← Back
Walk-up cooperative
17 WEST 108 STREET
MANHATTAN · Upper West Side-Manhattan Valley · BIN 1055719
💬 Discuss this project
1900Year Built
6Stories
C6Building Class
R7-2Zoning
23,142 sfGross Floor Area
30Units
Rent Stabilized100 Open Violations 93 unresolved · 7 paperwork only ▸
Walk-up cooperative · Owner of record: 17-19 WEST 108 ST · 4,837 sf lot · 4.78 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 14p · 2 filings · 10 docs
Cellar3p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ALL AREA REALTY SERVICES707/08/2026
194 MANHATTAN DELI INC503/22/2026
17-19 WEST 108 ST1103/22/2026
17-19 WEST 108 ST GENERAL603/22/2026
GENERAL PROPERTY MANAGEMENT303/22/2026
17-19 W 108 STREET103/22/2026
17-19 W 108 ST GENERAL103/22/2026
17-19 WEST 108TH STREET HDFC303/21/2026
17 WEST 108TH HDFC103/21/2026
17 WEST 108 ST HDFC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.310/09/2023
METRO STRUCTURES108/08/2023
ASHRAF CORP107/06/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUPERIOR FIRE CONTROL103/21/2026
PINNACLE BUILDING CON103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUPERIOR FIRE CONTROL INCGeneral Contractor303/21/2026
JJT CONSTRUCTION INCGeneral Contractor107/08/2026
WASOFF PLBG & UTILITY COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808310/09/2023
ASHRAF CORPORATION1973107/06/2021
Building Lifecycle
All (81)Filed (5)Permit Issued (5)Signed Off (1)Violation (60)Inspection (2)Special Inspection (8)
03/11/2026
Violation issued (ECB, open)
Construction
03/11/2026
Violation issued (ECB, open)
Construction
03/11/2026
Violation issued (ECB, open)
Construction
02/10/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/14/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/02/2024
Permit issued — Plumbing
M00935231-S2-PL
04/03/2024
Inspection — No Access-Final Boiler Equipment Inspection
No Access
View inspection ↗
01/17/2024
Violation issued (HPD, open)
A
01/17/2024
Violation issued (HPD, closed)
C
01/17/2024
Violation issued (HPD, closed)
C
01/17/2024
Violation issued (HPD, open)
A
11/21/2023
Violation issued (HPD, closed)
C
11/10/2023
Violation issued (HPD, closed)
C
10/20/2023
Permit issued — Boiler Equipment
M00935231-I1-BE
10/18/2023
Signed off — Alteration
INTERIOR NON STRUCTURAL RENOVATION OF APARTMENT 89 AT FIRST FLOOR, AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY OF BUILDING DE TO PROPOED WORK.
M00916163-I1
10/18/2023
Permit issued — Boiler Equipment
M00935231-S1-BE
10/09/2023
Filed — Alteration
REPLACE BOILER AND OIL BURNER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00935231-S1
10/09/2023
Filed — Alteration
REPLACE BOILER AND OIL BURNER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00935231-I1
10/09/2023
Filed — Alteration
REPLACE BOILER AND OIL BURNER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00935231-S2
09/18/2023
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Joseph Bazini
09/18/2023
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
09/18/2023
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
08/17/2023
Permit issued — General Construction
M00916163-I1-GC
08/08/2023
Filed — Alteration
INTERIOR NON STRUCTURAL RENOVATION OF APARTMENT 89 AT FIRST FLOOR, AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY OF BUILDING DE TO PROPOED WORK.
