← Back
One story - permanent living quarter
17 PICKERSGILL AVENUE
STATEN ISLAND · Grasmere-Arrochar-South Beach-Dongan Hills · BIN 5045476
💬 Discuss this project
1940Year Built
1Stories
A2Building Class
R1-2Zoning
1,612 sfGross Floor Area
1Units
One story - permanent living quarter · 4,800 sf lot · 0.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Attic7p · 2 filings · 20 docs
Floor 29p · 3 filings · 20 docs
Floor 117p · 3 filings · 20 docs
Cellar4p · 2 filings · 20 docs
Sub-Basement6p · 1 filing · 20 docs
Site & exterior2p · 1 filing · 2 docs
Filed — no permit issued2p · 1 filing · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JIMENEZ BUILDING CONSULTING LLC703/25/2024
JIAN ENGINEERING PLLC102/23/2023
YANG ENGINEERING LLC101/30/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD DESIGN STUDIO803/21/2026
JRL SKYLINE1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
I.H 1 CONSTRUCTION CORPGeneral Contractor807/08/2026
VERTEX ELECTRIC CORP.Electrical103/22/2026
EH PLUMBING & HEATING CORPlumbing107/08/2026
TRI CITY MECHANICAL GROUP CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JIAN ENGINEERING PLLC7397603/25/2024
Building Lifecycle
All (57)Filed (9)Permit Issued (6)Signed Off (4)Inspection (8)Special Inspection (30)
04/17/2025
Signed off — Alteration CO
PROPOSED VERTICAL EXTENSION OF AN EXISTING 1-STORY HOUSE TO 2-STORY 1 FAMILY WITH GENERAL CONSTRUCTION WORK AS PER PLAN. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
S00812796-S1
04/10/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/21/2025
Signed off — Alteration
S00833633-I1
02/13/2025
Permit issued — Structural
S00833633-I1-ST
12/31/2024
Signed off — Alteration
PROPOSED PLUMBING WORK ON BASEMENT, 1ST FLOOR, 2ND FLOOR IN CONJUNCTION WITH ALT-CO JOB #: S00812796-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00839453-I1
12/23/2024
Signed off — Alteration
THIS APPLICATION IS FILED TO ADD CONSTRUCTION FENCE WORK IN CONJUNCTION WITH D.O.B. ALT-II APPLICATION #: S00812184-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S00812167-I1
08/29/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/09/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/30/2024
Permit issued — Mechanical Systems
S00812796-I1-GC-CX
06/07/2024
Special inspection requirement — HVAC-R and service water heating equipment
JIAN DENG
06/07/2024
Special inspection requirement — Insulation placement and R values
JIAN DENG
06/07/2024
Special inspection requirement — Fenestration areas
JIAN DENG
06/07/2024
Special inspection requirement — Interior lighting power
JIAN DENG
06/07/2024
Special inspection requirement — Fenestration air leakage
JIAN DENG
06/07/2024
Special inspection requirement — HVAC-R and service water heating system controls
JIAN DENG
06/07/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
JIAN DENG
06/07/2024
Special inspection requirement — Mechanical Systems
JIAN DENG
06/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
06/07/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
JIAN DENG
06/07/2024
Special inspection requirement — Final
JIAN DENG
06/07/2024
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
06/07/2024
Special inspection requirement — Fire-Resistance Rated Construction
JIAN DENG
06/07/2024
Special inspection requirement — Maintenance information
JIAN DENG
06/07/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JIAN DENG
06/07/2024
Special inspection requirement — Air barrier - visual inspection
JIAN DENG
05/01/2024
Permit issued — Curb Cut
S00812796-S1-CC
04/03/2024
Permit issued — Plumbing
S00839453-I1-PL
03/25/2024
Filed — Alteration
PROPOSED PLUMBING WORK ON BASEMENT, 1ST FLOOR, 2ND FLOOR IN CONJUNCTION WITH ALT-CO JOB #: S00812796-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00839453-P2
03/25/2024
Special inspection requirement — HVAC-R and service water heating system controls
JIAN DENG
03/25/2024
Special inspection requirement — HVAC-R and service water heating equipment
JIAN DENG
