← Back
Elevator cooperative
168 EAST 79 STREET
MANHATTAN · Upper East Side-Carnegie Hill · BIN 1043253
💬 Discuss this project
1927Year Built
15Stories
D4Building Class
R10AZoning
51,988 sfGross Floor Area
26Units
LL97 CoveredRent Stabilized7 Open Violations ▸FISP: UNSAFE
Elevator cooperative · Owner of record: 170 TENANTS CORP · 4,470 sf lot · 11.63 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction5p · 1 filing · 17 docs
Floor 13Under Construction4p · 1 filing · 20 docs
Floor 12
Floor 11
Floor 101p · 1 filing · 3 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 43p · 1 filing · 13 docs
Floor 32p · 1 filing · 13 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
170 TENANTS6707/08/2026
170 EAST 78TH STREET OWNE103/22/2026
170 TENANT CORP INSIGNIA103/22/2026
170 TENANTS CP103/22/2026
KEY REAL ESTATE ASSOCIATES303/21/2026
79 STREET OWNERS103/21/2026
170 TENATS303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARINNITY NYC203/21/2026
CODE603/21/2026
UNITED SAFETY CONSULTANTS403/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
HIERARCH-E403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPRING SCAFFOLDING LLCGeneral Contractor1408/12/2026
POFI CONSTRUCTION CORPGeneral Contractor207/08/2026
BEKKERMAN, MIKHAILElectrical103/21/2026
DEMETRIOS NIONAKISElectrical103/21/2026
DEYI LINGElectrical103/21/2026
FIU CORP DBA FIU ELECTRICElectrical103/22/2026
FOTAKOS ARISTEDESElectrical103/21/2026
IRVING BAPTISTEElectrical103/21/2026
JOSEPH NORIEGA, JRElectrical103/21/2026
MP & L METAL INCElectrical103/21/2026
SALAMON ENGINEERING PLLCElectrical103/21/2026
VAN VASSELLElectrical103/21/2026
VAQUERO, RICHARDElectrical103/21/2026
GALLERY RESTORATION LTDGeneral Contractor104/09/2026
REVO CONSTRUCTION INCGeneral Contractor107/08/2026
HYDROKINETIC PLBG & HTG IPlumbing107/08/2026
ARISTEDES FOTAKOSElectrical103/21/2026
MONARCH PLUMB & HTG LLCPlumbing107/08/2026
BEIL, SHELDONElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDTECH ENGINEERING6369407/17/2026
GEORGE J. XERAKIAS, PE1658201/20/2026
JOSEPH K. BLUM CO. LLP1741112/04/2024
ALAN MARGOLIN & ASSOC423301/02/2024
Building Lifecycle
All (145)Filed (17)Permit Issued (18)Signed Off (2)Facade (FISP) (21)Violation (53)Inspection (4)Special Inspection (30)
08/19/2026
Filed — Alteration
Plumbing plans filed herewith to show addition of gas dryer and related piping, remove, replace, and relocate fixtures and associated piping. No change to use, egress, or occupancy.
M01434146-S2
08/19/2026
Filed — Alteration
Plumbing plans filed herewith to show addition of gas dryer and related piping, remove, replace, and relocate fixtures and associated piping. No change to use, egress, or occupancy.
M01434146-S1
08/17/2026
Filed — Alteration
Plumbing plans filed herewith to show addition of gas dryer and related piping, remove, replace, and relocate fixtures and associated piping. No change to use, egress, or occupancy.
