Elevator apt, semi-fireproof with stores
17 WEST 125TH STREET
MANHATTAN · BIN 1053503
💬 Discuss this project
1900Year Built
5Stories
D7Building Class
C4-4AZoning
46,200 sfGross Floor Area
58Units
LL97 CoveredRent Stabilized57 Active Violations ▸
Elevator apt, semi-fireproof with stores · Owner of record: 125 Improvement Group · 11,491 sf lot · 4.02 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof7th Street Burger6p · 3 filings · 20 docs
Floor 5Denali Management7p · 4 filings · 20 docs
Floor 4Denali Management7p · 4 filings · 20 docs
Floor 3Unit 3G, Unit 3I8p · 5 filings · 20 docs
Floor 2Denali Management7p · 4 filings · 20 docs
Floor 1Aroen'sstore, 7th Street Burger, Unit 1A +161p · 12 filings · 20 docs
CellarAroen'sstore, 7th Street Burger34p · 7 filings · 20 docs
BasementSprint site decommissioning1p · 1 filing · 3 docs
Sub-BasementSprint site decommissioning1 filing · 3 docs
Site & exteriorInsomnia Cookies, Smile Direct Club4p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Thor 17 West 125th Street5903/21/2026
Thor Equities1607/08/2026
West 125th Realty1403/21/2026
Treetop Development503/21/2026
17 Wes 125 Street Holding403/21/2026
Chestnut Holdings303/22/2026
835 Realty303/21/2026
125 Improvement Group103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/12/2022$21.2M—— → —$459/sf building
08/19/2015$29.6M—MP WEST 125 LLC → THOR 17 WEST 125TH STREET LLC$641/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Manda Electric CompanyElectrical403/21/2026
Ariston ChimneyGeneral Contractor303/21/2026
Nationwide MechanicalPlumbing307/08/2026
Pronos ConstructionGeneral Contractor303/21/2026
JK NY InteriorGeneral Contractor303/21/2026
Cruz ElectricElectrical203/21/2026
TristruxGeneral Contractor203/21/2026
Signs CadSign hanger207/08/2026
KA&C MechanicalPlumbing207/08/2026
Mejia HectorElectrical103/21/2026
J. Sibaja Kitchen and VE*General Contractor107/08/2026
S.E. Electl ContngElectrical103/21/2026
Hecmar ElectricElectrical103/21/2026
MPS Plumbing & HeatingPlumbing107/08/2026
Unitech DesignSign hanger107/08/2026
CK Plumbing & MechanicalPlumbing107/08/2026
I Do Plumbing & HeatingPlumbing107/08/2026
Walsh LawrenceElectrical103/21/2026
Maximum ElectricElectrical103/21/2026
H-BuilderGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EC Special Inspections8355811/26/2024
LCW Engineering1103310/10/2024
New York Engineering Associates851308/12/2024
Lucid Building Engineering8196404/30/2024
KMB Design Group513104/29/2024
Technical Systems Review7409201/30/2024
Joseph Botta, PE1139205/01/2023
Beyond Arch3600110/04/2022
Korman Design & Build2055211/05/2020
Building Lifecycle
All (176)Filed (33)Permit Issued (18)Signed Off (13)Violation (60)Inspection (17)Objection (5)Special Inspection (30)
07/20/2026
Violation issued (HPD, open)
B
07/20/2026
Violation issued (HPD, open)
B
07/20/2026
Violation issued (HPD, open)
C
07/20/2026
Violation issued (HPD, open)
B
07/20/2026
Violation issued (HPD, open)
B
07/20/2026
Violation issued (HPD, open)
B
07/20/2026
