← Back
Walk-up apt, over six families with stores
17 MOTT STREET
MANHATTAN · BIN 1079262
💬 Discuss this project
1900Year Built
5Stories
C7Building Class
C6-1Zoning
9,726 sfGross Floor Area
17Units
Rent Stabilized12 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: WING LEE RLTY INC · 2,303 sf lot · 4.22 FAR built · Flood zone X
Locations of Work
Mechanical
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WING LEE REA;TY INC1303/22/2026
OWNER OF 17 MOTT STREET103/22/2026
THE OWNER OF103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIGHQUALITY CONSTRUCTION VNW803/21/2026
CODE803/21/2026
HIGH QUALITY 338203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BELLWOOD NY INCGeneral Contractor507/08/2026
HIGH QUALITY CONSTRUCTIONGeneral Contractor307/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing307/08/2026
VMC PLUMBING & HEATING INPlumbing207/08/2026
GEORGE COBOSElectrical103/21/2026
FLYTIGER P & H LTDPlumbing107/08/2026
JP & SON ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHRISTIAN L. MARTOS ENGIN5965104/10/2024
JIAN ENGINEERING PLLC7397404/10/2024
YORKOS ENGINEERING, DESIG6991204/10/2024
J&R DESIGN AND INSPECTION6637508/08/2022
Building Lifecycle
All (89)Filed (9)Permit Issued (9)Signed Off (8)Violation (20)Inspection (4)Objection (20)Special Inspection (19)
11/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/15/2025
Signed off — Alteration
INSTALL PLUMBING FIXTURES,ELECTRIC HOT WATER HEATER AND RELATED PIPING. BUILDING IS MIXED USED MULTI-UNIT RESIDENTIAL. NO CHANGE OF OCCUPANCY OR EGRESS
M01018200-S2
06/27/2025
Signed off — Alteration
INSTALL PLUMBING FIXTURES,ELECTRIC HOT WATER HEATER AND RELATED PIPING. BUILDING IS MIXED USED MULTI-UNIT RESIDENTIAL. NO CHANGE OF OCCUPANCY OR EGRESS
M01018200-I1
06/25/2025
Permit issued — Plumbing
M01018200-S2-PL
06/20/2025
Signed off — Alteration
INSTALL PLUMBING FIXTURES,ELECTRIC HOT WATER HEATER AND RELATED PIPING. BUILDING IS MIXED USED MULTI-UNIT RESIDENTIAL. NO CHANGE OF OCCUPANCY OR EGRESS
M01018200-S1
06/18/2025
Signed off — Alteration
INSTALL PLUMBING FIXTURES,ELECTRIC HOT WATER HEATER AND RELATED PIPING. BUILDING IS MIXED USED MULTI-UNIT RESIDENTIAL. NO CHANGE OF OCCUPANCY OR EGRESS
M01018200-S3
07/01/2024
Permit issued — General Construction
M01018200-I1-GC
07/01/2024
Permit issued — Mechanical Systems
M01018200-S1-MS
07/01/2024
Permit issued — Plumbing
M01018200-S2-PL
06/28/2024
Permit issued — Structural
M01018200-S3-ST
04/10/2024
Filed — Alteration
INSTALL PLUMBING FIXTURES,ELECTRIC HOT WATER HEATER AND RELATED PIPING. BUILDING IS MIXED USED MULTI-UNIT RESIDENTIAL. NO CHANGE OF OCCUPANCY OR EGRESS
M01018200-S2
04/10/2024
Filed — Alteration
INSTALL PLUMBING FIXTURES,ELECTRIC HOT WATER HEATER AND RELATED PIPING. BUILDING IS MIXED USED MULTI-UNIT RESIDENTIAL. NO CHANGE OF OCCUPANCY OR EGRESS
M01018200-S1
04/10/2024
Filed — Alteration
INSTALL PLUMBING FIXTURES,ELECTRIC HOT WATER HEATER AND RELATED PIPING. BUILDING IS MIXED USED MULTI-UNIT RESIDENTIAL. NO CHANGE OF OCCUPANCY OR EGRESS
M01018200-S3
04/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
BALTU YORKOS
04/04/2024
Special inspection requirement — Tenant Protection Plan Compliance
JIAN DENG
04/04/2024
Special inspection requirement — Mechanical Systems
BALTU YORKOS
04/04/2024
Special inspection requirement — Final
BALTU YORKOS
03/28/2024
Objection resolved — Addressed
03/28/2024
Objection resolved — Addressed