M00916163-I1
08/08/2023
Special inspection requirement — Fire-Resistance Rated Construction
Augustine Angba
08/08/2023
Special inspection requirement — Final
Augustine Angba
08/08/2023
Special inspection requirement — Energy Code Compliance Inspections
Augustine Angba
06/27/2023
Violation issued (ECB, open)
Construction
06/27/2023
Violation issued (ECB, open)
Construction
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/17/2022
Violation issued (HPD, open)
C
08/17/2022
Violation issued (HPD, open)
A
08/17/2022
Violation issued (HPD, open)
A
08/17/2022
Violation issued (HPD, open)
B
08/17/2022
Violation issued (HPD, open)
A
08/17/2022
Violation issued (HPD, open)
B
08/17/2022
Violation issued (HPD, open)
C
08/17/2022
Violation issued (HPD, open)
C
08/17/2022
Violation issued (HPD, open)
B
08/17/2022
Violation issued (HPD, open)
C
08/17/2022
Violation issued (HPD, open)
A
08/17/2022
Violation issued (HPD, open)
B
08/17/2022
Violation issued (HPD, open)
C
07/27/2022
Violation issued (ECB, open)
Construction
07/26/2022
Violation issued (ECB, open)
Construction
03/11/2022
Violation issued (HPD, open)
C
07/08/2021
Permit issued — Mechanical Systems
M00541360-I1-MS
07/06/2021
Filed — Alteration
INSTALL NEW KITCHEN EXHAUST SYSTEM, HOOD AND DUCTWORK FOR EXISTING DELI. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00541360-I1
06/16/2021
Special inspection requirement — Final
Jay Kavi
06/16/2021
Special inspection requirement — Mechanical Systems
AKM HOQUE
02/02/2021
Violation issued (HPD, closed)
C
08/08/2019
Violation issued (ECB, open)
Construction
08/08/2019
Violation issued (ECB, closed)
Construction
09/11/2018
Violation issued (ECB, closed)
Construction
07/09/2018
Violation issued (HPD, open)
C
07/09/2018
Violation issued (HPD, open)
A
06/30/2018
Violation issued (HPD, open)
C
06/30/2018
Violation issued (HPD, open)
C
06/12/2018
Violation issued (HPD, closed)
C
06/12/2018
Violation issued (HPD, closed)
C
Latest 60 of 81 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedWASOFF PLBG & UTILITY CO05/02/2024
DOB NOWBoiler EquipmentSigned-offMICHAEL S. KAPLAN10/20/2023
DOB NOWBoiler EquipmentSigned-offMICHAEL S. KAPLAN10/18/2023
DOB NOWGeneral ConstructionSigned-offJJT CONSTRUCTION INC08/17/2023
DOB NOWMechanical SystemsPermit IssuedSUPERIOR FIRE CONTROL INC07/08/2021
BISOTISSUEDMARK CONTRACTING NY INC01/11/2019
BISOTISSUEDMARK CONTRACTING NY INC07/13/2018
BISOTISSUEDMARK CONTRACTING NY INC06/22/2017
BISOTISSUEDMARK CONTRACTING NY INC12/20/2016
BISOTISSUEDCOSTAL COMMUNITY BUILDERS06/23/2009
BISOTISSUEDNY SAFARI07/28/2004
BISOTISSUED2 SHELLS INTERIORS INC01/02/2004
BISPLISSUEDL&C BURNER SERVICE INC.06/21/1990
BISFSISSUEDL&C BURNER SERVICE INC.06/21/1990
1 project · most recent 07/06/2021
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/06/2021Permit IssuedSUPERIOR FIRE CONTROL INCVentilation Systems
Ventilation
Pen Vent USBI18DD 1,200 CFM · Kitchen Exhaust ×1
1 project · most recent 10/09/2023
Water/Sanitary
FiledStatusContractorScope
10/09/2023Permit IssuedWASOFF PLBG & UTILITY COWater/Sanitary
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/14/2024Pass-Final Boiler Equipment InspectionPassView ↗
04/03/2024No Access-Final Boiler Equipment InspectionNo AccessView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
09/18/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsJoseph Bazinispecial
09/18/2023Tenant Protection Plan ComplianceJoseph Bazinispecial
09/18/2023Tenant Protection Plan ComplianceJoseph Bazinispecial
08/08/2023Fire-Resistance Rated ConstructionAugustine Angbaprogress
08/08/2023FinalAugustine Angbaprogress
08/08/2023Energy Code Compliance InspectionsAugustine Angbaprogress
06/16/2021FinalJay Kaviprogress
06/16/2021Mechanical SystemsAKM HOQUEspecial
▾Documents — 69 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/03/2026M00541360-I1Request digital key ↗
08/29/2026M00916163-I1Request digital key ↗
08/29/2026M00935231-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION5
12/13/2018122739992Open ↗
10/19/2018123581864Open ↗
12/01/2016122935761Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION3
01/11/2019122739992Open ↗
12/29/2016122935761Open ↗
06/23/2009120080991Open ↗
▸Seals & Professional Certifications27
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
07/09/2019122935761Open ↗
07/09/2019122935761Open ↗
06/24/2019122739992Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/29/2026M00916163-I1Open ↗
08/29/2026M00935231-I1Open ↗
08/29/2026M00935231-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/28/2026M00916163-I1Open ↗
08/28/2026M00916163-I1Open ↗
08/28/2026M00916163-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026M00935231-S1Open ↗
09/23/2026M00935231-I1Open ↗
09/23/2026M00935231-S1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
12/01/2016122935761Open ↗
06/24/2009120080991Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/01/2016122935761Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/24/2009120080991Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
06/24/2009120080991Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
01/03/2019122739992Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/29/2026M00935231-S2Open ↗
08/29/2026M00935231-S1Open ↗
08/29/2026M00935231-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
12/13/2018122739992Open ↗
12/01/2016122935761Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/24/2009120080991Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
07/09/2019122935761Open ↗
06/24/2019122739992Open ↗
12/13/2018122739992Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
07/09/2019122935761Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
07/09/2019122935761Open ↗
06/24/2019122739992Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
06/24/2009120080991Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
07/09/2019122935761Open ↗
06/24/2019122739992Open ↗
12/13/2018122739992Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET4
12/13/2018122739992Open ↗
10/19/2018123581864Open ↗
12/01/2016122935761Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
07/09/2019122935761Open ↗
06/24/2019122739992Open ↗