Violation issued (HPD, open)
B
07/20/2026
Violation issued (HPD, open)
B
07/20/2026
Violation issued (HPD, open)
B
07/20/2026
Violation issued (HPD, open)
B
07/20/2026
Violation issued (HPD, open)
B
07/20/2026
Violation issued (HPD, open)
A
07/20/2026
Violation issued (HPD, open)
B
07/20/2026
Violation issued (HPD, open)
B
07/20/2026
Violation issued (HPD, open)
B
07/20/2026
Violation issued (HPD, open)
A
07/20/2026
Violation issued (HPD, open)
A
06/05/2026
Violation issued (HPD, closed)
C
06/05/2026
Violation issued (HPD, closed)
C
06/05/2026
Violation issued (HPD, open)
B
06/05/2026
Violation issued (HPD, open)
C
04/15/2026
Violation issued (HPD, closed)
A
04/03/2026
Violation issued (HPD, closed)
B
11/14/2025
Violation issued (HPD, closed)
B
11/14/2025
Violation issued (HPD, closed)
B
11/14/2025
Violation issued (HPD, open)
C
11/14/2025
Violation issued (HPD, open)
B
11/07/2025
Violation issued (HPD, closed)
B
11/07/2025
Violation issued (HPD, closed)
C
11/07/2025
Violation issued (HPD, closed)
B
09/26/2025
Signed off — Alteration
INSTALL CHIMNEY LINER IN EXISTING MASONRY CHIMNEY
M00964496-I1
08/28/2025
Violation issued (HPD, closed)
B
03/12/2025
Signed off — Alteration
INSTALL CHIMNEY LINER IN EXISTING MASONRY CHIMNEY
M00964496-S2
01/27/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
11/27/2024
Special inspection requirement — Post-installed Anchors
ABDALLAH ELCHERBINI
11/27/2024
Special inspection requirement — Tenant Protection Plan Compliance
11/26/2024
Filed — Alteration
New kitchen exhaust and make-up air system
M01009082-P4
11/22/2024
Special inspection requirement — Post-installed Anchors
ABDALLAH ELCHERBINI
11/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
11/22/2024
Special inspection requirement — Tenant Protection Plan Compliance
11/18/2024
Filed — Alteration
New kitchen exhaust and make-up air system
M01009082-P3
11/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
11/15/2024
Special inspection requirement — Tenant Protection Plan Compliance
11/15/2024
Special inspection requirement — Post-installed Anchors
ABDALLAH ELCHERBINI
11/14/2024
Signed off — Alteration
Subsequent filing for plumbing installation as per the plans filed herewith.
M01010160-S1
11/14/2024
Signed off — Alteration
Subsequent filing for plumbing installation as per the plans filed herewith.
M01010160-I1
10/11/2024
Special inspection requirement — Energy Code Compliance Inspections
luis wong
10/11/2024
Special inspection requirement — Final
luis wong
10/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
luis wong
10/11/2024
Special inspection requirement — Interior lighting power
luis wong
10/11/2024
Special inspection requirement — Lighting controls
luis wong
10/11/2024
Special inspection requirement — Tenant Protection Plan Compliance
luis wong
10/10/2024
Filed — Alteration
Subsequent filing for plumbing installation as per the plans filed herewith.
M01010160-P1
10/10/2024
Filed — Alteration
Subsequent filing for plumbing installation as per the plans filed herewith.