03/28/2024
Objection resolved — Addressed
03/28/2024
Objection resolved — Addressed
03/28/2024
Objection resolved — Addressed
03/28/2024
Objection resolved — Addressed
03/28/2024
Objection resolved — Addressed
03/28/2024
Objection resolved — Addressed
03/28/2024
Objection resolved — Addressed
03/28/2024
Objection resolved — Addressed
03/25/2024
Objection raised — Other
03/25/2024
Objection raised — Other
03/25/2024
Objection raised — Other
03/25/2024
Objection raised — Other
03/25/2024
Objection raised — Other
03/25/2024
Objection raised — Other
03/25/2024
Objection raised — Other
03/25/2024
Objection raised — Other
03/25/2024
Objection raised — Other
03/25/2024
Objection raised — Other
03/14/2024
Filed — Alteration
INSTALL PLUMBING FIXTURES,ELECTRIC HOT WATER HEATER AND RELATED PIPING. BUILDING IS MIXED USED MULTI-UNIT RESIDENTIAL. NO CHANGE OF OCCUPANCY OR EGRESS
M01018200-I1
03/11/2024
Special inspection requirement — Final
JIAN DENG
03/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
03/11/2024
Special inspection requirement — Tenant Protection Plan Compliance
JIAN DENG
12/27/2022
Signed off — Alteration
INTERIOR RENOVATION ON APT. 1F ON 2ND FLOOR OF AN EXIST'G MIXED USE BUILDING. REPLACE KITCHEN AND BATHROOM FIXTURES PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
M00784344-I1
12/27/2022
Signed off — Alteration
INTERIOR RENOVATION ON APT. 1F ON 2ND FLOOR OF AN EXIST'G MIXED USE BUILDING. REPAIR/NEW PARTITION, DOOR, CEILING, FLOOR, PAINTING AS PER PLAN.NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
M00784343-I1
12/20/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/02/2022
Violation issued (HPD, closed)
I
08/11/2022
Permit issued — General Construction
M00784343-I1-GC
08/11/2022
Permit issued — Plumbing
M00784344-I1-PL
08/08/2022
Filed — Alteration
INTERIOR RENOVATION ON APT. 1F ON 2ND FLOOR OF AN EXIST'G MIXED USE BUILDING. REPLACE KITCHEN AND BATHROOM FIXTURES PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
M00784344-I1
08/08/2022
Filed — Alteration
INTERIOR RENOVATION ON APT. 1F ON 2ND FLOOR OF AN EXIST'G MIXED USE BUILDING. REPAIR/NEW PARTITION, DOOR, CEILING, FLOOR, PAINTING AS PER PLAN.NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
M00784343-I1
07/29/2022
Special inspection requirement — Energy Code Compliance Inspections
Robert Truskosky
07/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
07/29/2022
Special inspection requirement — Final
Robert Truskosky
07/29/2022
Special inspection requirement — Energy Code Compliance Inspections
Robert Truskosky
07/29/2022
Special inspection requirement — Fire-Resistance Rated Construction
Robert Truskosky
07/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
06/23/2022
Signed off — Alteration
GENERAL RENOVATION OF EXISTING APARTMENT UNIT(#8) ON 5TH FLOOR WITH, REPLACE PLUMBING FIXTURES AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00692631-I1
06/23/2022
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING APARTMENT UNIT ON 5TH FLOOR WITH REPAIRING PARTITION, CEILING AND FLOOR TITLES. NO EXTERIOR OR STRUCTURAL WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00692618-I1
06/21/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/17/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/19/2022
Filed — Alteration
INTERIOR RENOVATION OF EXISTING APARTMENT UNIT ON 5TH FLOOR WITH REPAIRING PARTITION, CEILING AND FLOOR TITLES. NO EXTERIOR OR STRUCTURAL WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00692618-P1