03/25/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JIAN DENG
03/25/2024
Special inspection requirement — Maintenance information
JIAN DENG
03/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
03/25/2024
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
10/11/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/26/2023
Filed — Alteration CO
PROPOSED VERTICAL EXTENSION OF AN EXISTING 1-STORY HOUSE TO 2-STORY 1 FAMILY WITH GENERAL CONSTRUCTION WORK AS PER PLAN. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
S00812796-P1
08/25/2023
Special inspection requirement — Fire-Resistance Rated Construction
JIAN DENG
08/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
08/25/2023
Special inspection requirement — Mechanical Systems
JIAN DENG
08/25/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
JIAN DENG
08/25/2023
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
08/25/2023
Special inspection requirement — Final
JIAN DENG
08/25/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
JIAN DENG
08/25/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
JIAN DENG
08/10/2023
Filed — Alteration
PROPOSED PLUMBING WORK ON BASEMENT, 1ST FLOOR, 2ND FLOOR IN CONJUNCTION WITH ALT-CO JOB #: S00812796-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00839453-P1
08/01/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/29/2023
Filed — Alteration CO
PROPOSED VERTICAL EXTENSION OF AN EXISTING 1-STORY HOUSE TO 2-STORY 1 FAMILY WITH GENERAL CONSTRUCTION WORK AS PER PLAN. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
S00812796-S1
04/12/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/12/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/12/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/15/2023
Permit issued — Plumbing
S00839453-I1-PL
03/07/2023
Filed — Alteration
PROPOSED PLUMBING WORK ON BASEMENT, 1ST FLOOR, 2ND FLOOR IN CONJUNCTION WITH ALT-CO JOB #: S00812796-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00839453-I1
02/23/2023
Filed — Alteration
S00833633-I1
01/30/2023
Filed — Alteration CO
PROPOSED VERTICAL EXTENSION OF AN EXISTING 1-STORY HOUSE TO 2-STORY 1 FAMILY WITH GENERAL CONSTRUCTION WORK AS PER PLAN. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
S00812796-I1
01/19/2023
Filed — Alteration
PROPOSED INTERIOR RENOVATION WORK OF AN EXISTING 1-STORY HOUSE WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00815664-I1
01/19/2023
Permit issued — Construction Fence
S00812167-I1-FN
01/13/2023
Filed — Alteration
THIS APPLICATION IS FILED TO ADD CONSTRUCTION FENCE WORK IN CONJUNCTION WITH D.O.B. ALT-II APPLICATION #: S00812184-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S00812167-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offI.H 1 CONSTRUCTION CORP02/13/2025
DOB NOWMechanical SystemsPermit IssuedI.H 1 CONSTRUCTION CORP07/30/2024
DOB NOWCurb CutSigned-offI.H 1 CONSTRUCTION CORP05/01/2024
DOB NOWPlumbingSigned-offFLAVIO MECHANICAL CORP04/03/2024
DOB NOWPlumbingSigned-offEH PLUMBING & HEATING COR03/15/2023
DOB NOWConstruction FenceSigned-offI.H 1 CONSTRUCTION CORP01/19/2023
1 project · most recent 08/26/2023
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/26/2023Permit IssuedI.H 1 CONSTRUCTION CORPAir Conditioning Systems
Cooling
Ameristar M4AC4048D1000AA 21,600 BTU · Split System ×1
1 project · most recent 09/15/2023
General Wiring
FiledStatusContractorScope
09/15/2023CompleteVERTEX ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/10/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
08/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/09/2024Fail-Final CND-Occupancy InspectionFailView ↗
10/11/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/01/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/12/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/12/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
06/07/2024HVAC-R and service water heating equipmentJIAN DENGenergy_progress
