Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofUnder Construction109p · 2 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Subsequently filing Structural Scope of work for a 5-story concrete building in conjunction with NB # B01122406-I1.
On file for this project
107 documents · 2 drawing sheets
Project B33361313Permit Issued · 04/01/2026
partial work for new building sewer connection as per DEP site connection approval, DOD inspection for steel sleeve through foundation wall
BulkheadUnder Construction5p · 1 filing · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Subsequently filing Structural Scope of work for a 5-story concrete building in conjunction with NB # B01122406-I1.
On file for this project
107 documents · 5 drawing sheets
Floor 5Under Construction109p · 2 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Subsequently filing Structural Scope of work for a 5-story concrete building in conjunction with NB # B01122406-I1.
On file for this project
107 documents · 2 drawing sheets
Project B33361313Permit Issued · 04/01/2026
partial work for new building sewer connection as per DEP site connection approval, DOD inspection for steel sleeve through foundation wall
Floor 4Under Construction108p · 2 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Subsequently filing Structural Scope of work for a 5-story concrete building in conjunction with NB # B01122406-I1.
On file for this project
107 documents · 1 drawing sheet
Project B33361313Permit Issued · 04/01/2026
partial work for new building sewer connection as per DEP site connection approval, DOD inspection for steel sleeve through foundation wall
Floor 3Under Construction110p · 2 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Subsequently filing Structural Scope of work for a 5-story concrete building in conjunction with NB # B01122406-I1.
On file for this project
107 documents · 3 drawing sheets
Project B33361313Permit Issued · 04/01/2026
partial work for new building sewer connection as per DEP site connection approval, DOD inspection for steel sleeve through foundation wall
Floor 2Under Construction108p · 2 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Subsequently filing Structural Scope of work for a 5-story concrete building in conjunction with NB # B01122406-I1.
On file for this project
107 documents · 1 drawing sheet
Project B33361313Permit Issued · 04/01/2026
partial work for new building sewer connection as per DEP site connection approval, DOD inspection for steel sleeve through foundation wall
Floor 1Heavy duty sidewalk shed installationUnder Construction112p · 3 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sidewalk Shed · Sprinklers · Structural
Subsequently filing Structural Scope of work for a 5-story concrete building in conjunction with NB # B01122406-I1.
On file for this project
107 documents · 1 drawing sheet
Project B33361313Permit Issued · 04/01/2026
partial work for new building sewer connection as per DEP site connection approval, DOD inspection for steel sleeve through foundation wall
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
CellarUnder Construction111p · 2 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Foundation · General Construction · Mechanical Systems · Plumbing · Sprinklers
Subsequently filing Structural Scope of work for a 5-story concrete building in conjunction with NB # B01122406-I1.
On file for this project
107 documents · 4 drawing sheets
Project B33361313Permit Issued · 04/01/2026
partial work for new building sewer connection as per DEP site connection approval, DOD inspection for steel sleeve through foundation wall
Site & exteriorConstruction fenceUnder Construction82p · 5 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · General Construction · Sprinklers · Supported Scaffold · Support of Excavation
Subsequently filing Structural Scope of work for a 5-story concrete building in conjunction with NB # B01122406-I1.
On file for this project
107 documents · 12 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
On file for this project
3 documents · 6 drawing sheets
INSTALLATION OF CONSTRUCTION FENCE AT SIDEWALK AS PER DRAWINGS IN CONNECTION WITH JOB # B01122406-I1FILING FOR TEMPORARY CONSTRUCTION FENCE, NO CHANGE IN USE, OCCUPANCY EGRESS OR BULK UNDER THIS APPLICATION
On file for this project
2 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.