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offM. SPINELLI PLB & HTG INC06/25/2025
DOB NOWGeneral ConstructionSigned-offBELLWOOD NY INC07/01/2024
DOB NOWMechanical SystemsSigned-offBELLWOOD NY INC07/01/2024
DOB NOWPlumbingSigned-offFLYTIGER P & H LTD07/01/2024
DOB NOWStructuralSigned-offBELLWOOD NY INC06/28/2024
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY CONSTRUCTION08/11/2022
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.08/11/2022
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.03/16/2022
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY CONSTRUCTION03/14/2022
BISOTISSUEDJ & S CONSTRUCTION INC12/17/2007
BISPLISSUEDSAFEPIPE PLUMBING INC04/20/2005
BISPLISSUEDSAFEPIPE PLUMBING INC04/19/2004
BISPLISSUEDSAFEPIPE PLUMBING INC03/03/2003
BISOTISSUEDC & Y MAINTENANCE10/15/2002
BISFPISSUEDIDEAL FIRE SYSTEMS INC09/27/2002
BISBLISSUEDVITO VALENTINI04/18/2000
BISOTISSUEDC&Y MAINTENANCE INC07/29/1998
2 projects · most recent 10/03/2024
General Wiring
FiledStatusContractorScope
10/03/2024Permit IssuedJP & SON ELECTRIC CORPGeneral Wiring
04/05/2021Permit IssuedPOWER SURGE ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/20/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/21/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/17/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
04/04/2024Fire-Resistant Penetrations and JointsBALTU YORKOSspecial
04/04/2024Tenant Protection Plan ComplianceJIAN DENGspecial
04/04/2024Mechanical SystemsBALTU YORKOSspecial
04/04/2024FinalBALTU YORKOSprogress
03/11/2024FinalJIAN DENGprogress
03/11/2024Fire-Resistant Penetrations and JointsJIAN DENGspecial
03/11/2024Tenant Protection Plan ComplianceJIAN DENGspecial
07/29/2022Energy Code Compliance InspectionsRobert Truskoskyprogress
07/29/2022Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
07/29/2022FinalRobert Truskoskyprogress
07/29/2022Energy Code Compliance InspectionsRobert Truskoskyprogress
07/29/2022Fire-Resistance Rated ConstructionRobert Truskoskyprogress
07/29/2022Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
05/17/2022Energy Code Compliance InspectionsRobert Truskoskyprogress
05/17/2022FinalRobert Truskoskyprogress
05/17/2022Fire-Resistance Rated ConstructionRobert Truskoskyprogress
05/17/2022Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
03/05/2022Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
03/05/2022Energy Code Compliance InspectionsRobert Truskoskyprogress
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/02/2026M00692631-I1Request digital key ↗
09/02/2026M00692618-P1Request digital key ↗
09/02/2026M00692618-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications26
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/02/2026M00692618-P1Open ↗
09/02/2026M00692618-I1Open ↗
08/13/2026M00692631-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026M01018200-S1Open ↗
09/01/2026M01018200-S1Open ↗
09/01/2026M01018200-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026M01018200-S1Open ↗
08/27/2026M01018200-I1Open ↗
08/27/2026M00692618-P1Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/02/2026M00692618-I1Open ↗
09/02/2026M00692618-P1Open ↗
08/13/2026M01018200-I1Open ↗
Showing 3 of 9 on file for this type
▸Other Documents1
▸DOB NOWProof of Historic Building1
08/13/2026M01018200-I1Open ↗