M01434146-I1
08/11/2026
Permit issued — Sidewalk Shed
M01004490-I1-SH
08/10/2026
Cycle 9 facade report signed — UNSAFE
08/07/2026
Special inspection requirement — Lighting in dwelling units
08/07/2026
Special inspection requirement — Energy Code Compliance Inspections
08/07/2026
Special inspection requirement — Interior lighting power
08/07/2026
Special inspection requirement — Lighting controls
08/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Luis Pichardo
08/06/2026
Special inspection requirement — Post-installed Anchors
Luis Pichardo
08/05/2026
Cycle 9 facade report submitted
08/05/2026
Cycle 9 facade inspection completed
07/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/21/2026
Special inspection requirement — Final
07/21/2026
Special inspection requirement — Mechanical Systems
07/21/2026
Special inspection requirement — Maintenance information
07/21/2026
Special inspection requirement — Final
07/21/2026
Special inspection requirement — Post-installed Anchors
07/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/21/2026
Special inspection requirement — Post-installed Anchors
07/21/2026
Special inspection requirement — Shutoff dampers
07/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/21/2026
Special inspection requirement — Maintenance information
07/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/21/2026
Special inspection requirement — Duct leakage testing, insulation and design
07/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/17/2026
Filed — Alteration
NEW PLUMBING WORK APT #13B
M01295821-P5
07/17/2026
Filed — Alteration
NEW PLUMBING WORK APT #13B
M01295821-P1
06/23/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE PIPE SCAFFOLD IS TOP OF THE SIDEWALK SHED AND PASSES THE MAIN ROOF PARAPET WALL, BUILDING FRONT OF THE BUILDING
M01004490-S3
05/22/2026
Permit issued — Sidewalk Shed
M01004490-I1-SH
05/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
RONALD VILLANO
05/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
Luis Pichardo
05/06/2026
Special inspection requirement — Lighting in dwelling units
RONALD VILLANO
05/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
Luis Pichardo
05/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
Luis Pichardo
05/06/2026
Special inspection requirement — Final
RONALD VILLANO
05/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Luis Pichardo
04/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/05/2026
Permit issued — Supported Scaffold
M01004490-S3-SF
02/26/2026
Permit issued — Supported Scaffold
M01004490-S3-SF
02/26/2026
Permit issued — Sidewalk Shed
M01004490-I1-SH
02/18/2026
Permit issued — Sidewalk Shed
M01004490-I1-SH
02/04/2026
Permit issued — General Construction
M01086496-I1-GC
01/20/2026
Filed — Alteration
suspended scaffold installation as per plans filed herewith.
M01086496-P1
12/30/2025
Permit issued — General Construction
M01295821-I1-GC
12/27/2025
Permit issued — Suspended Scaffold
M01086496-S1-SC
11/24/2025
Permit issued — Plumbing
M01295821-S1-PL
11/13/2025
Cycle 9 facade report submitted
11/13/2025
Cycle 9 facade inspection completed
11/13/2025
Cycle 9 facade report signed — UNSAFE
10/21/2025
Filed — Alteration
NEW PLUMBING WORK APT #13B
M01295821-S1
10/15/2025
Filed — Alteration
NEW PLUMBING WORK APT #13B
M01295821-I1
04/17/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE PIPE SCAFFOLD IS TOP OF THE SIDEWALK SHED AND PASSES THE MAIN ROOF PARAPET WALL, BUILDING FRONT OF THE BUILDING
M01004490-S3
04/17/2025
Permit issued — Supported Scaffold
M01004490-S3-SF
04/09/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE PIPE SCAFFOLD IS TOP OF THE SIDEWALK SHED AND PASSES THE MAIN ROOF PARAPET WALL, BUILDING FRONT OF THE BUILDING
M01004490-S2
03/03/2025
Violation issued (ECB, closed)
Construction
Latest 60 of 145 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC08/11/2026
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC05/22/2026
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC03/05/2026
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC02/26/2026
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC02/26/2026
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC02/18/2026
DOB NOWGeneral ConstructionPermit IssuedPOFI CONSTRUCTION CORP02/04/2026
DOB NOWGeneral ConstructionPermit IssuedGALLERY RESTORATION LTD12/30/2025
DOB NOWSuspended ScaffoldPermit IssuedPOFI CONSTRUCTION CORP12/27/2025
DOB NOWPlumbingPermit IssuedHYDROKINETIC PLBG & HTG I11/24/2025
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC04/17/2025
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC02/12/2025
DOB NOWGeneral ConstructionPermit IssuedPOFI CONSTRUCTION CORP02/07/2025
