDF INC06/13/2017
BISPLISSUEDWDF, INC06/13/2017
BISPLISSUEDOLYMPIC PLBG & HTG SVC IN01/22/2015
BISOTISSUEDKNIGHTSBRIDGE CONST CORP12/23/2014
BISMHISSUEDKNIGHTSBRIDGE CONST CORP12/23/2014
BISMHISSUEDCITNALTA CONSTRUCTION01/15/2014
BISOTISSUEDCITNALTA CONSTRUCTION01/15/2014
BISOTISSUEDDIMITRI ENTERPRISES INC01/11/2013
BISEQISSUEDB & S RESTORATION INC11/28/2012
BISSDISSUEDKEW-FOREST PLBG & HTG INC02/16/2012
BISSPISSUEDKEW-FOREST PLBG & HTG INC12/05/2011
1 project · most recent 02/01/2022
FiledStatusContractorScope
02/01/2022Signed-offWDF INC4 heads
1 project · most recent 02/17/2026
Water/Sanitary
FiledStatusContractorScope
02/17/2026Permit IssuedWDF INCWater/Sanitary
2 projects · most recent 06/03/2024
General Wiring
FiledStatusContractorScope
06/03/2024Permit IssuedOMD ELECTRICAL CORP1 meters, 1 new_meters
02/28/2019Permit IssuedG-SQUARED ELECTRIC, LLCGeneral Wiring
2 projects · most recent 07/24/2026
Steel
FiledStatusContractorScope
07/24/2026Signed-offWDF INCSteel
01/10/2020——Steel
1 project · most recent 07/07/2022
Sidewalk Shed
FiledStatusContractorScope
07/07/2022Permit IssuedP B CONTRACTING CORPSidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/08/2026Fail-Final Sign Permit InspectionFailView ↗
10/21/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/18/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
08/06/2026FinalTHOMAS PETRESHOCKprogress
08/06/2026Structural Steel - DetailsMARISA HARTEspecial
07/13/2026FinalTHOMAS PETRESHOCKprogress
07/13/2026Structural Steel - DetailsMARISA HARTEspecial
02/03/2022Sprinkler SystemsStephen Marchesespecial
02/01/2022Sprinkler Systems—special
01/10/2022Sprinkler Systems—special
04/15/2021Sprinkler Systems—special
11/04/2019Structural Cold-Formed Steel—special
09/10/2019Structural Stability – Alterations of existing buildings—special
09/10/2019Structural Steel - Details—special
09/10/2019Structural Steel - Welding—special
09/10/2019Final—progress
▾Documents — 287 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch - Plumbing5
08/19/2026M00225466-P4Request digital key ↗
08/19/2026M00225466-P3Request digital key ↗
08/19/2026M00225466-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch5
09/02/2026M00654399-I1Request digital key ↗
09/02/2026M00728004-I1Request digital key ↗
09/02/2026M00769391-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler5
09/03/2026M00225155-I1Request digital key ↗
09/03/2026M00225155-P3Request digital key ↗
09/03/2026M00225155-P4Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00225582-I1Request digital key ↗
▸Applications & Permits67
▸BISWORK PERMIT APPLICATION37
05/25/2023122901618Open ↗
05/15/2023122901618Open ↗
05/02/2023123770026Open ↗
Showing 3 of 37 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION30
12/26/2025123702010Open ↗
07/23/2025122901618Open ↗
07/23/2025122901618Open ↗
Showing 3 of 30 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
01/27/2020123702010Open ↗
▸Seals & Professional Certifications55
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION29
01/27/2020123702010Open ↗
08/19/2019123770026Open ↗
04/12/2019123734138Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/03/2026M00225155-P2Open ↗
09/03/2026M00225155-P3Open ↗
09/03/2026M00225155-P4Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026M01337055-I1Open ↗
08/27/2026M00225155-I1Open ↗
08/24/2026M01337055-P1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
11/28/2012121415753Open ↗
Showing 1 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
11/28/2012121415753Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026M01337055-I1Open ↗
08/24/2026M01337055-P1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/13/2015140374654Open ↗
▸Trade Schedules & Equipment13