M01010160-P2
10/10/2024
Signed off — Alteration
New kitchen exhaust and make-up air system
M01009082-S1
10/04/2024
Violation issued (HPD, closed)
B
09/23/2024
Violation issued (HPD, closed)
B
09/19/2024
Special inspection requirement — HVAC-R and service water heating equipment
luis wong
09/19/2024
Special inspection requirement — Lighting controls
luis wong
Latest 60 of 176 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMPS Plumbing & Heating08/13/2024
DOB NOWGeneral ConstructionSigned-offAriston Chimney08/06/2024
DOB NOWAntennaSigned-offTristrux05/13/2024
DOB NOWPlumbingSigned-offKA&C Mechanical05/13/2024
DOB NOWMechanical SystemsSigned-offJ. Sibaja Kitchen and VE*05/02/2024
DOB NOWPlumbingPermit IssuedNationwide Mechanical04/22/2024
DOB NOWBoiler EquipmentSigned-offG. Bauer04/02/2024
DOB NOWGeneral ConstructionSigned-offH-Builder03/15/2024
DOB NOWPlumbingSigned-offKA&C Mechanical11/09/2023
DOB NOWSignSigned-offUnitech Design10/16/2023
DOB NOWPlumbingSigned-offCK Plumbing & Mechanical10/13/2023
DOB NOWGeneral ConstructionSigned-offJK NY Interior07/26/2023
DOB NOWPlumbingPermit IssuedNationwide Mechanical05/18/2023
DOB NOWPlumbingPermit IssuedNationwide Mechanical04/26/2023
DOB NOWGeneral ConstructionSigned-offPronos Construction10/24/2022
DOB NOWSignSigned-offSigns Cad05/13/2022
DOB NOWPlumbingSigned-offI Do Plumbing & Heating07/10/2020
DOB NOWSignSigned-offSigns Cad01/03/2019
BISOTISSUEDMksskr Consulting Service11/16/2022
BISOTISSUEDSigns Cad05/25/2022
BISOTISSUEDKenan Sign & Awning06/26/2020
BISPLISSUEDSuperior Plumbing & Heating04/05/2019
BISPLISSUEDAriel Services03/26/2019
BISPLISSUEDSuperior Plumbing & Heating03/25/2019
BISOTISSUEDCad Signs NYC02/13/2019
BISPLISSUEDSo Plumbing & Heating02/07/2019
BISOTISSUEDProsperity Construction*02/07/2019
BISOTISSUEDMelito Construction11/27/2018
BISOTISSUEDMelito Construction11/27/2018
BISEQISSUEDShallu Construction03/06/2018
BISPLISSUEDSatellite East Plumbing01/19/2018
BIS—RE-ISSUEDAL Restoration12/22/2017
BISOTISSUEDAllterior Contracting09/20/2017
BISPLISSUEDAdamjohn & Sons09/20/2017
BISEQISSUEDGul & G Contracting09/15/2017
BISOTISSUEDUnique Construction07/13/2017
BISOTISSUEDShalbro Construction Group06/08/2017
BISMHISSUEDA.A. Mechanical Sol05/08/2017
BISBLISSUEDMarlande Heating05/01/2017
BISOTISSUEDAllterior Contracting04/17/2017
+ 28 more permits on file
1 project · most recent 11/26/2024
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/26/2024Signed-offJ. Sibaja Kitchen and VE*Heating Systems, Ventilation Systems
Heating
Sterling TD150R1NS2100AK5P4P6 150,000 BTU · Ductwork ×1
Ventilation
Captiveaire EA-USBI18DD-RM 2,025 CFM · Kitchen Exhaust ×1
Greenheck BSQ-100-10X-3-QD-DR2 1,620 CFM · Makeup Air ×1
4 projects · most recent 11/26/2024
Gas
FiledStatusContractorScope
11/26/2024Signed-offKA&C MechanicalGas
01/30/2024——Gas
10/30/2023Signed-offKA&C MechanicalGas
08/01/2023Permit IssuedNationwide MechanicalGas
11 projects · most recent 10/12/2023
General Wiring
FiledStatusContractorScope
10/12/2023CompleteAtmos Electric Svce—
05/03/2023CompleteCounty Electrical Contractor IGeneral Wiring
04/04/2023Permit IssuedDorion Norton Electrical ContGeneral Wiring
07/08/2022CompleteSigns Cad—
02/26/2020CompleteResponse ElectricGeneral Wiring
03/15/2019CompleteIntelogic ElectricGeneral Wiring
01/03/2019CompleteAmpere Electrical Services—
10/09/2018CompleteCopper-City Electric1 meters, 1 new_meters
07/06/2018Permit IssuedC.Q. Electr'l Contracting57 meters, 3 new_meters
05/21/2018CompleteE & M Electrical NYGeneral Wiring
01/25/2018Permit IssuedC.Q. Electr'l ContractingGeneral Wiring
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
01/27/2025Pass-Final Boiler Equipment InspectionPassView ↗
09/18/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/11/2024Pass-Final General Construction Non-Directive 14PassView ↗
03/14/2024Fail-Final General Construction Non-Directive 14FailView ↗
12/08/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/08/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/20/2023Pass-Final Sign Permit InspectionPassView ↗
