← Back
BuildNYC
Over six families without stores
170 PALMETTO STREET
BROOKLYN · BIN 3326165
💬 Discuss this project
1983Year Built
3Stories
C1Building Class
R6Zoning
99,040 sfGross Floor Area
96Units
LL97 CoveredRent Stabilized26 Active Violations 2 likely answered ▸FDNY Report ↗
Over six families without stores · Owner of record: Hope Gardens 1 · 120,200 sf lot · 0.82 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 31p · 1 filing · 4 docs
Floor 21p · 1 filing · 4 docs
Floor 1Unit 1B, Unit 1C, Unit 1D2p · 1 filing · 4 docs
CellarHope Gardens - Group D Hope Gardens - Group DUnder Construction43p · 2 filings · 20 docs
Site & exteriorHope Gardens - Group D Hope Gardens - Group DUnder Construction32p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Pennrose4008/28/2026
New York City Housing Authority1103/21/2026
Hope Gardens I403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Cameron Engineering905/05/2026
IMEG Consultants103/01/2026
Christopher Compton405/13/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECC803/21/2026
JM Zoning1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Procida ConstructionGeneral Contractor504/09/2026
Interstate Restorationspecialty_contractor303/21/2026
Miller Plumbing & HeatingPlumbing307/08/2026
Dudley JamalElectrical103/21/2026
Dudley & Associates Lic. ElectricElectrical103/21/2026
G.M.A. Plumbing & HeatingPlumbing107/08/2026
?John SR MariElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons1061005/05/2026
Environmental Code Consulting5516405/13/2022
Building Lifecycle
09/27/2026
Permit expired, never signed off — Plumbing
The city's record still shows this permit as issued, with no sign-off on its filing
B00963163-S1-PL
06/03/2026
Permit renewed — Plumbing
Renewed without changes
B00963163-S1-PL
05/20/2026
Boiler inspection report filed
Initial · no defects · Accepted
05/05/2026
Filed — Alteration
DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER AND GAS PIPING FROM THE CEL TO A NEW BOILER POD. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00963163-P7
04/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
77 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedMiller Plumbing & Heating06/03/2026
DOB NOWMechanical SystemsPermit IssuedProcida Construction03/24/2026
DOB NOWBoiler EquipmentSigned-offMiller Plumbing & Heating12/31/2025
DOB NOWMechanical SystemsPermit IssuedProcida Construction03/26/2025
DOB NOWPlumbingPermit IssuedMiller Plumbing & Heating11/21/2024
DOB NOWMechanical SystemsPermit IssuedProcida Construction04/03/2024
DOB NOWGeneral ConstructionSigned-offInterstate Restoration05/04/2022
DOB NOWBoiler EquipmentSigned-offG.M.A. Plumbing & Heating01/12/2022
BISBLISSUEDJ-J Plumbing03/24/2022
BISPLISSUEDJ-J Plumbing02/07/2022
BISBLISSUEDJ-J Plumbing03/30/2021
BISPLISSUEDJ-J Plumbing01/19/2021
BISOTISSUEDProcida Construction12/10/2020
BISMHISSUEDProcida Construction12/10/2020
BISBLISSUEDJ-J Plumbing11/30/2020
BISOTISSUEDBright Power Installation06/26/2020
BISOTISSUEDProcida Construction05/05/2020
BISMHISSUEDProcida Construction05/05/2020
BISBLISSUEDJ-J Plumbing01/21/2020
BISPLISSUEDJ-J Plumbing01/21/2020
BISOTRE-ISSUEDProcida Construction10/03/2019
BISMHISSUEDProcida Construction10/03/2019
BISPLISSUEDNYC Housing Authority11/26/2014
BISPLISSUEDNYC Housing Authority11/14/2012
BISBLISSUEDNYC Housing Authority11/14/2012
1 project · most recent 05/05/2026
Heating Systems
FiledStatusContractorScope
05/05/2026Permit IssuedProcida ConstructionHeating Systems
1 project · most recent 05/05/2026
FiledStatusContractorScope
05/05/2026———
1 project · most recent 05/05/2026
Gas Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
05/05/2026Permit IssuedMiller Plumbing & HeatingGas, Plumbing-Sprinkler, Storm, Water/Sanitary
4 projects · most recent 05/20/2026
General Wiring
FiledStatusContractorScope
05/20/2026Permit IssuedHI-Lights Electrical—
06/29/2024Permit IssuedSNB Electrical Contng—
05/28/2020CompleteVenture Home Solar—
02/26/2020CompleteRamdeen's Electric ContractingGeneral Wiring
1 project · most recent 05/05/2026
Steel
FiledStatusContractorScope
05/05/2026Permit IssuedMiller Plumbing & HeatingSteel
1 project · most recent 05/05/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
05/05/2026Permit IssuedMiller Plumbing & HeatingTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
01/08/2026Pass-Final Boiler Equipment InspectionPassView ↗
01/23/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/01/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 64
DateRequirementInspectorRole
04/29/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
04/29/2026Sprinkler SystemsGEORGE GHEBRYALspecial
04/29/2026Tenant Protection Plan Compliance—special
02/17/2026Structural Steel - High Strength Bolting—special
02/17/2026Structural Steel - Details—special
02/17/2026Structural Stability – Alterations of existing buildings—special
02/17/2026Excavations - Sheeting, Shoring, and Bracing—special
02/17/2026Concrete - Cast-In-Place—special
02/17/2026Subsurface Investigations (Borings/Test Pits)—special
02/17/2026Tenant Protection Plan Compliance—special
02/17/2026Subsurface Conditions – Fill Placement & In-Place Density—special
02/17/2026Subgrade Inspections—special
02/17/2026Structural Steel - Welding—special
02/17/2026Footing and Foundation—progress
02/17/2026Final—progress
12/12/2025Post-installed AnchorsGEORGE GHEBRYALspecial
12/12/2025Tenant Protection Plan Compliance—special
12/12/2025Sprinkler SystemsGEORGE GHEBRYALspecial
12/12/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
12/10/2025Tenant Protection Plan Compliance—special
12/10/2025Sprinkler SystemsGEORGE GHEBRYALspecial
12/10/2025Post-installed AnchorsGEORGE GHEBRYALspecial
12/10/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
09/17/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
09/17/2025Sprinkler SystemsGEORGE GHEBRYALspecial
Latest 25 of 64.
211 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account