06/07/2024Insulation placement and R valuesJIAN DENGenergy_progress
06/07/2024Fenestration areasJIAN DENGenergy_progress
06/07/2024Interior lighting powerJIAN DENGenergy_progress
06/07/2024Fenestration air leakageJIAN DENGenergy_progress
06/07/2024HVAC-R and service water heating system controlsJIAN DENGenergy_progress
06/07/2024Fenestration and door U-factor and product ratingsJIAN DENGenergy_progress
06/07/2024Mechanical SystemsJIAN DENGspecial
06/07/2024Fire-Resistant Penetrations and JointsJIAN DENGspecial
06/07/2024Structural Stability – Alterations of existing buildingsJIAN DENGspecial
06/07/2024FinalJIAN DENGprogress
06/07/2024Energy Code Compliance InspectionsJIAN DENGprogress
06/07/2024Fire-Resistance Rated ConstructionJIAN DENGprogress
06/07/2024Maintenance informationJIAN DENGenergy_progress
06/07/2024HVAC-R and service water piping design and insulationJIAN DENGenergy_progress
06/07/2024Air barrier - visual inspectionJIAN DENGenergy_progress
03/25/2024HVAC-R and service water heating system controlsJIAN DENGenergy_progress
03/25/2024HVAC-R and service water heating equipmentJIAN DENGenergy_progress
03/25/2024HVAC-R and service water piping design and insulationJIAN DENGenergy_progress
03/25/2024Maintenance informationJIAN DENGenergy_progress
03/25/2024Fire-Resistant Penetrations and JointsJIAN DENGspecial
03/25/2024Energy Code Compliance InspectionsJIAN DENGprogress
08/25/2023Fire-Resistance Rated ConstructionJIAN DENGprogress
08/25/2023Fire-Resistant Penetrations and JointsJIAN DENGspecial
08/25/2023Mechanical SystemsJIAN DENGspecial
Latest 25 of 44.
▾Documents — 95 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/23/2026S00812167-I1Request digital key ↗
08/23/2026S00815664-I1Request digital key ↗
08/23/2026S00833633-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
01/30/2023540244608Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
03/07/2023540244608Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/22/2026S00812796-P1Open ↗
08/13/2026S00812796-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/22/2026S00812796-P1Open ↗
08/13/2026S00812796-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00812796-I1Open ↗
▸Seals & Professional Certifications52
▸DOB NOWProgress Inspector Seal & Signature36
08/29/2026S00812796-I1Open ↗
08/29/2026S00812796-I1Open ↗
08/29/2026S00812796-I1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/23/2026S00833633-I1Open ↗
08/22/2026S00812796-P1Open ↗
08/22/2026S00812796-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/29/2026S00812796-I1Open ↗
08/29/2026S00812796-I1Open ↗
08/29/2026S00812796-I1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/30/2023540244608Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/30/2023540244608Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/22/2026S00812796-P1Open ↗
08/22/2026S00812796-I1Open ↗
▸BISSTREET TREE CHECKLIST1
01/30/2023540244608Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/23/2026S00833633-I1Open ↗
08/22/2026S00812796-I1Open ↗
08/22/2026S00812796-S1Open ↗
Showing 3 of 8 on file for this type
▸Inspections & Test Reports1
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
01/30/2023540244608Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
03/07/2023540244608Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
01/30/2023540244608Open ↗
▸Other Documents13
▸BISBPP - SUPPORTING DOCUMENTATION2
03/07/2023540244608Open ↗
03/07/2023540244608Open ↗
▸DOB NOWSite Survey: Initial2
08/22/2026S00812796-P1Open ↗
08/13/2026S00812796-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/22/2026S00812796-P1Open ↗
08/13/2026S00812796-I1Open ↗
▸DOB NOWPlot Diagram2
08/22/2026S00812796-P1Open ↗
08/13/2026S00812796-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/22/2026S00812796-P1Open ↗
08/22/2026S00812796-I1Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
01/30/2023540244608Open ↗
▸BISWAIVER OF CIRB ALIGNMENT1
03/07/2023540244608Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00812796-I1Open ↗