11/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/16/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/22/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/19/2023Fail-Final PL - Up to 9 Requested FloorsFailView ↗
08/25/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/27/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 79
DateRequirementInspectorRole
11/27/2024Tenant Protection Plan Compliance—special
11/27/2024Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
11/27/2024Post-installed AnchorsABDALLAH ELCHERBINIspecial
11/22/2024Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
11/22/2024Post-installed AnchorsABDALLAH ELCHERBINIspecial
11/22/2024Tenant Protection Plan Compliance—special
11/15/2024Post-installed AnchorsABDALLAH ELCHERBINIspecial
11/15/2024Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
11/15/2024Tenant Protection Plan Compliance—special
10/11/2024Interior lighting powerluis wongenergy_progress
10/11/2024Energy Code Compliance Inspectionsluis wongprogress
10/11/2024Fire-Resistant Penetrations and Jointsluis wongspecial
10/11/2024Tenant Protection Plan Complianceluis wongspecial
10/11/2024Lighting controlsluis wongenergy_progress
10/11/2024Finalluis wongprogress
09/19/2024HVAC-R and service water heating equipmentluis wongenergy_progress
09/19/2024HVAC-R and service water piping design and insulationluis wongenergy_progress
09/19/2024Energy Code Compliance Inspectionsluis wongprogress
09/19/2024Tenant Protection Plan Compliance—special
09/19/2024Fire-Resistant Penetrations and Jointsluis wongspecial
09/19/2024Tenant Protection Plan Compliance—special
09/19/2024Energy Code Compliance Inspectionsluis wongprogress
09/19/2024Finalluis wongprogress
09/19/2024Interior lighting powerluis wongenergy_progress
09/19/2024Lighting controlsluis wongenergy_progress
Latest 25 of 79.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Aroen'sstoreRetailFloor 1
Project M01010160 Alteration · LOC Issued · 03/06/2024
7th Street BurgerRestaurant / Food ServiceCellar, Floor 1
Project M01009082 Alteration · Permit Entire · 02/28/2024
Cap't LouiRestaurant / Food ServiceFloor 1
Project M00895413 Alteration · LOC Issued · 07/11/2023
Project M00898802 Alteration · LOC Issued · 07/11/2023
Insomnia CookiesRestaurant / Food Service—
Project M00648406 Alteration · LOC Issued · 05/13/2022
Smile Direct ClubMedical / HealthcareFloor 1
Project M00106102 Alteration · LOC Issued · 01/03/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 653 on file (BIS + DOB NOW)
▸Plans & Drawings33
▸DOB NOWPlans/Sketch31
09/05/2026M00106102-I1Request digital key ↗
09/02/2026M00648406-I1Request digital key ↗
09/01/2026M08001667-I1Request digital key ↗
Showing 3 of 31 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00257296-I1Request digital key ↗
08/15/2026M00257296-P1Request digital key ↗
▸Applications & Permits108
▸BISPLAN / WORK APPROVAL APPLICATION54
11/16/2022123036749Open ↗
05/24/2022141019074Open ↗
04/27/2020123740256Open ↗
Showing 3 of 54 on file for this type
▸BISWORK PERMIT APPLICATION53
11/16/2022123036749Open ↗
05/25/2022141019074Open ↗
06/26/2020123740256Open ↗
Showing 3 of 53 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/18/2018123350970Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
02/14/2019123517596Open ↗
02/14/2019123517596Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
12/06/2018123350970Open ↗
▸Seals & Professional Certifications204
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION62
11/06/2019123740256Open ↗
08/02/2019123555376Open ↗
08/02/2019123555376Open ↗
Showing 3 of 62 on file for this type
▸DOB NOWProgress Inspector Seal & Signature33
09/23/2026M00964496-I1Open ↗
09/23/2026M00964496-I1Open ↗
09/23/2026M00964496-I1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature33
09/05/2026M00257296-I1Open ↗
09/05/2026M00257296-P1Open ↗
08/31/2026M00841752-I1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
10/03/2026M01009082-I1Open ↗
09/23/2026M00964496-I1Open ↗
09/23/2026M00964496-I1Open ↗
Showing 3 of 25 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT21