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC01/17/2025
DOB NOWSuspended ScaffoldPermit IssuedPOFI CONSTRUCTION CORP01/03/2025
DOB NOWPlumbingSigned-offMONARCH PLUMB & HTG LLC02/14/2024
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC02/14/2024
DOB NOWGeneral ConstructionPermit IssuedREVO CONSTRUCTION INC01/11/2024
BISOTISSUEDPOFI CONSTRUCTION CORP12/18/2019
BISPLISSUEDP.S.I. MECHANICAL05/22/2019
BISOTISSUEDMANHATTAN CABINETS, INC05/13/2019
BISOTISSUEDMANHATTAN CABINETS, INC08/22/2018
BISPLISSUEDSO PLUMBING & HEATING INC05/10/2018
BISOTISSUEDMANHATTAN CABINETS, INC05/08/2018
BISOTISSUEDAMSTERDAM RESTORATION LLC11/15/2017
BISEQISSUEDCONSOLIDATED SCAFFOLD & BRIDGE08/07/2017
BISPLISSUEDARIANA CONTRACTING INC12/23/2016
BISOTISSUEDSPILIOS & ASSOCIATES INC10/27/2016
BISEQISSUEDCONSOLIDATED SCAFFOLD & BRIDGE08/10/2016
BISOTISSUEDA. EIDELBERG GENL CONT LL04/27/2016
BISPLISSUEDCALRAY GAS HEAT CORP02/05/2016
BISOTISSUEDA. EIDELBERG GENL CONT LL01/29/2016
BISPLISSUEDA.M.N. CORPORATION05/04/2015
BISOTISSUEDLINDEN MARSHALL CONTRACTING INC01/21/2014
BISPLISSUEDPELHAM PLUMBING & HTG CORP01/16/2014
BISPLISSUEDBENT MECHANICAL CORP09/25/2013
BISPLISSUEDQMB PLUMBING & HEATING INC09/03/2013
BISOTISSUEDHNL CONSTRUCTION COMPANY08/19/2013
BISMHISSUEDAPRICOT SALMON CORP07/23/2013
BISOTISSUEDAPRICOT SALMON CORP07/23/2013
+ 28 more permits on file
3 projects · most recent 08/19/2026
Heating and Air Conditioning Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/19/2026——Heating and Air Conditioning Systems
Heat / Cool
Islandaire EZ CS-15 14,800 BTU · Ptac ×1
07/17/2026Permit IssuedGALLERY RESTORATION LTDAir Conditioning Systems
Cooling
— AIR CONDITIONER WITH TOP-MOUNTED HYDRONIC HEAT MODEL # NYWC15K00E7 14,800 BTU · Ptac ×4
AIR CONDITIONER WITH TOP-MOUNTED HYDRONIC HEAT MODEL #NYWC09K00E7 9,600 BTU · Ptac ×4
AIR CONDITIONER WITH TOP-MOUNTED HYDRONIC HEAT MODEL# NYWC12K00E7 12,600 BTU · Ptac ×2
01/02/2024Permit IssuedREVO CONSTRUCTION INCHeating and Air Conditioning Systems
Heat / Cool
Islandaire PTAC-1 EZ09RMG2G2 260 CFM · Ptac ×1
PTAC-2 EZNY12A2G2 340 CFM · Ptac ×1
3 projects · most recent 08/19/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/19/2026——Gas, Water/Sanitary
07/17/2026Permit IssuedHYDROKINETIC PLBG & HTG IGas, Water/Sanitary
01/02/2024Signed-offMONARCH PLUMB & HTG LLCWater/Sanitary
7 projects · most recent 09/19/2026
General Wiring
FiledStatusContractorScope
09/19/2026Permit IssuedNew Century Electrical ContractingGeneral Wiring
01/05/2026Permit IssuedNION ELECTRIC CORPGeneral Wiring
03/24/2024CompleteEINSTEIN ELEC'L CORPGeneral Wiring
02/08/2024Permit IssuedTOP SHELF ELECTRIC CORP—
01/10/2024CompleteFIU CORP DBA FIU ELECTRICGeneral Wiring
10/09/2019Permit IssuedPHILIP A. ROBINSONGeneral Wiring
11/26/2018CompleteC.L. ELECTRIC CORPGeneral Wiring
1 project · most recent 04/17/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
04/17/2025Permit IssuedSPRING SCAFFOLDING LLCScaffold, Sidewalk Shed
1 project · most recent 01/20/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
01/20/2026Permit IssuedPOFI CONSTRUCTION CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/29/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/15/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/16/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/26/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
08/07/2026Interior lighting power—energy_progress
08/07/2026Lighting controls—energy_progress
08/07/2026Lighting in dwelling units—energy_progress
08/07/2026Energy Code Compliance Inspections—progress
08/06/2026Fire-Resistant Penetrations and JointsLuis Pichardospecial
08/06/2026Post-installed AnchorsLuis Pichardospecial
07/21/2026Tenant Protection Plan Compliance—special
07/21/2026Fire-Resistant Penetrations and Joints—special
07/21/2026Post-installed Anchors—special
07/21/2026Fire-Resistance Rated Construction—progress
07/21/2026Final—progress
07/21/2026Tenant Protection Plan Compliance—special
07/21/2026Fire-Resistant Penetrations and Joints—special
07/21/2026HVAC-R and service water piping design and insulation—energy_progress
07/21/2026Maintenance information—energy_progress
07/21/2026Mechanical Systems—special
07/21/2026Post-installed Anchors—special
07/21/2026Tenant Protection Plan Compliance—special
07/21/2026Final—progress
07/21/2026Duct leakage testing, insulation and design—energy_progress
07/21/2026Shutoff dampers—energy_progress
07/21/2026HVAC-R and service water heating equipment—energy_progress
07/21/2026Maintenance information—energy_progress
05/06/2026HVAC-R and service water heating equipmentLuis Pichardoenergy_progress
05/06/2026Lighting in dwelling unitsRONALD VILLANOenergy_progress
Latest 25 of 62.
