RoofPacker Collegiate InstituteUnder Construction62p · 8 filings · 20 docs
ArchitectureGeneralMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural
INSTALLATION OF (3) NEW ELECTRIC HOT WATER BOILERS (LAARS EB-135-2080) AT 4TH FLOOR MECHANICAL ROOM AS AS PER PLANS. RELATED PLUMBING AND MECHANICAL WORK FILED SUBSEQUENTLY.
On file for this project
57 documents · 5 drawing sheets
Install new 6 ton HVAC unit at roof, ductwork modification to accommodate Architectural changes- new VRF heat recovery split system
On file for this project
9 documents · 1 drawing sheet
New self contained ceiling hung package AC unit and associated duct piping and accessories at elevator machine room.
On file for this project
23 documents
Latest 3 of 8 filings on this floor.
Floor 5Packer Collegiate InstituteUnder Construction38p · 3 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
INSTALLATION OF (3) NEW ELECTRIC HOT WATER BOILERS (LAARS EB-135-2080) AT 4TH FLOOR MECHANICAL ROOM AS AS PER PLANS. RELATED PLUMBING AND MECHANICAL WORK FILED SUBSEQUENTLY.
On file for this project
57 documents · 3 drawing sheets
Propose to remove exterior fire escape. Doors to fire escape to be sealed and made non operable, replacing and installing new fire doors at exit stair and corridor.
On file for this project
6 documents · 1 drawing sheet
HEREBY FILING NEW HVAC UNITS WITH STRUCTURAL SUPPORT AND DUCTWORK ON FLOORS 3-5, AND ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY, STRUCTURAL SUPPORT TO BE FILED UNDER SEPARATE APPLICATION.
On file for this project
24 documents
Floor 4Packer Collegiate InstituteUnder Construction44p · 3 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Structural
INSTALLATION OF (3) NEW ELECTRIC HOT WATER BOILERS (LAARS EB-135-2080) AT 4TH FLOOR MECHANICAL ROOM AS AS PER PLANS. RELATED PLUMBING AND MECHANICAL WORK FILED SUBSEQUENTLY.
On file for this project
57 documents · 6 drawing sheets
Propose to remove exterior fire escape. Doors to fire escape to be sealed and made non operable, replacing and installing new fire doors at exit stair and corridor.
On file for this project
6 documents · 1 drawing sheet
HEREBY FILING NEW HVAC UNITS WITH STRUCTURAL SUPPORT AND DUCTWORK ON FLOORS 3-5, AND ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY, STRUCTURAL SUPPORT TO BE FILED UNDER SEPARATE APPLICATION.
On file for this project
24 documents · 2 drawing sheets
Floor 3Packer Collegiate Institute, Unit 3BUnder Construction47p · 4 filings · 20 docs
ArchitectureGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
INSTALLATION OF (3) NEW ELECTRIC HOT WATER BOILERS (LAARS EB-135-2080) AT 4TH FLOOR MECHANICAL ROOM AS AS PER PLANS. RELATED PLUMBING AND MECHANICAL WORK FILED SUBSEQUENTLY.
On file for this project
57 documents
Interior renovation for classrooms , minor partition work.
On file for this project
6 documents · 1 drawing sheet
Propose to remove exterior fire escape. Doors to fire escape to be sealed and made non operable, replacing and installing new fire doors at exit stair and corridor.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 2Packer Collegiate InstituteUnder Construction83p · 8 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
INSTALLATION OF (3) NEW ELECTRIC HOT WATER BOILERS (LAARS EB-135-2080) AT 4TH FLOOR MECHANICAL ROOM AS AS PER PLANS. RELATED PLUMBING AND MECHANICAL WORK FILED SUBSEQUENTLY.
On file for this project
57 documents · 2 drawing sheets
Removal of existing windows and doors. Installation of new fire rated windows and masonry walls to infill existing window/door openings.
On file for this project
5 documents
Demolition and installation of interior partitions and ceilings as shown on plans.