05/24/2022141019074Open ↗
05/28/2019123685271Open ↗
02/07/2019123675745Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST17
05/28/2019123685271Open ↗
02/07/2019123675745Open ↗
11/27/2018123555376Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
05/24/2022141019074Open ↗
12/17/2018140823198Open ↗
Showing 2 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
05/24/2022141019074Open ↗
12/17/2018140823198Open ↗
Showing 2 of 5 on file for this type
▸BISProfessional and Owner Certification (POC3)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment28
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE19
05/28/2019123685271Open ↗
11/06/2017123350970Open ↗
Showing 2 of 19 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS1
05/02/2019123675745Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
05/02/2019123675745Open ↗
▸Safety & Tenant Protection21
▸BISTenant Protection Plan and Notes16
11/06/2019123740256Open ↗
05/28/2019123685271Open ↗
02/07/2019123675745Open ↗
Showing 3 of 16 on file for this type
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
05/25/2022141019074Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
02/12/2019123517596Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00257296-I1Open ↗
▸Environmental & Asbestos57
▸DOB NOWDEP ACP-5: Asbestos Assessment Report32
09/05/2026M00257296-I1Open ↗
08/31/2026M00841752-I1Open ↗
08/30/2026M00898802-I1Open ↗
Showing 3 of 32 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)23
11/06/2019123740256Open ↗
05/28/2019123685271Open ↗
02/07/2019123675745Open ↗
Showing 3 of 23 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance43
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS26
11/06/2019123740256Open ↗
08/02/2019123555376Open ↗
02/07/2019123675745Open ↗
Showing 3 of 26 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
01/15/2021123740256Open ↗
08/02/2019123555376Open ↗
05/03/2019123675745Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
08/18/2022141019074Open ↗
05/24/2022141019074Open ↗
01/15/2021123740256Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
05/24/2022141019074Open ↗
12/17/2018140823198Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/18/2022141019074Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00964496-I1Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY11
08/18/2022141019074Open ↗
08/18/2022141019074Open ↗
05/24/2022141019074Open ↗
Showing 3 of 11 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
11/27/2018123142483Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
05/25/2022141019074Open ↗
▸Approvals, Objections & Sign-offs31
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST16
08/19/2022141019074Open ↗
01/15/2021123740256Open ↗
08/02/2019123555376Open ↗
Showing 3 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
03/26/2019123675745Open ↗
02/07/2019123675745Open ↗
08/22/2018140602140Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER3
11/16/2022123036749Open ↗
04/05/2019123675745Open ↗
03/27/2019123675745Open ↗
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSHED LETTER1
03/07/2018140600927Open ↗
▸Cost, Insurance & Ownership42
▸BISCOST AFFIDAVIT41
05/24/2022141019074Open ↗
01/15/2021123740256Open ↗
04/27/2020123740256Open ↗
Showing 3 of 41 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
08/18/2022141019074Open ↗
▸Filing & Intake Forms65
▸BISEFILING COVER SHEET28
11/06/2019123740256Open ↗
05/28/2019123685271Open ↗
02/14/2019123517596Open ↗
Showing 3 of 28 on file for this type
▸BISBOROUGH INTAKE FORM16
04/27/2020123740256Open ↗
08/02/2019123555376Open ↗
05/03/2019123675745Open ↗
Showing 3 of 16 on file for this type
▸BISADDITIONAL INFORMATION15
07/10/2020123740256Open ↗
05/01/2020123740256Open ↗
06/27/2018123350970Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
05/24/2022141019074Open ↗
12/17/2018140823198Open ↗
Showing 2 of 6 on file for this type
▸Other Documents5
▸BISPLOT DIAGRAM3
11/13/2017123350970Open ↗
Showing 1 of 3 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
02/14/2019123517596Open ↗
02/12/2019123517596Open ↗