▾Documents — 377 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/28/2026M00935157-S1Request digital key ↗
08/28/2026M00935157-I1Request digital key ↗
08/28/2026M00935157-S2Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits65
▸BISWORK PERMIT APPLICATION37
12/17/2019140875300Open ↗
05/22/2019123159401Open ↗
05/13/2019123159401Open ↗
Showing 3 of 37 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION28
01/29/2024140875300Open ↗
12/17/2019140875300Open ↗
11/21/2018123435657Open ↗
Showing 3 of 28 on file for this type
▸Seals & Professional Certifications102
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION37
02/13/2020123159401Open ↗
02/13/2020123159401Open ↗
02/08/2019122725417Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/01/2026M01295821-I1Open ↗
09/01/2026M01295821-I1Open ↗
09/01/2026M01295821-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/28/2026M00935157-I1Open ↗
08/28/2026M00935157-S2Open ↗
08/28/2026M00935157-S1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/02/2026M01295821-P1Open ↗
09/02/2026M01295821-P1Open ↗
09/01/2026M01295821-I1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
10/24/2017123076250Open ↗
10/28/2016122922926Open ↗
08/15/2016122799356Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
12/17/2019140875300Open ↗
10/24/2017123076250Open ↗
10/28/2016122922926Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/17/2019140875300Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/17/2019140875300Open ↗
▸Trade Schedules & Equipment32
▸BISSELF-CERT PLUMBING NOTICE14
04/17/2014121625492Open ↗
03/26/2014121625492Open ↗
11/21/2013121715126Open ↗
Showing 3 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
11/21/2018123435657Open ↗
06/13/2018123159401Open ↗
05/30/2018123435657Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING7
09/16/2013121715126Open ↗
Showing 1 of 7 on file for this type
▸BISEQUIPMENT USE PERMITS2
05/15/2014121715117Open ↗
05/15/2014121715117Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
05/09/2014121715117Open ↗
▸Safety & Tenant Protection8
▸BISTenant Protection Plan and Notes8
06/13/2018123159401Open ↗
04/24/2018123435657Open ↗
04/24/2018123435657Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos25
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/28/2026M00935157-I1Open ↗
08/28/2026M00935157-S2Open ↗
08/28/2026M00935157-S1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
08/16/2018123159401Open ↗
04/24/2018123435657Open ↗
10/28/2016122922926Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
12/17/2019140875300Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
12/17/2019140875300Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance34
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS20
02/13/2020123159401Open ↗
02/13/2020123159401Open ↗
02/08/2019122725417Open ↗
Showing 3 of 20 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
02/13/2020123159401Open ↗
01/23/2019123435657Open ↗
05/15/2017122922926Open ↗
Showing 3 of 7 on file for this type
▸BISTR8: Energy Code Progress Inspections2
06/09/2014121715117Open ↗
05/15/2014121715117Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/29/2024140875300Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/29/2024140875300Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/17/2019140875300Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/17/2019140875300Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/17/2019140875300Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
01/29/2024140875300Open ↗
▸BISMASONRY1
01/29/2024140875300Open ↗
▸Approvals, Objections & Sign-offs23
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
01/30/2024140875300Open ↗
02/13/2020123159401Open ↗
02/08/2019122725417Open ↗
Showing 3 of 11 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
08/10/2017122799356Open ↗
01/30/2015110015885Open ↗
Showing 2 of 3 on file for this type
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFINAL1
01/29/2024140875300Open ↗
▸Cost, Insurance & Ownership30
▸BISCOST AFFIDAVIT28
02/13/2020123159401Open ↗
02/13/2020123159401Open ↗
12/17/2019140875300Open ↗
Showing 3 of 28 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
10/28/2016122922926Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/29/2024140875300Open ↗
▸Filing & Intake Forms29
▸BISEFILING COVER SHEET14
06/13/2018123159401Open ↗
04/24/2018123435657Open ↗
10/24/2017123076250Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION8
12/31/2019123159401Open ↗
12/11/2017122799356Open ↗
12/08/2017122799356Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM6
02/13/2020123159401Open ↗
02/08/2019122725417Open ↗
01/23/2019123435657Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
12/17/2019140875300Open ↗
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
08/22/2018123159401Open ↗
02/03/2016121939144Open ↗
01/23/2014121625492Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form2
05/09/2018123435657Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWCalculations2
08/13/2026M01086496-P1Open ↗
08/13/2026M01086496-S1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026M01086496-S1Open ↗
08/13/2026M01086496-P1Open ↗