On file for this project
17 documents · 9 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 1Packer Collegiate InstituteUnder Construction116p · 12 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
INSTALLATION OF (3) NEW ELECTRIC HOT WATER BOILERS (LAARS EB-135-2080) AT 4TH FLOOR MECHANICAL ROOM AS AS PER PLANS. RELATED PLUMBING AND MECHANICAL WORK FILED SUBSEQUENTLY.
On file for this project
57 documents · 2 drawing sheets
Removal of existing windows and doors. Installation of new fire rated windows and masonry walls to infill existing window/door openings.
On file for this project
5 documents
Demolition and installation of interior partitions and ceilings as shown on plans.
On file for this project
17 documents · 6 drawing sheets
Latest 3 of 12 filings on this floor.
MezzaninePacker Collegiate Institute1 filing · 5 docs
No filed description on record for this project.
On file for this project
5 documents · 7 drawing sheets
CellarPacker Collegiate Institute11p · 3 filings · 20 docs
MechanicalPlumbing
Issued Permit Scope
Boiler Equipment · Mechanical Systems · Plumbing
REPLACE BOILER AND REINSTALL EXISTING GAS/OIL BURNER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
12 documents · 1 drawing sheet
RECONNECT TO EXISTING GAS PIPING FOR REPLACEMENT BOILER AND REINSTALLATION OF EXISTING GAS/OIL BURNER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents · 1 drawing sheet
HEREBY FILING INSTALLATION OF NEW CONDENSER UNITS IN AREA WAY OF BUILDING (EXTERIOR) AND ON CELLAR LEVEL AS PER PLANS FILED HEREWITH.
On file for this project
5 documents
BasementPacker Collegiate InstituteUnder Construction27p · 6 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
INSTALLATION OF (3) NEW ELECTRIC HOT WATER BOILERS (LAARS EB-135-2080) AT 4TH FLOOR MECHANICAL ROOM AS AS PER PLANS. RELATED PLUMBING AND MECHANICAL WORK FILED SUBSEQUENTLY.
On file for this project
57 documents · 3 drawing sheets
Demolition and installation of interior partitions and ceilings as shown on plans.
On file for this project
17 documents · 2 drawing sheets
Install new 6 ton HVAC unit at roof, ductwork modification to accommodate Architectural changes- new VRF heat recovery split system
On file for this project
9 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Sub-BasementPacker Collegiate InstituteUnder Construction98p · 10 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
INSTALLATION OF (3) NEW ELECTRIC HOT WATER BOILERS (LAARS EB-135-2080) AT 4TH FLOOR MECHANICAL ROOM AS AS PER PLANS. RELATED PLUMBING AND MECHANICAL WORK FILED SUBSEQUENTLY.
On file for this project
57 documents
Removal of existing windows and doors. Installation of new fire rated windows and masonry walls to infill existing window/door openings.
On file for this project
5 documents
Demolition and installation of interior partitions and ceilings as shown on plans.
On file for this project
17 documents
Latest 3 of 10 filings on this floor.
Site & exteriorPacker Collegiate Institute9p · 7 filings · 20 docs
ArchitectureGeneralMechanical
Issued Permit Scope
General Construction · Mechanical Systems
HEREBY FILING TEMPORARY TENT STRUCTURE FOR ONE DAY EVENT USE IN OUTDOOR GARDEN OF PACKER COLLEGIATE INSTITUTE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 2 drawing sheets
HEREBY FILING INSTALLATION OF NEW CONDENSER UNITS IN AREA WAY OF BUILDING (EXTERIOR) AND ON CELLAR LEVEL AS PER PLANS FILED HEREWITH.
On file for this project
5 documents · 2 drawing sheets
No filed description on record for this project.
On file for this project
3 documents · 3 drawing sheets
Latest 3 of 7 filings on this floor.
Filed — no permit issuedPacker Collegiate Institute9p · 2 filings · 20 docs
ArchitectureGeneralStructural
HEREBY FILING TEMPORARY INSTALLATION OF SEVEN (7) TENTS AT PACKER GARDEN AREA OSP FOR ONE DAY EVENT AS PER PLANS
On file for this project
4 documents · 1 drawing sheet
ROOF REPAIR (MODIFICATION TO STAIRCASE, REORIENTATION OF THE PATIO) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS,OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
25 documents · 8 drawing sheets