▸BISSCHEDULE B - PLUMBING5
07/23/2025122901618Open ↗
11/14/2022122901618Open ↗
11/27/2013121848956Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
03/14/2019122901618Open ↗
11/15/2016122901618Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
06/14/2012120894309Open ↗
05/21/2012120894309Open ↗
▸BISEQUIPMENT USE PERMITS1
03/22/2016121235378Open ↗
▸BISSTANDPIPE INSP REPORT : FP-841
06/14/2012120894309Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
03/22/2016121235378Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
05/17/2023120111690Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
09/03/2026M00225155-I1Open ↗
08/19/2026M01337055-I1Open ↗
08/19/2026M00225466-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/28/2012121415753Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
06/14/2021121235485Open ↗
▸BISASBESTOS-CERTIFICATION (DEP ACP5)1
01/23/2014121235378Open ↗
▸BISASBESTOS: VARIANCE (DEP FORM V5)1
06/02/2021123770026Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M00654399-I1Open ↗
▸Energy Compliance24
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
08/19/2019123770026Open ↗
11/15/2016122901618Open ↗
11/15/2016122901618Open ↗
Showing 3 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections7
01/02/2015121848956Open ↗
12/15/2014121848956Open ↗
08/15/2014121848956Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/14/2021121235485Open ↗
08/13/2015140374654Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026M00728004-I1Open ↗
08/13/2026M00654399-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/14/2021121235485Open ↗
▸BISLIGHTING CONTROLS1
10/06/2025123770026Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/14/2016121235378Open ↗
▸BISINTERIOR LIGHTING POWER1
10/06/2025123770026Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY4
03/16/2021121235485Open ↗
03/12/2021121235485Open ↗
03/12/2021121235485Open ↗
Showing 3 of 4 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
10/06/2025123770026Open ↗
▸Approvals, Objections & Sign-offs34
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter16
09/03/2026M00225155-P3Open ↗
09/03/2026M00225155-P4Open ↗
09/03/2026M00225155-I1Open ↗
Showing 3 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
07/29/2025122901618Open ↗
07/23/2025122901618Open ↗
03/02/2022122901618Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
11/28/2012121415753Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWDEP Variance (V5) letter3
09/03/2026M00225155-I1Open ↗
08/19/2026M00225466-I1Open ↗
08/13/2026M00728004-I1Open ↗
▸BISSUPERSEDING LETTER2
09/27/2021122901618Open ↗
01/28/2019121235485Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
06/14/2021121235485Open ↗
04/14/2016121235378Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
07/21/2017120111690Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT14
01/27/2020123702010Open ↗
08/19/2019123770026Open ↗
04/12/2019123734138Open ↗
Showing 3 of 14 on file for this type
▸Filing & Intake Forms41
▸BISBOROUGH INTAKE FORM17
05/25/2023122901618Open ↗
05/18/2023122901618Open ↗
05/03/2023122901618Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING COVER SHEET11
01/27/2020123702010Open ↗
08/19/2019123770026Open ↗
04/12/2019123734138Open ↗
Showing 3 of 11 on file for this type
▸BISADDITIONAL INFORMATION8
07/29/2025122901618Open ↗
09/06/2024122901618Open ↗
06/09/2021121235485Open ↗
Showing 3 of 8 on file for this type
▸BISeFiling Job Application Cover Sheet5
07/30/2013121235378Open ↗
07/30/2013121235378Open ↗
07/30/2013121235485Open ↗
Showing 3 of 5 on file for this type
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
08/16/2019123770026Open ↗
11/05/2018122901618Open ↗
06/20/2017121235485Open ↗
Showing 3 of 5 on file for this type